CSCA study materials
CSCA study resources

CSCA study plan

CSCA · Give each week a clear focus.

8 weeks · About 8 hours per week

Week 1

Supply Chain Management

  • Define supply chain management and map the end-to-end flow of materials, information, and cash across plan, source, make, deliver, and return.

  • Explain how the bullwhip effect arises and list at least four operational causes (e.g., order batching, price promotions, rationing and shortage gaming).

  • Compare push, pull, and push-pull (hybrid) supply chain designs and identify which product types fit each.

  • Calculate basic inventory turnover and days of supply from given cost-of-goods and average inventory figures.

  • Draft a one-page glossary of 20 core SCM terms with your own definitions and one example each.

Your checkpoint

A one-page supply chain process map plus a 20-term glossary, self-scored against the syllabus learning outcomes.

Week 2

Supply Chain Management

  • Distinguish the major supply chain performance metrics (perfect order fulfillment, cash-to-cash cycle, fill rate, forecast accuracy) and state what each does and does not capture.

  • Analyze a short case scenario and identify where a firm's supply chain strategy is misaligned with its competitive priorities.

  • Explain the role of segmentation, postponement, and risk pooling in reducing cost while maintaining service levels.

  • Compute the cash-to-cash cycle from days inventory outstanding, days sales outstanding, and days payable outstanding.

  • Write a 300-word recommendation for a fictional manufacturer that is choosing between centralized and decentralized distribution.

Your checkpoint

A 300-word written recommendation applying at least three SCM metrics and one segmentation or postponement concept.

Week 3

Logistics and Procurement

  • Compare the five main transportation modes (road, rail, air, water, pipeline) on cost per unit, speed, capacity, and suitability.

  • Explain Incoterms categories and correctly match at least six common terms (EXW, FOB, CIF, DAP, DDP, FCA) to who bears cost, risk, and customs responsibility.

  • Describe the procurement cycle from need identification through supplier selection, contracting, and payment.

  • Calculate total landed cost for a purchase that includes freight, duties, insurance, and handling.

  • Differentiate centralized versus decentralized procurement and list two advantages of each.

Your checkpoint

A total landed cost worksheet comparing two suppliers, with a one-paragraph recommendation.

Week 4

Logistics and Procurement

  • Evaluate supplier selection criteria using a weighted scorecard and justify the weighting choices.

  • Explain the purpose and structure of an RFI, RFP, and RFQ and select the appropriate instrument for three given buying situations.

  • Describe key contract terms that affect supply risk: lead time, payment terms, penalties, warranty, and force majeure.

  • Outline warehouse layout and material handling principles that reduce travel time and picking errors.

  • Identify three procurement ethics and compliance risks and the controls that mitigate them.

Your checkpoint

A completed weighted supplier scorecard for three fictional suppliers with a documented award decision.

Week 5

Demand and Materials Planning

  • Distinguish independent from dependent demand and explain which forecasting and planning methods apply to each.

  • Compute a moving average and a simple exponential smoothing forecast from a given demand history, and calculate the resulting forecast error (MAD or MAPE).

  • Describe the components of demand (trend, seasonality, cycle, random) and choose an appropriate forecasting technique for each pattern.

  • Explain the structure of an MRP record: gross requirements, scheduled receipts, projected on-hand, net requirements, planned order releases.

  • Distinguish level, chase, and mixed production planning strategies and their workforce and inventory implications.

Your checkpoint

A worked forecasting problem set (moving average, exponential smoothing, MAD) and a completed MRP table for a simple bill of materials.

Week 6

Demand and Materials Planning & Lean and Six Sigma

  • Calculate safety stock from a given service level, demand variability, and lead time, and explain the trade-off between service level and inventory cost.

  • Apply ABC classification to an inventory list and state differentiated control policies for A, B, and C items.

  • Define the seven wastes (muda) and identify at least two examples of each in a distribution or office process.

  • Explain the five Lean principles and how value stream mapping exposes non-value-added time.

  • Describe the DMAIC phases and the type of tool commonly used in each (e.g., SIPOC, Pareto, control chart).

Your checkpoint

An ABC analysis of a 20-item inventory list with a safety stock calculation and a one-page value stream map of a simple process.

Week 7

Lean and Six Sigma

  • Distinguish common-cause from special-cause variation and select the correct control chart type for variable versus attribute data.

  • Interpret a control chart for out-of-control signals using the standard rules (points beyond limits, runs, trends).

  • Calculate process capability (Cp and Cpk) from given specification limits and process standard deviation, and interpret the result.

  • Explain the Define and Measure phases of DMAIC, including how to write a problem statement and select CTQs.

  • Describe how 5S, kanban, and poka-yoke support standardized work and error prevention.

Your checkpoint

A capability analysis (Cp/Cpk) with a control chart interpretation and a one-page DMAIC project charter.

Week 8

Supply Chain Management & Logistics and Procurement & Demand and Materials Planning & Lean and Six Sigma

  • Synthesize the four domains by explaining how demand plans feed procurement, logistics, and Lean improvement priorities.

  • Complete a timed 60-question mixed practice set and score at least 75% overall.

  • Review every missed practice question, write a corrected explanation for each, and tag it to the relevant domain.

  • Recite from memory the key formulas for inventory turnover, cash-to-cash cycle, exponential smoothing, safety stock, and Cp/Cpk.

  • Build a personal one-page formula and concept sheet to use during final review.

Your checkpoint

A scored 60-question practice exam (target 75% or higher) with a written error log and a final one-page formula sheet.

Milestones

Week 2: Score at least 70% on a 20-question Domain 1 self-quiz and explain the bullwhip effect and cash-to-cash cycle without notes.

Week 4: Complete the supplier scorecard and total landed cost worksheet with correct arithmetic, and score at least 70% on a 20-question Domain 2 self-quiz.

Week 6: Produce correct forecasts, MAD, MRP table, and safety stock figures on the first attempt, and score at least 70% on a mixed Domain 3 and 4 quiz.

Week 8: Achieve at least 75% on the timed 60-question mixed practice set, with every missed item logged and corrected.