DC Land Surveyor Exam study materials
DC Land Surveyor Exam study resources

DC Land Surveyor Exam cheat sheet

DC Land Surveyor Exam · Keep the key ideas within reach.

Quick reference

Boundary Surveys and Legal Principles

  • Priority of evidence in boundary retracement: natural monuments, artificial monuments, courses and distances, then area or quantity; written calls generally outrank measurements they contradict.

  • Ambiguity in a deed is construed against the grantor (contra proferentem); a call to a natural monument that can be located controls over a conflicting distance call.

  • Adverse possession generally requires actual, open and notorious, exclusive, continuous, and hostile possession for the statutory period; color of title and payment of taxes can shorten or extend the period depending on state statute.

  • Riparian boundaries: boundary of a non-navigable stream generally follows the thread (middle) of the channel; on navigable waters the state holds title to the ordinary high water mark, subject to state law.

  • Accretion (gradual, imperceptible deposit) adds to the riparian owner; avulsion (sudden, perceptible change of channel) does not move the boundary.

  • A prescriptive easement requires use that is open, notorious, adverse, continuous, and for the statutory period, but unlike adverse possession it need not be exclusive.

  • Parol evidence is generally inadmissible to contradict an unambiguous deed, but may be admitted to resolve latent ambiguities, explain monuments, or show fraud, mistake, or boundary agreement.

  • Record vs. occupation: junior-senior rights and recording acts (race, notice, race-notice) determine which of competing conveyances prevails; a surveyor must reconcile record title with possession evidence.

Quick reference

Geodesy and Coordinate Systems

  • Ellipsoid parameters: GRS80 has a = 6,378,137.0 m and 1/f = 298.257222101; WGS84 has a = 6,378,137.0 m and 1/f = 298.257223563. NAD83 and WGS84 differ by roughly 1–2 m in CONUS.

  • Geodetic vs. geocentric latitude: geodetic latitude is the angle between the ellipsoid normal and the equatorial plane; geocentric latitude uses a line to the ellipsoid center; the difference is up to about 0.19°.

  • State Plane Coordinates: each zone uses a map projection (Lambert Conformal Conic or Transverse Mercator) with a scale factor; grid distance = ground distance × combined factor (ellipsoid factor × projection factor).

  • Elevation factor = R/(R+h), where R is the mean Earth radius (~6,371,000 m) and h is the ellipsoid height; projection scale factor for Lambert varies with longitude from the central meridian.

  • Geoid vs. ellipsoid: orthometric (mean sea level) heights differ from ellipsoid heights by the geoid undulation N; h (ellipsoid) = H (orthometric) + N.

  • Datum transformation: NAD27 to NAD83 shifts coordinates by roughly 10–100 m depending on location; use published NGS transformation tools (NADCON) rather than a simple translation.

  • UTM zones are 6° wide, numbered 1–60 eastward from 180° W; central meridian scale factor is 0.9996; coordinates are in meters with a false easting of 500,000 m.

  • Convergence angle: the difference between grid north and true north; it is zero on the central meridian and increases with longitude distance from it and with latitude.

Quick reference

Control Surveys and Adjustments

  • Random vs. systematic error: random errors follow a normal distribution and are reduced by redundancy; systematic errors (refraction, instrument calibration) bias results and must be eliminated by procedure or correction.

  • Standard deviation of the mean = σ/√n; standard error of a single observation is estimated from residuals via σ = √(Σv²/(n−1)).

  • Least squares adjustment minimizes the sum of squared weighted residuals; the normal equations are N = AᵀWA and x = (AᵀWA)⁻¹AᵀWL.

  • Weights are inversely proportional to variance: w = 1/σ²; relative weights may be used because the adjustment is scale-invariant.

  • Error ellipse: semi-major axis a and semi-minor axis b derived from the covariance matrix; the 95% confidence ellipse uses a scale factor of 2.4477 for 2D (chi-square, 2 DOF).

  • Loop closure: for a closed traverse, angular misclosure is distributed by rule (equal or by angle weight); linear misclosure is checked against the allowed precision, e.g., 1:10,000 for ordinary traverses.

  • Compass (Bowditch) rule distributes latitude and longitude errors proportionally to line length; transit rule distributes proportionally to the absolute latitudes and departures.

  • Blunder detection: standardized residuals exceeding about 3σ, or a reference-factor test (a posteriori σ vs. a priori σ), indicate an outlier or misweighted observation.

Quick reference

Measurement Technology and Data Collection

  • Total station: horizontal angle from two face readings; zenith angle converted to vertical angle; slope distance reduced to horizontal with HD = SD·sin(zenith) and vertical difference VD = SD·cos(zenith).

  • EDM accuracy is typically stated as ±(a mm + b ppm × D); atmospheric correction uses temperature and pressure; a 10 °C error causes roughly 1 ppm error in distance.

  • GNSS RTK: typical horizontal accuracy 10 mm + 1 ppm, vertical 20 mm + 1 ppm; fix vs. float solution depends on integer ambiguity resolution; PDOP above about 6 degrades accuracy.

  • GNSS is subject to multipath, ionospheric and tropospheric delay; base-rover baseline length should generally be under 10–20 km for RTK accuracy.

  • Digital levels use bar-coded staffs and image processing to achieve ~0.3 mm/km double-run accuracy; level loops must be closed and adjusted.

  • Terrestrial laser scanning: point cloud registration uses targets or cloud-to-cloud matching; accuracy is typically 2–6 mm at 10–50 m; scan density depends on angular resolution and range.

  • UAV photogrammetry requires ground control points and checkpoints; GSD (ground sample distance) is calculated as pixel size × flying height / focal length.

  • Robotic total station and automatic target recognition (ATR) allow one-person operation; prism constants (e.g., 0 mm vs. −30 mm) must match the prism used or distances are biased.

Quick reference

Cadastral and Subdivision Practice

  • A subdivision plat must typically show bearings and distances of all lot lines, curve data (R, Δ, L, LC, chord bearing), lot areas, monument locations, and dedication language.

  • Metes and bounds description begins at a point of beginning (POB) and returns to close; it should reference monuments, adjoiners, and the basis of bearings.

  • Curve formulas: L = R·Δ(radians); T = R·tan(Δ/2); LC = 2R·sin(Δ/2); M = R(1 − cos(Δ/2)); E = R(sec(Δ/2) − 1).

  • Area by coordinate method (shoelace): 2A = Σ(Xᵢ·Yᵢ₊₁ − Xᵢ₊₁·Yᵢ); area by DMD: 2A = Σ(DMD × departure).

  • Plat approval process generally involves preliminary plat, planning commission review, public hearing, final plat, and recording; local ordinances govern street widths, setbacks, and easements.

  • Easements must be described by width and centerline or by metes and bounds; a utility easement does not convey fee title but burdens the servient estate.

  • Lot area and frontage requirements come from zoning; nonconforming lots may be buildable under grandfathering provisions, but surveyors should not certify compliance without checking ordinances.

  • Monumentation requirements: set monuments at all corners and at curve PCs, PTs, and points of tangency; record the monument type, cap, and coordinates in the plat or description.

Quick reference

Land Development and Construction Surveying

  • Construction stakeout: horizontal and vertical control are established, then offset stakes are set outside the work area; grade is referenced to a benchmark or laser plane.

  • Cut and fill: cut = existing elevation − design elevation (positive = cut); volume by average end area = L × (A₁ + A₂)/2, or by prismoidal formula V = L/6 × (A₁ + 4Aₘ + A₂).

  • Mass diagram: cumulative earthwork volume plotted along the alignment; the balance point indicates equal cut and fill; the ordinate difference between two stations is the volume between them.

  • Slope staking uses catch points where the design slope intersects existing ground; the horizontal distance to catch = (grade difference) / (slope difference).

  • Horizontal and vertical curves: vertical curve elevation y = y_PVC + g₁x + ((g₂ − g₁)/2L)x²; K = L/A where A is the algebraic grade change in percent.

  • As-built surveys verify that constructed improvements match design; deviations outside tolerance (e.g., ±0.05 ft for structures) require documentation and sometimes redesign.

  • Machine control and GPS grading use a digital terrain model; the design surface must be verified against the site datum before use.

  • Stormwater and utility layout: invert elevations, pipe slopes (typically 0.5%–2% for gravity sewers), and cover depths must be checked against design and local standards.

Quick reference

Professional Practice, Ethics, and Business

  • Surveyor licensure: NCEES Fundamentals of Surveying (FS) exam, then the Principles and Practice of Surveying (PS) exam; state boards set experience requirements and continuing education hours.

  • A professional seal and signature certify that work was performed by or under the direct supervision of the licensee; sealing work outside one's competence is an ethics violation.

  • Conflict of interest: a surveyor must disclose any financial interest in the property or transaction and must not accept compensation from more than one party for the same service without disclosure.

  • Boundary survey standards: ALTA/NSPS Land Title Survey standards define minimum requirements, including title commitment review, monumentation, and optional Table A items.

  • Contracts should define scope, deliverables, standard of care, limitations of liability, and fee; a surveyor is held to the standard of a reasonably competent practitioner, not to a guarantee of perfection.

  • Records retention and confidentiality: client information and survey records should be retained per state statute and released only with authorization or legal process.

  • Lien rights: many states allow a surveyor's lien for unpaid services; deadlines for filing and notice vary by jurisdiction.

  • Ethical advertising and expert testimony: a surveyor serving as an expert witness must base opinions on evidence and disclose the basis; advocacy must not distort technical facts.

Quick reference

Mapping, GIS, and Spatial Data

  • Map scale: representative fraction (RF) 1:24,000 means 1 unit on the map equals 24,000 units on the ground; large scale = small denominator (more detail).

  • Horizontal accuracy standards (ASP RS/NMAS): at map scale 1:24,000, the 90% horizontal accuracy is typically 1/30 inch × scale, about 12.2 m (40 ft).

  • Raster vs. vector: rasters store values in a grid of cells; vectors store points, lines, and polygons; topology defines adjacency, connectivity, and containment.

  • Coordinate reference systems in GIS: a projected CRS (e.g., State Plane, UTM) vs. a geographic CRS (lat/long on a datum); mismatched datums cause feature shifts of tens of meters.

  • LiDAR point clouds are classified (ground, vegetation, buildings) to produce DEM/DTM; bare-earth DEMs are used for contours and hydrology.

  • Contours: index contours are typically every fifth contour and labeled; contour interval is the vertical distance between adjacent contours; hachures indicate depressions.

  • Metadata should document source, datum, accuracy, and date; FGDC/ISO 19115 standards define metadata content.

  • Spatial analysis: buffer, overlay (union, intersect), and spatial join; TIN and DEM interpolation methods include IDW, kriging, and natural neighbor.

Quick reference

Hydrographic and Topographic Surveying

  • Hydrographic positioning: soundings are referenced to a chart datum (often MLLW in the U.S.); depths are reduced by tide or water-level measurements during the survey.

  • Multibeam and single-beam echosounders measure depth using sound speed in water (~1,500 m/s); sound velocity profiles correct for temperature, salinity, and pressure.

  • Side-scan sonar images the seafloor for object detection; it does not give accurate depths without additional sensors.

  • Tidal datum: mean lower low water (MLLW) is the average of the lower of the two daily low waters; mean sea level (MSL) is the average of hourly heights over a 19-year epoch.

  • Topographic mapping: total station or GNSS RTK collects breaklines and spot elevations; contours are interpolated from a TIN or DEM.

  • Vertical datum: NAVD88 uses a fixed benchmark (Father Point, Quebec) and orthometric heights; NGVD29 is an older datum differing by up to about 1 m in places.

  • Hydrographic survey accuracy standards (IHO S-44) define orders: Special Order (a = 0.25 m, b = 0.0075), Order 1a (a = 0.5 m, b = 0.013), Order 1b, and Order 2.

  • Volume computations in dredging use pre- and post-dredge surfaces; payment is typically by in-situ or hopper volume, and the surveyor must document the method and datum.

Quick reference

Boundary Surveys and Legal Principles (Supplemental)

  • A deed description that is ambiguous may be reformed by a court upon clear and convincing evidence of mutual mistake; a surveyor's opinion is evidence, not a judicial determination.

  • Unwritten rights: prescriptive easement, adverse possession, boundary by agreement, boundary by acquiescence, and estoppel can establish or move a boundary without a deed.

  • A boundary by agreement requires a dispute or uncertainty, an agreement, and performance or possession consistent with the agreed line.

  • Junior-senior rights: when a grantor conveys a portion of land and later conveys the remainder, the earlier (senior) conveyance generally prevails over the later (junior) one to the extent of any overlap.

  • Water boundary: meander lines are not boundary lines; they approximate the water's edge for area computation and do not control the boundary.

  • Monument evidence: a called-for monument that is found in place and undisturbed generally controls over a distance call; a monument set by the surveyor does not control over an original monument.

  • The surveyor's report should state the basis of bearings, datum, monument found/set, and any discrepancies between record and occupation.

  • Chain of title: a title search reveals recorded instruments affecting the parcel; unrecorded interests and prescriptive rights may not appear in the record.

Quick reference

Geodesy and Coordinate Systems (Supplemental)

  • Geodetic azimuth vs. grid azimuth: grid azimuth = geodetic azimuth − convergence (with sign convention depending on hemisphere and zone).

  • State Plane zones: some states have multiple zones (e.g., California has 6, Texas has 5); a project crossing a zone boundary requires transformation between zones.

  • Scale factor for Transverse Mercator: k = k₀(1 + x²/(2R²)) approximately, where x is the distance from the central meridian; k₀ = 0.9996 for UTM.

  • Ellipsoid height h can be obtained from GNSS; orthometric height H = h − N, where N is the geoid undulation from a model such as GEOID18.

  • Latitude/longitude to State Plane: use published projection equations or NGS software; do not interpolate between zones.

  • Datum realization: NAD83(2011) differs from NAD83(NA2011) and from WGS84 by up to about 1–2 m; always state the epoch and realization.

  • Great-circle distance: d = R·σ, where σ is the central angle from the spherical law of cosines or haversine formula; use for long baselines.

  • Azimuth from coordinates: α = atan2(ΔE, ΔN); quadrant must be resolved to a full 0°–360° bearing.

Quick reference

Control Surveys and Adjustments (Supplemental)

  • Traverse computations: latitude = distance × cos(azimuth); departure = distance × sin(azimuth); Σlatitude and Σdeparture should close to zero for a closed loop.

  • Angular misclosure for a closed polygon = sum of interior angles − (n − 2)×180°; distribute equally or by weighted rule.

  • Precision ratio = total linear misclosure / total traverse length; express as 1:N.

  • Error propagation: for a function f(x,y), σf² = (∂f/∂x)²σx² + (∂f/∂y)²σy² + 2(∂f/∂x)(∂f/∂y)σxy.

  • Chi-square test: computed χ² = vᵀWv / (n − u) compared to a table value at a chosen confidence level; a large value suggests a blunder or wrong weights.

  • Level loop adjustment: distribute misclosure proportionally to the number of setups or to the distance; check against the allowed misclosure (e.g., 0.05 ft√M for ordinary leveling).

  • Resection and intersection: resection determines an occupied point from known points; intersection determines an unknown point from two known stations.

  • Network design: redundancy (degrees of freedom) improves blunder detection; a minimally constrained adjustment fixes one station and one azimuth to define the datum.

Quick reference

Measurement Technology and Data Collection (Supplemental)

  • Total station face-left and face-right readings: the mean of the two face readings eliminates collimation error and vertical index error.

  • Prism constant: a 0 mm prism and a −30 mm prism differ by 30 mm; using the wrong constant biases every distance by that amount.

  • Atmospheric correction: EDM distances are corrected using temperature, pressure, and humidity; the correction is typically ppm-level and can exceed 100 ppm in extreme conditions.

  • GNSS observation: static surveys require longer occupation for long baselines; rapid static uses short occupations (5–20 min) for baselines under about 10–15 km.

  • Coordinate transformation: a Helmert 7-parameter transformation (3 translations, 3 rotations, scale) converts between datums; a 4-parameter (2D) transformation is used for local grid shifts.

  • Digital terrain model: breaklines, spot shots, and mass points define the surface; check that the TIN honors breaklines and does not create spurious triangles.

  • Field data collection: coding and feature codes automate linework; check that codes match the feature table and that attributes are complete.

  • Quality control: repeat measurements, independent checks (e.g., a second occupation or a different instrument), and comparison to known control points.

Quick reference

Cadastral and Subdivision Practice (Supplemental)

  • Lot line adjustment: a minor reconfiguration of two or more lots that does not create additional lots; typically requires local approval and a recorded deed or plat.

  • Subdivision map act (California example) or state plat act: requirements for tentative map, final map, and parcel map vary by state and local ordinance.

  • Dedication: an offer of land for public use (streets, parks) that is accepted by the public entity; acceptance may be by resolution or by use.

  • Easement by necessity: arises when a parcel is landlocked and access is required; it terminates when the necessity ends.

  • Legal description by aliquot parts: e.g., the SW¼ of the NE¼ of Section 14, T3N, R2E; area = 40 acres (¼ × ¼ × 640).

  • Section subdivision: a section is 1 mile square (640 acres); quarter sections are 160 acres; quarter-quarter sections are 40 acres.

  • Plat review: check for closure, monumentation, easements, setbacks, and compliance with zoning; a plat should not be recorded until all signatures and approvals are obtained.

  • Corner monumentation: original government corners (GLO) are protected by law; destruction or removal may be a criminal offense in many states.

Quick reference

Land Development and Construction Surveying (Supplemental)

  • Grade: percent grade = (vertical difference / horizontal distance) × 100; a 2% grade over 100 ft rises 2 ft.

  • Cut/fill staking: mark the cut or fill at the stake; the grade rod reading minus the design grade gives the cut or fill.

  • Horizontal curve layout: deflection angle for a chord = (chord length / (2R)) in radians; set stakes by deflection from the tangent.

  • Vertical curve: the high or low point occurs where the grade is zero; x = −g₁L/(g₂ − g₁).

  • Earthwork: the prismoidal formula is more accurate than average end area for tapering volumes; use it for large grade changes.

  • Construction tolerances: foundations, utilities, and pavement each have specified tolerances; document as-built deviations.

  • Site layout: establish horizontal and vertical control, set benchmarks, and protect them from construction activity.

  • Machine guidance: verify the design model and the local coordinate system; check a known point before grading.

Quick reference

Professional Practice, Ethics, and Business (Supplemental)

  • Standard of care: the degree of care and skill ordinarily exercised by members of the profession under similar circumstances; it is not a warranty of perfection.

  • Scope of services: a written contract should define the survey type (boundary, ALTA, topographic), deliverables, and exclusions.

  • Conflict of interest: disclose any relationship with a party that could impair objectivity; avoid contingent fees for boundary opinions.

  • Confidentiality: client information should not be disclosed without consent except as required by law or to defend against a claim.

  • Continuing education: most states require 15–30 hours per renewal cycle, with a portion in ethics or surveying law.

  • Seal and signature: only a licensee may seal work; sealing work not performed by the licensee or under their supervision is a violation.

  • Expert witness: testimony must be based on facts and accepted methods; a surveyor may testify about boundary evidence but the court decides the boundary.

  • Records: retain field notes, computations, and correspondence for the period required by state law; records may be discoverable in litigation.

Quick reference

Mapping, GIS, and Spatial Data (Supplemental)

  • Map projection: conformal projections preserve angles (Lambert, Transverse Mercator); equal-area projections preserve area (Albers); equidistant projections preserve distance from a point or along a line.

  • Scale: a 1:1,000 map is larger scale than a 1:24,000 map; the larger-scale map shows more detail.

  • Contour interval: choose based on map scale and terrain; a smaller interval shows more detail but can clutter the map.

  • GIS data quality: positional accuracy, attribute accuracy, completeness, logical consistency, and lineage are the five elements of spatial data quality.

  • Raster resolution: cell size determines the level of detail; a 1 m DEM cannot resolve features smaller than about 2 m.

  • Coordinate transformation in GIS: use the correct datum and projection; reprojecting from NAD27 to NAD83 without a datum transformation shifts features by tens of meters.

  • LiDAR: returns are classified; a bare-earth DEM is created from ground returns; check for vegetation and building artifacts.

  • Metadata: document source, date, accuracy, and processing steps; metadata supports data sharing and reproducibility.

Quick reference

Hydrographic and Topographic Surveying (Supplemental)

  • Tide reduction: observed depths are reduced to chart datum by subtracting the predicted or observed tide height at the time of the sounding.

  • Sound speed: sound travels faster in warmer, saltier, and deeper water; a sound velocity probe measures the profile.

  • Multibeam coverage: swath width depends on depth and beam angle; overlap between adjacent lines ensures complete coverage.

  • IHO S-44 orders: Special Order, Order 1a, Order 1b, and Order 2; each specifies total vertical uncertainty (TVU) and horizontal uncertainty.

  • Topographic survey: collect breaklines at grade changes, edges of pavement, and water features; spot elevations supplement the breaklines.

  • Vertical datum: NAVD88 is the current U.S. vertical datum; local tidal datums (MLLW, MHW) are used for hydrographic charts.

  • Volume computation: use the same datum and method for pre- and post-dredge surveys; document the surface models and the method.

  • Hydrographic positioning: use RTK or DGPS for horizontal position; check the position against known control points.

Quick reference

Boundary Surveys and Legal Principles (Advanced)

  • Rules of construction: a deed is construed as a whole; specific calls control general calls; monuments control distances; and a call to an adjoiner may control over a distance.

  • A call for a natural monument (river, tree, rock) controls over a call for an artificial monument if the natural monument is more certain and permanent.

  • A call for an artificial monument (iron pin, stone) controls over courses and distances if the monument is identified and undisturbed.

  • Courses and distances control over area; area is the least reliable call and is used only as a check.

  • Ambiguity in a deed may be resolved by the parties' practical construction (their conduct) and by the surrounding circumstances.

  • Boundary by acquiescence: a long-standing line recognized by the parties may be enforced even without a dispute, depending on state law.

  • Prescriptive easement: use must be adverse, open, notorious, continuous, and for the statutory period; exclusivity is not required.

  • Adverse possession: possession must be hostile, actual, open, notorious, exclusive, and continuous; some states require payment of taxes or color of title.

Quick reference

Geodesy and Coordinate Systems (Advanced)

  • Geoid model: GEOID18 provides geoid undulations in the U.S.; the model is referenced to NAD83(2011) and NAVD88.

  • Ellipsoid height from GNSS: h = H + N; if N is unknown, use a geoid model or a local benchmark.

  • State Plane coordinates: the combined factor = elevation factor × scale factor; grid distance = ground distance × combined factor.

  • Scale factor: for Lambert, the scale factor is 1 at the standard parallels and less than 1 between them; for Transverse Mercator, the scale factor is k₀ at the central meridian.

  • Convergence: the angle between grid north and true north; it is positive east of the central meridian in the northern hemisphere.

  • Datum transformation: use NGS tools (NADCON, HTDP) for accurate transformations; a simple translation is not sufficient for precise work.

  • UTM: the central meridian scale factor is 0.9996; the false easting is 500,000 m; the false northing is 0 m in the northern hemisphere and 10,000,000 m in the southern hemisphere.

  • Geodetic coordinates: latitude, longitude, and ellipsoid height; convert to ECEF coordinates using the ellipsoid parameters.

Quick reference

Control Surveys and Adjustments (Advanced)

  • Least squares: the observation equations are A x = L + v; the normal equations are N x = AᵀWL; the solution is x = N⁻¹AᵀWL.

  • Covariance matrix: Σx = σ₀² N⁻¹; the standard deviations of the unknowns are the square roots of the diagonal elements.

  • A posteriori variance factor: σ₀² = vᵀWv / (n − u); it should be close to 1 if the weights are correct.

  • Error ellipse: the semi-major and semi-minor axes are the square roots of the eigenvalues of the covariance matrix; the orientation is given by the eigenvectors.

  • Confidence region: the 95% confidence ellipse uses a scale factor of 2.4477 for 2D; the 95% confidence interval for 1D uses 1.96.

  • Blunder detection: use the standardized residual or the data snooping method; a large residual indicates a blunder.

  • Traverse adjustment: the compass rule distributes errors proportionally to distance; the transit rule distributes proportionally to latitude and departure.

  • Leveling: the misclosure is distributed proportionally to the number of setups or to the distance; check against the allowed misclosure.

Quick reference

Measurement Technology and Data Collection (Advanced)

  • Total station: the horizontal angle is the mean of face-left and face-right readings; the vertical angle is the mean of the zenith angles.

  • EDM: the distance is corrected for atmospheric conditions, prism constant, and instrument offset; the correction is applied in ppm.

  • GNSS: the accuracy depends on the baseline length, the number of satellites, and the PDOP; a PDOP above 6 is generally unacceptable for precise work.

  • RTK: the rover receives corrections from a base station or a network; the fix solution requires integer ambiguity resolution.

  • Static GNSS: long occupations (30 min to hours) are required for long baselines; the accuracy is typically 5 mm + 1 ppm.

  • Digital level: the bar-coded staff is read automatically; the accuracy is typically 0.3 mm/km double run.

  • Laser scanning: the point cloud is registered using targets or cloud-to-cloud matching; the accuracy is typically 2–6 mm at 10–50 m.

  • UAV: the GSD is calculated as pixel size × flying height / focal length; ground control points are required for accurate mapping.

Quick reference

Cadastral and Subdivision Practice (Advanced)

  • Metes and bounds: the description must close; the error of closure should be within an acceptable tolerance (e.g., 1:10,000).

  • Curve data: the plat should show R, Δ, L, LC, chord bearing, and the tangent bearing.

  • Area: the area of a lot is computed from the coordinates; the area should match the record area within an acceptable tolerance.

  • Easements: the description should show the width, centerline, and the burdened parcel; the easement should be recorded.

  • Subdivision: the plat should show all lots, streets, easements, and monuments; the plat must be approved and recorded.

  • Zoning: the lot must meet the minimum area, width, and setback requirements; a nonconforming lot may be buildable under grandfathering.

  • Monumentation: set monuments at all corners and at curve points; record the monument type and cap.

  • Legal description: the description should be sufficient to locate the parcel without reference to other documents; it should include the basis of bearings and the datum.

Quick reference

Land Development and Construction Surveying (Advanced)

  • Cut and fill: cut = existing − design; fill = design − existing; the volume is computed by average end area or prismoidal formula.

  • Mass diagram: the ordinate is the cumulative volume; the balance point is where the cumulative volume is zero; the haul distance is the area under the mass diagram.

  • Vertical curve: the elevation at any point is y = y_PVC + g₁x + ((g₂ − g₁)/2L)x²; the high or low point is where the grade is zero.

  • Horizontal curve: the deflection angle for a chord is Δ/2; the chord length is 2R sin(Δ/2).

  • Slope staking: the catch point is where the design slope intersects the existing ground; the horizontal distance is (grade difference) / (slope difference).

  • Construction layout: establish control, set benchmarks, and protect them; check the design against the site datum.

  • As-built: verify the constructed improvements against the design; document deviations and their resolution.

  • Machine control: verify the design model and the local coordinate system; check a known point before grading.

Quick reference

Professional Practice, Ethics, and Business (Advanced)

  • Standard of care: the degree of care and skill ordinarily exercised by members of the profession; it is not a guarantee of perfection.

  • Contract: the scope, deliverables, schedule, fee, and limitations of liability should be in writing.

  • Conflict of interest: disclose any financial interest in the property or transaction; avoid contingent fees for boundary opinions.

  • Confidentiality: client information should not be disclosed without consent except as required by law.

  • Continuing education: most states require 15–30 hours per renewal cycle, with a portion in ethics or surveying law.

  • Seal and signature: only a licensee may seal work; sealing work not performed by the licensee or under their supervision is a violation.

  • Expert witness: testimony must be based on facts and accepted methods; the court decides the boundary, not the surveyor.

  • Records: retain field notes, computations, and correspondence for the period required by state law.

Quick reference

Mapping, GIS, and Spatial Data (Advanced)

  • Map projection: conformal projections preserve angles; equal-area projections preserve area; equidistant projections preserve distance.

  • Scale: a 1:1,000 map is larger scale than a 1:24,000 map; the larger-scale map shows more detail.

  • Contour interval: choose based on map scale and terrain; a smaller interval shows more detail but can clutter the map.

  • GIS data quality: positional accuracy, attribute accuracy, completeness, logical consistency, and lineage.

  • Raster resolution: cell size determines the level of detail; a 1 m DEM cannot resolve features smaller than about 2 m.

  • Coordinate transformation: use the correct datum and projection; reprojecting from NAD27 to NAD83 without a datum transformation shifts features by tens of meters.

  • LiDAR: returns are classified; a bare-earth DEM is created from ground returns; check for vegetation and building artifacts.

  • Metadata: document source, date, accuracy, and processing steps; metadata supports data sharing and reproducibility.

Quick reference

Hydrographic and Topographic Surveying (Advanced)

  • Tide reduction: observed depths are reduced to chart datum by subtracting the tide height at the time of the sounding.

  • Sound speed: sound travels faster in warmer, saltier, and deeper water; a sound velocity probe measures the profile.

  • Multibeam coverage: swath width depends on depth and beam angle; overlap between adjacent lines ensures complete coverage.

  • IHO S-44 orders: Special Order, Order 1a, Order 1b, and Order 2; each specifies total vertical uncertainty and horizontal uncertainty.

  • Topographic survey: collect breaklines at grade changes, edges of pavement, and water features; spot elevations supplement the breaklines.

  • Vertical datum: NAVD88 is the current U.S. vertical datum; local tidal datums (MLLW, MHW) are used for hydrographic charts.

  • Volume computation: use the same datum and method for pre- and post-dredge surveys; document the surface models and the method.

  • Hydrographic positioning: use RTK or DGPS for horizontal position; check the position against known control points.

Quick reference

Boundary Surveys and Legal Principles (Case Law)

  • Monument controls over distance: a found original monument that is undisturbed generally controls over a distance call in the deed.

  • Natural monument controls over artificial monument: a river or tree call may control over an iron pin if the natural monument is more certain.

  • Courses and distances control over area: area is the least reliable call and is used only as a check.

  • Ambiguity is construed against the grantor: the grantor is responsible for the language and any ambiguity is resolved in favor of the grantee.

  • Practical construction: the parties' conduct over time may be used to interpret an ambiguous deed.

  • Boundary by acquiescence: a long-standing line recognized by the parties may be enforced even without a dispute, depending on state law.

  • Prescriptive easement: use must be adverse, open, notorious, continuous, and for the statutory period; exclusivity is not required.

  • Adverse possession: possession must be hostile, actual, open, notorious, exclusive, and continuous; some states require payment of taxes or color of title.

Quick reference

Geodesy and Coordinate Systems (Case Law)

  • Geoid model: GEOID18 provides geoid undulations in the U.S.; the model is referenced to NAD83(2011) and NAVD88.

  • Ellipsoid height from GNSS: h = H + N; if N is unknown, use a geoid model or a local benchmark.

  • State Plane coordinates: the combined factor = elevation factor × scale factor; grid distance = ground distance × combined factor.

  • Scale factor: for Lambert, the scale factor is 1 at the standard parallels and less than 1 between them; for Transverse Mercator, the scale factor is k₀ at the central meridian.

  • Convergence: the angle between grid north and true north; it is positive east of the central meridian in the northern hemisphere.

  • Datum transformation: use NGS tools (NADCON, HTDP) for accurate transformations; a simple translation is not sufficient for precise work.

  • UTM: the central meridian scale factor is 0.9996; the false easting is 500,000 m; the false northing is 0 m in the northern hemisphere and 10,000,000 m in the southern hemisphere.

  • Geodetic coordinates: latitude, longitude, and ellipsoid height; convert to ECEF coordinates using the ellipsoid parameters.

Quick reference

Control Surveys and Adjustments (Case Law)

  • Least squares: the observation equations are A x = L + v; the normal equations are N x = AᵀWL; the solution is x = N⁻¹AᵀWL.

  • Covariance matrix: Σx = σ₀² N⁻¹; the standard deviations of the unknowns are the square roots of the diagonal elements.

  • A posteriori variance factor: σ₀² = vᵀWv / (n − u); it should be close to 1 if the weights are correct.

  • Error ellipse: the semi-major and semi-minor axes are the square roots of the eigenvalues of the covariance matrix; the orientation is given by the eigenvectors.

  • Confidence region: the 95% confidence ellipse uses a scale factor of 2.4477 for 2D; the 95% confidence interval for 1D uses 1.96.

  • Blunder detection: use the standardized residual or the data snooping method; a large residual indicates a blunder.

  • Traverse adjustment: the compass rule distributes errors proportionally to distance; the transit rule distributes proportionally to latitude and departure.

  • Leveling: the misclosure is distributed proportionally to the number of setups or to the distance; check against the allowed misclosure.