CSQP flashcards
CSQP · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Cost of poor quality
- Total cost of failing to meet requirements, comprising prevention, appraisal, internal failure, and external failure costs. External failure is usually the largest and least recoverable category.
- Kraljic matrix
- A portfolio tool plotting profit impact against supply risk. Quadrants are non-critical, leverage, bottleneck, and strategic, each implying a different supplier management approach.
- Quality trilogy
- Juran's framework of quality planning, quality control, and quality improvement. Each supplier quality program element should be mapped to one of the three activities.
- Management review inputs
- ISO 9001 clause 9.3 requires review of audit results, nonconformities, supplier performance, and resource adequacy. Outputs include improvement decisions and resource actions.
- Conditional supplier approval
- Approval granted before full qualification is complete. It must carry an expiry date, defined exit criteria, and a containment plan for parts shipped during the period.
- Qualification sequence
- Typical order: legal and financial screening, capability and capacity review, quality system assessment, sample or PPAP approval, then conditional or full approval.
- ANSI/ASQ Z1.4
- An attribute acceptance sampling standard indexed by lot size and AQL. It yields sample size and acceptance number, not a fixed universal sample size.
- Single-source justification
- Documentation required when only one supplier is approved. It includes a risk assessment, business rationale, and an alternate-source development plan with a target date.
- PPM calculation
- Parts per million defective equals defective units divided by total units received, multiplied by one million. The numerator definition must be fixed before comparing suppliers.
- Cpk
- Process capability index equal to the minimum of the upper and lower specification distances divided by three sigma. It is meaningful only for a stable, in-control process.
- OEE
- Overall equipment effectiveness equals availability times performance times quality. It validates demonstrated capacity better than nameplate capacity claims from a supplier.
- PPAP level 3
- A default submission level providing part samples, dimensional results, material and performance test data, and appearance approval. Level 1 provides only a warrant.
- On-time delivery metric
- Percentage of scheduled lines delivered within a defined tolerance window. The definition must state whether early delivery counts as on time.
- 8D problem solving
- Eight-discipline method: team, problem description, containment, root cause, corrective action selection, implementation and validation, prevention, and recognition.
- Corrective action verification
- Confirmation that a fix worked, using data collected after a defined period or number of lots. Paperwork closure alone does not demonstrate effectiveness.
- Poka-yoke
- An error-proofing device or design that prevents a defect from being made or passed. It is preferred over inspection, which is a detection control with known escape rates.
- Kaizen event
- A short, bounded improvement workshop with a defined baseline, target, and fixed duration. It addresses a specific process rather than building systemic capability.
- Risk score
- Likelihood multiplied by impact, with both scales defined numerically. Consistent scales allow comparison and prioritization across the entire supply base.
- FMEA RPN
- Risk priority number equals severity times occurrence times detection. High-severity items warrant action regardless of RPN, since severity cannot be offset.
- Business continuity assessment
- Review of single points of failure such as sole-source tooling, single-site production, single utilities, and key-person dependency that could halt supply.
- Sub-tier visibility
- Knowledge of a supplier's critical sub-suppliers and their locations. It is required for regulated or high-risk commodities to expose hidden concentration risk.
- Risk mitigation hierarchy
- Ordered options of avoid, reduce, transfer, and accept. Transfer includes inventory buffers, dual sourcing, and insurance; acceptance requires documented rationale.
- ISO 9001 clause structure
- Clauses 4 context, 5 leadership, 6 planning, 7 support, 8 operation, 9 performance evaluation, and 10 improvement. Auditors map findings to these clauses.
- Second-party audit
- An audit performed by a customer or buyer on a supplier. It differs from first-party internal audit and third-party certification audit in purpose and independence.
- Major nonconformity
- An audit finding indicating system breakdown or product risk. It typically requires containment and a corrective action response faster than a minor finding.
- Turtle diagram
- A process audit map showing inputs, outputs, resources, methods, personnel, and performance measures. It structures a process audit around one defined process.
- Gauge R&R
- A measurement systems analysis of repeatability and reproducibility. Below 10 percent is generally acceptable; above 30 percent requires measurement system improvement.
- Control chart limits
- Limits computed from process data, typically the mean plus or minus three sigma. Specification limits must never be plotted as control limits.
- Producer's risk
- The alpha risk of rejecting a conforming lot in acceptance sampling. It depends on sample size and acceptance number, along with the chosen AQL.
- BATNA
- The best alternative to a negotiated agreement. A supplier with a strong BATNA has less incentive to concede on price, lead time, or terms.
- ZOPA
- The zone of possible agreement between the reservation points of both parties. Without overlap, no deal is reachable regardless of negotiation technique.
- Thomas-Kilmann modes
- Five conflict modes: competing, collaborating, compromising, avoiding, and accommodating. Collaborating requires both high assertiveness and high cooperativeness.