CSI CDT key terms
CSI CDT · Get comfortable with the vocabulary.
- Construction Document (CD) Set
- Related: Design Intent, Specification, Drawing Index
The coordinated package of drawings and specifications, issued at a defined completion stage, that conveys the design intent and contractual requirements needed to bid, permit, and build the project.
- Design Intent
- Related: Performance Specification, Prescriptive Specification
The designer's documented performance, quality, and appearance objectives for the work, which contractors must satisfy even when means and methods remain their responsibility.
- Drawing Index
- Related: Sheet Numbering, Revision Cloud
A sheet-by-sheet listing, usually placed early in the set, that names each drawing number, title, and revision status so users can confirm they hold a complete set.
- Sheet Numbering
- Related: Drawing Index, Cross-Reference
The discipline-prefixed numbering convention (for example A-101, S-201, M-301) that orders drawings by trade and sequence and supports cross-referencing from specifications.
- Revision Cloud
- Related: Addendum, As-Built Drawing
A scalloped graphic marking changed areas of a drawing, paired with a revision number or symbol and a dated revision block entry to track modifications after issue.
- Addendum
- Related: Bulletin, Revision Cloud, Request for Information
A written or graphic modification issued before bid opening that clarifies, corrects, or changes the bidding documents; bidders must acknowledge each addendum in their proposal.
- Bulletin
- Related: Addendum, Change Order, Request for Information
A post-award written directive, often called an architect's supplemental instruction, that clarifies or changes the work without immediately adjusting contract price or time.
- Change Order
- Related: Bulletin, Construction Change Directive, Unit Price
A written instrument signed by owner and contractor that modifies the contract sum, contract time, or scope after award, typically priced from unit rates or negotiated markup.
- Construction Change Directive
- Related: Change Order, Bulletin
A written owner-directed instruction to proceed with a change before price and time are agreed, later converted into a change order once costs are settled.
- Request for Information (RFI)
- Related: Addendum, Bulletin, Submittal
A formal written question from the contractor seeking clarification of ambiguous or missing information, tracked with a log and answered by the design team as a contract document.
- Submittal
- Related: Shop Drawing, Submittal Register, Review Stamp
Product data, shop drawings, samples, or mockups the contractor transmits for review to show how proposed materials and assemblies conform to the specified requirements.
- Shop Drawing
- Related: Submittal, Review Stamp
A contractor-prepared detail drawing showing fabrication, dimensions, and installation of a component, reviewed by the designer for conformance with design concept and information.
- Submittal Register
- Related: Submittal, Review Stamp
A schedule listing every required submittal, its specification section reference, required lead time, review period, and current status, used to track the approval workflow.
- Review Stamp
- Related: Submittal, Shop Drawing
The designer's marked action on a returned submittal, such as approved, approved as noted, revise and resubmit, or rejected, which defines whether work may proceed.
- As-Built Drawing
- Related: Record Drawing, Revision Cloud
A marked-up record maintained by the contractor showing actual installed conditions, dimensions, and routing, later used to prepare record documents for the owner.
- Record Drawing
- Related: As-Built Drawing
The final drawing set, often sealed, that transfers as-built information to the owner as a deliverable for operations, maintenance, and future modifications.
- Specification
- Related: MasterFormat, Part 1 General, Prescriptive Specification
The written portion of the contract documents describing products, execution, quality assurance, and administrative requirements for each work section, complementing the drawings.
- MasterFormat
- Related: Section Number, Specification, Division 01
The CSI-developed numbering system organizing construction work into divisions and sections by facility element or trade, providing the standard structure for specifications and cost data.
- Section Number
- Related: MasterFormat, SectionFormat
A six-digit identifier assigned under MasterFormat, where the first two digits give the division and the remaining pairs subdivide scope into a specific work section.
- SectionFormat
- Related: Part 1 General, Part 2 Products, Part 3 Execution
The CSI-recommended three-part organization of specification sections: Part 1 General, Part 2 Products, and Part 3 Execution, applied consistently across all sections.
- Part 1 General
- Related: SectionFormat, Submittal, Part 3 Execution
The section part covering administrative and procedural requirements such as submittals, quality assurance, delivery, storage, and references to other sections.
- Part 2 Products
- Related: SectionFormat, Proprietary Specification, Basis-of-Design
The section part naming acceptable materials, manufacturers, components, and fabrication tolerances, often through proprietary, descriptive, performance, or reference standards.
- Part 3 Execution
- Related: SectionFormat, Part 1 General
The section part describing field installation, application, preparation, tolerances, and finishing, telling the contractor how the specified products must be put in place.
- Division 01
- Related: MasterFormat, Substitution Request
The General Requirements division containing administrative and procedural sections such as submittals, substitutions, quality control, and temporary facilities that govern all other work.
- Prescriptive Specification
- Related: Performance Specification, Proprietary Specification, Design Intent
A specification that states the exact products, materials, or methods required, leaving the contractor little discretion and placing responsibility for performance on the designer.
- Performance Specification
- Related: Prescriptive Specification, Design Intent
A specification stating required results such as strength, capacity, or durability, allowing the contractor to select products and methods that meet those measurable criteria.
- Proprietary Specification
- Related: Or-Equal Clause, Basis-of-Design
A specification naming a specific manufacturer or product, usually with an or-equal clause, used when a particular item is essential to function, appearance, or maintenance.
- Or-Equal Clause
- Related: Proprietary Specification, Substitution Request
Language permitting substitution of an unnamed product judged equivalent to the named one, setting the standard against which alternate offers are evaluated by the designer.
- Substitution Request
- Related: Or-Equal Clause, Division 01
A formal contractor request to use a product other than the specified one, submitted with supporting data and evaluated against the specified item's performance and quality.
- Basis-of-Design
- Related: Proprietary Specification, Or-Equal Clause
The named product or system used to establish the required performance, dimensions, and quality benchmark against which proposed substitutions are compared.
- Reference Standard
- Related: Part 2 Products, Specification
A published industry or government standard, such as ASTM or ANSI, cited in a specification to define test methods, material properties, or installation quality.
- Product Data Sheet
- Related: Submittal, Technical Evaluation
Manufacturer-published literature describing a product's composition, physical properties, limitations, and installation requirements, commonly submitted for design review.
- Technical Evaluation
- Related: Product Data Sheet, Substitution Request
The designer's comparison of candidate products against specification criteria, standards, and project conditions before accepting, rejecting, or requesting additional information.
- Sustainability Documentation
- Related: Product Data Sheet, Reference Standard
Declarations, certifications, and reports such as environmental product declarations or recycled-content statements that verify a product's environmental attributes claimed in the specification.
- Mockup
- Related: Submittal, Part 3 Execution
A full-size physical sample of an assembly built on site or in a factory to establish workmanship quality and appearance standards before general installation begins.
- Bid Form
- Related: Unit Price, Alternate
The document on which contractors enter prices for each scope item, alternates, and unit rates, forming the basis for award and later contract execution.
- Alternate
- Related: Bid Form, Unit Price
A defined change in scope, material, or method priced separately in the bid so the owner can accept or reject it without rebidding the base work.
- Unit Price
- Related: Bid Form, Change Order
A stated cost per unit of measurement for a work item, used to value added or deleted quantities and to price changes when scope is uncertain.
- Preconstruction Conference
- Related: Submittal Register, Request for Information
A meeting held after award and before mobilization where owner, designer, and contractor confirm schedules, submittal procedures, communication lines, and administrative responsibilities.
- Contract Documents
- Related: Specification, Change Order
The complete legal set comprising agreement, conditions, drawings, specifications, addenda, and modifications that together define the parties' rights and obligations.