Pancyprian TS Interior Design III Θ.Κ. cheat sheet
Pancyprian TS Interior Design III Θ.Κ. · Keep the key ideas within reach.
Design Fundamentals: Elements and Principles of Interior Design
Elements of design: space, form, line, colour, texture, light, pattern. Principles: balance (symmetrical, asymmetrical, radial), rhythm (repetition, progression, transition), emphasis (focal point), proportion, scale, harmony, unity, variety.
Rule of line function: vertical lines add height and formality; horizontal lines widen and calm; diagonal lines add dynamism and movement; curved lines soften and guide circulation.
Golden ratio ≈ 1:1.618; the 60-30-10 rule allocates 60% dominant colour, 30% secondary, 10% accent. Both are proportion tools, not laws.
Symmetrical balance suits formal, classical and monumental interiors; asymmetrical balance suits relaxed, contemporary and small rooms where a heavy element must be offset by a lighter, larger one.
Scale relates an object to the human body; proportion relates parts to each other. A 2.2 m ceiling with a 1.5 m-wide chandelier fails on scale even if proportion within the fixture is correct.
Unity is achieved by repeating one element (colour, material, geometric motif) at least three times across a room; variety prevents monotony but must not break the dominant theme.
Texture affects perceived colour: a glossy surface reflects more light and reads lighter and cooler; a matte or rough surface absorbs light and reads darker and warmer.
Emphasis hierarchy: one primary focal point per space (fireplace, view, artwork), supported by secondary accents; more than one competing focal point fragments the composition.
Interior Space Planning and Functional Layout
Circulation rules: primary circulation ≥ 1,200 mm wide; secondary ≥ 900 mm; single-person passage ≥ 600 mm; two people passing ≥ 1,200 mm.
Dining clearances: 750–900 mm per diner at the table edge; 900–1,100 mm between table edge and wall for seated access; 1,000–1,200 mm for serving behind chairs.
Kitchen work triangle: sink, hob and refrigerator, each leg 1.2–2.7 m and total 4–8 m; the triangle must not be crossed by primary traffic.
Bed clearances: 600 mm minimum on at least one side, 750–900 mm preferred both sides; 900 mm at the foot for a wardrobe or dresser access.
Bathroom minimums: 760 mm in front of a WC and basin, 600 mm beside a WC, 900 × 900 mm shower enclosure; a 1,500 mm turning circle for wheelchair access.
Zoning methods: physical (walls, partitions, level change), visual (ceiling change, flooring change, colour), and implied (furniture arrangement, rugs, lighting).
Adjacency logic: public/social zones (living, dining) near the entrance; private zones (bedrooms) buffered; service zones (kitchen, bath, laundry) clustered for plumbing economy.
Ergonomic benchmarks: worktop 850–900 mm; dining table 720–750 mm high; seat height 430–450 mm; desk 720–750 mm; eye level seated 1,100–1,200 mm.
Colour Theory and Colour Schemes in Interiors
Colour wheel relationships: monochromatic (one hue, varied value/saturation); analogous (adjacent hues); complementary (opposite); split-complementary (opposite plus its two neighbours); triadic (three evenly spaced); tetradic (two complementary pairs).
Achromatic = white, black and greys, no hue. Neutral schemes use low-saturation hues plus achromatic tones; they enlarge perceived space.
Value contrast drives legibility: light walls recede and enlarge a room; dark walls advance and compress; a dark ceiling lowers perceived height, a light ceiling raises it.
Warm hues (red, orange, yellow) advance and raise perceived temperature; cool hues (blue, green, violet) recede and lower it. Rooms facing north benefit from warm schemes to offset cool daylight.
Simultaneous contrast: a colour appears different against different backgrounds - grey looks warm on blue, cool on orange. Always test samples against the actual adjacent finish.
Metamerism: two samples matching under one light source may mismatch under another. Specify and approve colours under the actual or specified lamp type (e.g. 3000 K vs 4000 K).
Light reflectance value (LRV) 0–100: ceilings ideally ≥ 80, walls 60–75, floors 20–40 for balanced luminance; very low-LRV walls require more artificial light.
Cultural and psychological notes: white is mourning in parts of East Asia and Cyprus Orthodox tradition uses white for festivity; blue is protective in Mediterranean and Cypriot vernacular; red signals luck in China, danger in Western contexts.
Materials, Finishes and Furnishings
Flooring selection criteria: traffic class (domestic 21–23, commercial 31–34 per EN 685), moisture exposure, underfloor heating compatibility, acoustic impact, slip resistance (R rating / DIN 51130).
Hard flooring: solid timber (sensitive to moisture, needs acclimatisation), engineered timber (stable, suitable over underfloor heating), laminate (wear layer AC3–AC5), LVT, ceramic/porcelain (PEI class), natural stone (sealed, heavy).
Soft flooring: wool is durable, fire-resistant and resilient; nylon is the most hard-wearing synthetic; polypropylene is moisture-resistant but less resilient; carpet tiles allow access to raised floors.
Wall finishes: paint sheen guide - matt for ceilings and low-traffic walls, eggshell/satin for general walls, semi-gloss/gloss for kitchens, bathrooms and trim; washability class per EN 13300.
Wallcovering: vinyl wallcovering is scrubbable and suited to corridors and healthcare; natural fibres and paper need low-humidity rooms; wide-width (1.06 m) hangs faster with fewer seams.
Upholstery durability is graded in Martindale rubs (domestic ≈ 20,000; contract ≈ 25,000–40,000; heavy contract 40,000+) or Wyzenbeek double rubs; check abrasion, lightfastness and pilling.
Furniture types by function: case goods (storage), occasional (accent), task (work), and built-in/joinery. Selection criteria: dimensions, ergonomics, durability, maintenance, fire performance.
Fire and safety: upholstered furniture in public interiors must meet national fire regulations; curtains and wallcoverings need appropriate reaction-to-fire classification; escape routes require low-flame-spread finishes.
Lighting Design
Lighting layers: ambient (general), task (focused work light), accent (highlighting objects or surfaces), and decorative (feature fixture). A complete scheme layers at least three.
Luminous flux in lumens (lm) is light output; illuminance in lux (lx) is light falling on a surface; 1 lx = 1 lm/m². Efficacy = lm/W.
Illuminance targets (typical): living 100–200 lx, kitchen worktop 300–500 lx, dining 150–300 lx, bathroom mirror 300–500 lx, desk task 300–500 lx, circulation 100 lx.
Colour temperature: 2700–3000 K warm (residential, hospitality), 3500–4000 K neutral (offices, retail), 5000–6500 K cool (clinical, industrial). Colour rendering index (CRI/Ra) ≥ 80 general, ≥ 90 for colour-critical tasks.
Beam angle and spacing: narrow beams (15–24°) for accent, medium (24–40°) for general, wide (>60°) for wall-wash; spacing roughly equals mounting height for even downlight coverage.
Daylighting: daylight factor = indoor illuminance ÷ outdoor illuminance × 100%; a room needs roughly 2% for adequate daylight; glazing area typically 15–20% of floor area for good daylight.
Energy: LED efficacy 100–150+ lm/W versus halogen ≈ 20 lm/W; dimming, occupancy sensors, daylight-linked controls and zoning reduce consumption; note EU energy label classes A–G.
Luminaire types: downlight, pendant, track/spot, wall-wash, cove (indirect), linear, and floor/table lamps; glare controlled with baffles, louvers and UGR values in workspaces.
Technical Drawing and Representation for Interiors
Standard scales: 1:1, 1:5, 1:10 for details; 1:20 and 1:50 for room plans and elevations; 1:100 and 1:200 for building plans. State the scale on every drawing.
Plan conventions: cut at ~1,200 mm above finished floor level; show walls poché, door swings, window openings, stairs with direction arrow, and a north arrow.
Elevation conventions: show finished floor level (FFL), ceiling line, openings, fixtures, and a title with the room name and viewing direction. Sections cut vertically through the space and show structure and heights.
Dimensioning rules: dimension lines outside the drawing, in a chain from a common datum; give overall and part dimensions; never dimension the same item twice; units in millimetres on construction drawings.
Line hierarchy: heavy lines for cut elements, medium for visible edges, light for furniture and fittings, dashed for hidden elements, and centre lines for symmetry.
Drawing set for an interior scheme: location plan, demolition/construction plans, furniture layout plan, reflected ceiling plan (RCP), elevations, sections, details, schedules and specifications.
RCP content: luminaires, switching groups, ceiling heights, bulkheads, air diffusers, smoke detectors, sprinklers and access panels - coordinated with the layout plan.
Presentation: mood board (concept and atmosphere), sample board (actual material samples with labels), rendered perspective, and a written concept statement; keep one consistent graphic language.
Building Construction and Services Relevant to Interiors
Partition types: stud partitions (metal studs at 400/600 mm centres with plasterboard), masonry partitions, and glazed partitions; fire rating and acoustic rating (Rw) must be specified.
Plasterboard build-ups: 12.5 mm standard, 15 mm for improved acoustic/fire, double-layer for higher ratings; a typical 100 mm stud partition achieves Rw ≈ 40–50 dB depending on layers and insulation.
Ceilings: suspended grid (600 × 600 mm module), plasterboard, and open/exposed. Plenum depth must accommodate services; access panels are required at valves, dampers and junction boxes.
Openings: lintels carry loads over openings; door widths - 800–900 mm internal, 900–1,000 mm accessible/escape; thresholds should be flush for accessibility.
Electrical coordination: socket outlets at 300 mm above floor, switches at 1,000–1,200 mm, kitchen worktop outlets at 1,100 mm; separate circuits for lighting, sockets, kitchen appliances and HVAC.
Plumbing coordination: soil and waste pipes need falls (typically 1:40 to 1:110 depending on diameter); wet walls are clustered to reduce runs; floor drains and waterproofing in wet rooms.
Fire safety: escape routes must remain clear and be protected; fire doors self-closing with intumescent seals; materials in escape routes need limited reaction-to-fire; smoke and heat detectors per code.
Ventilation and moisture: bathrooms and kitchens need mechanical extract, with typical rates around 15 l/s intermittent for bathrooms; uncontrolled moisture causes mould and finish failure.
History and Styles of Interior Design and Decorative Arts
Ancient Greek and Roman: post-and-lintel and column orders (Doric, Ionic, Corinthian); Roman innovation of the arch, vault and dome (Pantheon); mosaic floors, frescoed walls, and the atrium house plan.
Cyprus: Roman villas with mosaic floors at Paphos (Dionysos mosaic, 2nd–3rd c. AD); Byzantine basilicas and churches with domes and frescoes; Lusignan Gothic (Bellapais Abbey); Venetian and Ottoman layers in Nicosia's architecture.
Byzantine and medieval: central domed plan, mosaic and fresco interiors, marble revetment; later Gothic introduces the pointed arch, rib vault and stained glass.
Renaissance and Baroque: Renaissance returns to symmetry, proportion and classical orders (Palladio); Baroque adds movement, curved forms, gilding, stucco and dramatic chiaroscuro lighting.
18th–19th century: Rococo (asymmetry, pastel, ornament), Neoclassicism (Robert Adam, restrained classical), Regency/Empire, Victorian revivalism, and the Arts and Crafts movement rejecting industrial production.
Modernism: Bauhaus (1919–1933) unites craft and industry; De Stijl uses primary colour and orthogonal planes; Le Corbusier's five points and 'machine for living'; Mies's 'less is more'; open plan, white walls, tubular steel furniture.
Post-war and late 20th century: Mid-century modern (Eames, Saarinen), Brutalism (raw concrete), Postmodernism (Memphis, historical quotation), High-Tech, and Minimalism.
Contemporary trends: sustainable and biophilic design, adaptive reuse, Scandinavian and Japandi restraint, maximalism, and smart-home integration; heritage conservation principles of minimum intervention and reversibility.
Design Process and Project Work
Brief analysis: establish client needs, budget, programme, constraints, regulatory requirements, and a written statement of requirements agreed with the client before design starts.
Programme/schedule of accommodation: list every space with area, occupancy, adjacency requirements and service needs; test total area against the available floor area.
Concept development: derive a concept from site, brief, culture or material, then translate it into spatial, colour, material and lighting decisions - the concept must be traceable in the final scheme.
Mood board: communicates atmosphere and direction using images, colour chips and texture references, usually 1–2 boards; it is conceptual, not a specification.
Sample board: presents actual physical samples of specified finishes with labels (product name, code, supplier, location of use); arranged in proportion to how they will appear in the scheme.
Specification: written schedule per element - finish, product reference, manufacturer, colour code, location, quantity, and performance requirement; it must be coordinated with drawings and schedules.
Presentation set: concept statement, plans and RCP, elevations, perspectives, mood and sample boards, schedule of finishes, furniture schedule and lighting schedule, plus cost outline.
Project stages follow a typical sequence: briefing → survey → concept → scheme design → detail design/specification → tender → construction/installation → handover and snagging.
Design Process and Project Work (continued)
Snagging and handover: prepare a defects list against the specification, verify installed finishes match approved samples, and hand over maintenance information and warranties.
Sustainability in specification: prefer materials with recycled content, low VOC emissions, FSC-certified timber, local sourcing and end-of-life recyclability; check indoor air quality standards.
Budget control: prepare an elemental cost estimate at concept stage, update at scheme design, and track variations; the finishes and furniture package is a common overrun area.
Accessibility: apply universal design principles - step-free access, 1,500 mm turning circles, lever handles, contrasting nosing, and accessible sanitary provision - from the concept stage, not as an afterthought.
Design Fundamentals: Composition Checks
Check unity by removing one element at a time: if the composition still reads coherently, the removed element was redundant; if it collapses, the element was structural to the scheme.
Rhythm types to specify: regular repetition (even spacing), progression (increasing size or spacing), alternation (A-B-A-B), and radiation (elements from a centre).
Contrast tools: light/dark, rough/smooth, large/small, warm/cool, solid/void. Use contrast to create emphasis; use similarity to create unity.
Human scale reference: eye level 1,500–1,600 mm standing; door height 2,100 mm; these set the perceived scale of every vertical element.
Space Planning: Circulation and Ergonomics Checks
Door swing zones must be kept clear of furniture; a 900 mm door needs roughly a 900 mm quarter-circle of clear floor.
Seating groups: sofa-to-coffee-table 400–450 mm; coffee table to opposite seating 400–450 mm; conversation distance under 2,500 mm to keep voices comfortable.
Wardrobe access: 600 mm depth for hanging clothes, 900–1,000 mm clear in front; hanging rail height 1,700–1,800 mm for long garments.
Workstation: desk depth 600–800 mm, monitor 500–700 mm from eyes, chair with 400–500 mm seat depth and adjustable height 400–520 mm.
Colour Theory: Practical Rules
Choose the dominant colour from fixed elements (floor, stone, joinery) first; then select secondary and accent colours to harmonise with it.
Use a colour's undertone consistently: mixing warm and cool greys in one scheme usually reads as a mismatch unless deliberately contrasted.
Small rooms: light values on large surfaces, accent colour on one feature wall or in textiles; avoid strong dark colour on all four walls unless the room is well lit.
Colour fastness and light: south-facing rooms with strong daylight fade textiles; specify lightfastness grade 5–6 for curtains and upholstery in bright rooms.
Materials and Finishes: Selection Rules
Wet areas: use impervious, slip-resistant floor finishes (R10–R11), sealed grout, and waterproof tanking behind tiles in showers.
Timber moisture content should be 8–12% for interior use in temperate climates; acclimatise boards on site for 48–72 hours before laying.
Acoustic finishes: porous absorbers (fabric, carpet, acoustic panels) reduce reverberation; mass (dense board, masonry) reduces sound transmission.
Maintenance: specify replaceable modules (carpet tiles, LVT planks) in high-wear commercial areas to reduce lifecycle cost.
Lighting Design: Calculation and Control Rules
Lumen method estimate: number of luminaires = (target lux × area) ÷ (lumens per luminaire × utilisation factor × maintenance factor).
Maintenance factor typically 0.8 for clean interiors, lower for dusty environments; it derates the installed illuminance.
Dimmer compatibility: check lamp-driver compatibility (leading vs trailing edge, DALI, 0–10 V); mismatched dimmers cause flicker and drop-out at low levels.
Emergency lighting: escape route illuminance typically ≥ 1 lx along the centre line; maintain via self-contained or central battery systems.
Technical Drawing: Conventions and Checks
Title block must contain project name, drawing title, drawing number, scale, date, revision and author.
Revision control: cloud and triangle the changed area, add revision number and description to the revision table; never issue an unnumbered drawing.
Furniture layout plan shows every item with a reference matching the furniture schedule (code, description, quantity, supplier).
Reflected ceiling plan is drawn as if viewed from above looking down at the floor - light fittings appear mirrored left-right relative to the floor plan.
Construction and Services: Coordination Rules
Ceiling void must be deep enough for the largest service plus falls and access; coordinate sprinkler, duct and cable tray routes before fixing ceiling height.
Service risers and wet walls should be grouped and shown on the plan; a soil stack cannot be moved without checking the drain run and fall below.
Socket and switch heights should be consistent throughout a project and shown on elevations; kitchen appliance outlets are positioned per the appliance schedule.
Acoustic separation between rooms: seal penetrations and joints; even small gaps reduce a partition's Rw rating substantially.
History and Styles: Identification Rules
Identify a style by its structural signature first (arch form, column order, vault type), then by ornament and colour palette.
Arts and Crafts: honest materials, visible joinery, handcraft, muted natural palette. Art Nouveau: whiplash curve, organic line, ironwork. Art Deco: geometric zigzag, stepped form, lacquer and chrome.
Bauhaus furniture signatures: tubular steel cantilever chairs (Breuer), geometric primary-colour schemes, functional simplicity.
Cyprus heritage: recognise Byzantine domed churches, Lusignan Gothic abbeys, Venetian fortifications, Ottoman-era additions, and British colonial civic buildings.
Design Process: Deliverable Checklist
Concept stage deliverables: brief summary, concept statement, mood board, sketch plans and a preliminary budget.
Scheme design deliverables: furniture layout plan, RCP, key elevations, sample board, finish schedule and revised cost plan.
Detail stage deliverables: construction details at 1:5 and 1:10, full specification, schedules, and tender/construction drawings.
Post-completion: snag list, operation and maintenance information, warranties, and as-built drawings.