DCP registration
Connecticut home improvement contractors must register with the Department of Consumer Protection and display the registration number on contracts and advertisements.
Three-day cancellation
Homeowners solicited at their residence have three business days to cancel a home improvement contract; the contractor must provide conspicuous written notice and a duplicate copy.
CUTPA
Connecticut Unfair Trade Practices Act prohibits unfair or deceptive acts in trade or commerce and can support attorney's fees and punitive damages for violations.
LLC liability shield
A limited liability company protects owners' personal assets from business debts but does not shield against personal negligence or personally guaranteed obligations.
Workers' compensation
Connecticut requires workers' compensation coverage for employers with one or more employees; sole proprietors and certain officers may elect coverage.
Surety bond
A three-party guarantee where the surety assures the owner that the contractor will perform; bonding capacity depends on financial strength and working capital.
Certificate of occupancy
Issued by the building official after final inspections confirm the building complies with the code and is safe for occupancy.
Stop-work order
Authority of the building official to halt work that violates the code or creates an unsafe condition until corrections are made.
Fall protection threshold
OSHA requires fall protection in construction at heights of 6 feet or more using guardrails, safety nets, or personal fall arrest systems.
Excavation protective system
Excavations 5 feet or deeper require sloping, shoring, or shielding; a competent person must inspect daily and after rain.
HazCom requirements
Employers must maintain safety data sheets, label hazardous chemicals, and train employees on chemical hazards under OSHA's Hazard Communication standard.
Concrete 28-day strength
Concrete compressive strength is specified at 28 days; field testing includes slump, air content, and cylinder breaks per ACI standards.
Control layers
Building envelopes manage water, air, vapor, and thermal transfer; continuity at transitions such as windows and roof-wall junctions is critical.
Ice barrier
Self-adhering membrane installed at roof eaves in cold climates to prevent ice dam water from backing up under shingles.
Frost depth footing
Footings must extend below the frost line, typically about 42 inches in Connecticut, to prevent frost heave.
Shear wall
A wall designed to resist lateral loads from wind or seismic forces and transfer them to the foundation through hold-downs and anchor bolts.
Deflection limit
Maximum allowable bending deflection for floors is typically L/360 and for roofs L/240, where L is the span length.
Drain slope
Plumbing drain lines for 2-inch and smaller pipe slope at 1/4 inch per foot; larger lines may slope at 1/8 inch per foot.
Manual J load calculation
Method for sizing HVAC equipment based on building envelope, orientation, and climate data; required before equipment selection.
Rough-in inspection
Inspection of plumbing, electrical, and mechanical systems after installation but before insulation and drywall conceal the work.
Critical path
The longest sequence of dependent activities in a project network; any delay on the critical path delays project completion.
Float
The amount of time an activity can be delayed without delaying the project completion date; total float versus free float differ.
Retainage
A percentage of each progress payment withheld by the owner, commonly 5-10%, until substantial completion or final acceptance.
Change order
A written modification to the contract scope, price, or schedule signed by the owner and contractor; oral changes create disputes.
Registration display
Connecticut requires the contractor's registration number to appear in advertisements and on written home improvement contracts.
Deposit limit
Connecticut law limits the deposit a home improvement contractor may collect before work begins; verify the current statutory percentage before signing.
Additional insured
Status giving the owner or general contractor protection under a subcontractor's liability policy for claims arising from the sub's work.
Building permit
Authorization from the local building official required before construction, alteration, or demolition; work must conform to approved plans.
Competent person
An individual capable of identifying existing and predictable hazards and authorized to take prompt corrective action, required for excavations and scaffolds.
Vapor retarder
A material that limits moisture vapor diffusion through the building envelope; placement depends on climate and assembly design.
Header sizing
Structural headers span openings and carry loads from above; size is determined by span, load, and lumber species and grade.
Backflow prevention
A device or assembly that prevents contamination of the potable water supply from reverse flow; required where cross-connections may occur.