Pancyprian TS Interior Design III Θ.Κ. study materials
Pancyprian TS Interior Design III Θ.Κ. study resources

Pancyprian TS Interior Design III Θ.Κ.: Design Process and Project Work

Pancyprian TS Interior Design III Θ.Κ. · Work through your exam, one topic at a time.

All guide sections

Design Process and Project Work

What this domain tests

The design process domain tests the working method from brief to presentation, and whether you can document each stage: analysis, concept, development, specification and costing. Marks go to traceable reasoning, not to pretty boards.

Stages

  1. Brief: client profile, function, number of users, budget, programme, constraints (lease, listed building, structure), priorities ranked in order.
  2. Survey: measured drawings of the existing, services, levels, orientation and daylight.
  3. Analysis: adjacency matrix → bubble diagram → zoning → block plan → space plan.
  4. Concept: a written statement of three to five words plus one governing visual idea, tested against the brief.
  5. Development: mood board, sample board, sketch schemes, then resolved plans, elevations and sections.
  6. Specification: finish schedule and FF&E schedule with quantities, supplier, code and cost.
  7. Presentation: concept statement, mood board, consistently scaled plans, visuals, physical samples, budget summary.

Distinctions the examiner looks for

  • Mood board: images communicating atmosphere and direction; no costs, no exact product references.
  • Sample board: real materials, each labelled with material, colour code, finish, supplier and where it is used in the scheme.
  • Specification line: description + standard + manufacturer + reference + finish + quantity.

Worked example

A 30 m² hotel double room refurbishment with a budget of €18,000, that is €600/m². The concept is stated as "calm, coastal, tactile". Headboard fabric: wool-rich, 40,000 Martindale, 1.40 m wide, €45/m. The headboard wall is 3.60 m wide × 1.20 m high = 4.32 m²; at 1.40 m fabric width this needs two drops of 1.20 m, cut at 1.25 m to allow for pattern repeat and hem, so 2.50 m of fabric = €112.50, plus 10% wastage ≈ €124. The same reference goes into the FF&E schedule with quantity 2.5 m, so the contractor can purchase exactly what was specified. Reasoning is shown line by line, which is what earns the marks.

Traps that cost marks

  • Presenting a page of photographs and calling it a sample board.
  • Samples without labels, codes or a stated location in the scheme.
  • No quantities or take-off, so the scheme cannot be costed.
  • A concept statement that never reappears in the final scheme - coherence marks are lost.
  • Presentation plans with no scale, north arrow or room names.
  • Leaving the budget check until after the scheme is drawn.