CASM study materials
CASM study resources

CASM key terms

CASM · Get comfortable with the vocabulary.

Agile service management

Applying agile and lean principles to the design, delivery, and improvement of IT services, so that work is organized around customer value, short feedback loops, and continuous adaptation rather than rigid long-cycle plans.

Related: Lean thinking, Value stream, Service lifecycle
Lean thinking

A management approach that maximizes customer value by systematically removing waste, limiting work in progress, and improving flow through small, incremental changes made by the people doing the work.

Related: Waste (muda), Value stream mapping, Kaizen
Waste (muda)

Any activity that consumes resources without creating value for the customer. Common examples in service work include waiting, handoffs, rework, partially done work, and unnecessary approval steps.

Related: Value stream mapping, Lean thinking, Lead time
Value stream

The end-to-end sequence of activities, people, and systems required to move a customer request from initial demand to delivered value, including both value-adding steps and the delays between them.

Related: Value stream mapping, Lead time, Flow efficiency
Value stream mapping

A collaborative technique that visualizes the steps, queues, and handoffs in a value stream, quantifies process time versus wait time, and identifies the largest sources of delay for improvement.

Related: Value stream, Flow efficiency, Waste (muda)
Flow efficiency

The ratio of active work time to total elapsed time for a work item, expressed as a percentage. Low flow efficiency signals that items spend most of their life waiting rather than being worked on.

Related: Lead time, Cycle time, Value stream
Lead time

The total elapsed time from the moment a customer raises a request or a work item enters the system until it is delivered. It measures the customer's actual experience of waiting.

Related: Cycle time, Flow efficiency, Little's Law
Cycle time

The elapsed time between a work item starting active work and being completed, or the average interval between successive items leaving a process. Often used for predictability forecasting.

Related: Lead time, Little's Law, Throughput
Little's Law

A queuing relationship stating that average work in progress equals average throughput multiplied by average lead time. It lets teams predict how limiting WIP or raising throughput changes waiting time.

Related: Work in progress (WIP), Throughput, Lead time
Work in progress (WIP)

The number of work items that have been started but not yet finished. Limiting WIP is a core flow practice because excess started work increases queues, context switching, and delivery delay.

Related: Little's Law, WIP limit, Kanban board
WIP limit

An explicit cap on how many items may occupy a workflow stage at one time. When the cap is reached, the team swarms to finish existing work rather than pulling new work in.

Related: Work in progress (WIP), Pull system, Kanban board
Kanban board

A visual representation of a workflow with columns for stages and cards for work items, showing current state, blockers, and policies so that flow problems become visible to everyone.

Related: WIP limit, Pull system, Cumulative flow diagram
Pull system

A way of scheduling work in which an item is started only when downstream capacity becomes available, rather than being pushed into the process by a plan or a queue of commitments.

Related: WIP limit, Kanban board, Throughput
Throughput

The number of work items completed per unit of time, such as tickets closed per week. It is a core flow metric used with lead time to forecast future delivery without estimating individual items.

Related: Little's Law, Cycle time, Cumulative flow diagram
Cumulative flow diagram

A stacked-area chart showing how many items sit in each workflow stage over time. Widening bands reveal growing queues and bottlenecks, while stable bands indicate predictable flow.

Related: Kanban board, Work in progress (WIP), Throughput
Scrum

An agile framework in which a small cross-functional team delivers increments in fixed-length sprints, using a product backlog, sprint planning, daily inspection, a review, and a retrospective.

Related: Sprint, Product backlog, Definition of Done
Sprint

A fixed timebox, typically one to four weeks, during which a Scrum team builds a usable increment. Scope is protected during the sprint so that goals can be met and learning captured.

Related: Scrum, Definition of Done, Product backlog
Product backlog

An ordered list of everything that might be built to improve the product or service, refined continuously by the product owner so the highest-value items are ready for upcoming work.

Related: User story, Definition of Ready, Scrum
User story

A short, plain-language statement of a need written from the user's perspective, usually with a role, a goal, and a benefit, intended to spark conversation rather than fully specify a solution.

Related: Acceptance criteria, Definition of Ready, Product backlog
Acceptance criteria

The specific, testable conditions a work item must satisfy to be accepted by the customer or product owner. They clarify scope and form the basis for verification and automated tests.

Related: User story, Definition of Done, Definition of Ready
Definition of Done

A shared checklist describing what quality and completeness mean for any increment, such as tested, documented, and deployed. It prevents items from being declared complete prematurely.

Related: Acceptance criteria, Sprint, Technical debt
Definition of Ready

An agreed set of criteria a backlog item should meet before a team pulls it into work, for example clear value, understood dependencies, and testable acceptance criteria.

Related: User story, Product backlog, Acceptance criteria
Minimum viable service

The smallest version of a service that delivers real value to early users, released to validate assumptions and gather feedback before investing in wider scope and scale.

Related: Service design, Feedback loop, Value stream
Service design

The discipline of shaping a service's components, interactions, and touchpoints so that it meets customer outcomes and is deliverable, supportable, and measurable end to end.

Related: Service blueprint, Minimum viable service, Service lifecycle
Service blueprint

A diagram mapping the customer journey against front-stage interactions, back-stage activities, and supporting systems, exposing dependencies and failure points across the whole service.

Related: Service design, Value stream, Customer journey
Customer journey

The sequence of steps and emotions a customer experiences while trying to achieve an outcome with a service, used to identify friction and moments that matter most.

Related: Service blueprint, Service design, Feedback loop
Service lifecycle

The stages a service passes through from concept and design to build, transition, operation, and retirement, each with distinct decisions, risks, and governance needs.

Related: Service design, Release, Configuration item
Release

One or more changes to a service made available to users together. Agile practice favors small, frequent releases so that risk and feedback are contained within each increment.

Related: Deployment, Continuous delivery, Service lifecycle
Deployment

The technical act of installing and activating a version of software or configuration in an environment. Deployment can be separated from release so that features are activated independently.

Related: Release, Continuous integration, Feature flag
Feature flag

A runtime switch that enables or disables functionality without redeploying code, allowing dark launches, gradual rollouts, and rapid rollback if a change misbehaves.

Related: Deployment, Canary release, Release
Canary release

A deployment pattern in which a change is exposed to a small subset of users or traffic first, with monitoring, before being rolled out to the wider population.

Related: Feature flag, Deployment, Service level indicator
Continuous integration

A practice in which developers merge small code changes frequently and each merge triggers automated build and test, catching integration defects early and keeping the mainline releasable.

Related: Continuous delivery, Pipeline (deployment pipeline), Technical debt
Continuous delivery

A practice that keeps software in a state where it can be released to production at any time, relying on automated testing and deployment pipelines rather than manual release projects.

Related: Continuous integration, Pipeline (deployment pipeline), Release
Pipeline (deployment pipeline)

The automated sequence of build, test, and deployment stages a change passes through on its way to production, providing fast feedback and consistent, repeatable verification.

Related: Continuous integration, Continuous delivery, Deployment
DevOps

A culture and set of practices that unite development and operations around shared ownership of delivery and reliability, emphasizing collaboration, automation, measurement, and continuous learning.

Related: Blameless postmortem, Continuous delivery, Site reliability engineering
Blameless postmortem

A structured review after an incident that focuses on systemic causes and contributing factors rather than individual fault, producing actionable improvements and shared learning.

Related: DevOps, Incident management, Kaizen
Site reliability engineering

An engineering discipline that applies software engineering to operations problems, using service level objectives, error budgets, and automation to balance reliability against change velocity.

Related: Service level objective, Error budget, DevOps
Service level indicator

A quantitative measure of a service's observed performance or reliability, such as request success rate or latency at a percentile, used as the raw signal for objectives and reporting.

Related: Service level objective, Error budget, Canary release
Service level objective

A target range for a service level indicator, such as 99.9 percent availability over a month, defining what reliability the service promises internally to guide engineering decisions.

Related: Service level indicator, Error budget, Site reliability engineering
Error budget

The amount of unreliability a service level objective permits in a period. Spending it on risky changes is allowed; exhausting it triggers a focus on stability over new features.

Related: Service level objective, Site reliability engineering, Change enablement
Change enablement

The practice of maximizing successful service changes by assessing risk, right-sizing approval and testing based on impact, and using automation and feedback to reduce failure and delay.

Related: Standard change, Change advisory board, Error budget
Standard change

A low-risk, pre-authorized change type with a documented procedure and known outcome, allowing teams to execute it repeatedly without per-instance approval and with minimal delay.

Related: Change enablement, Change advisory board, Deployment
Change advisory board

A group that reviews and advises on higher-risk changes, weighing impact, readiness, and timing. In agile settings its role narrows to exceptional or high-impact changes rather than routine work.

Related: Change enablement, Standard change, Risk register
Technical debt

The accumulated cost of shortcuts and deferred work in a product or service, which slows future change and raises failure risk unless made visible and deliberately repaid.

Related: Definition of Done, Continuous integration, Kaizen
Kaizen

The practice of continuous, incremental improvement driven by the people who do the work, using small experiments and regular reflection to remove friction and raise quality over time.

Related: Retrospective, Blameless postmortem, Value stream mapping
Retrospective

A recurring team meeting at the end of a cycle to inspect how work was done, identify improvements, and commit to a small number of concrete changes for the next cycle.

Related: Kaizen, Sprint, Psychological safety
Psychological safety

A team climate in which people can raise concerns, admit mistakes, and challenge decisions without fear of punishment, enabling honest retrospectives and faster learning.

Related: Blameless postmortem, Retrospective, Organizational readiness
Organizational readiness

The degree to which an organization has the skills, structures, leadership support, and culture needed to adopt agile service management successfully, assessed before and during transformation.

Related: Psychological safety, Transformation roadmap, Change enablement
Transformation roadmap

A staged plan describing how an organization will move from current practices to target agile service management capabilities, including sequencing, pilots, milestones, and success measures.

Related: Organizational readiness, Value stream mapping, Change enablement
Feedback loop

A mechanism that returns information about the results of an action to the people who can act on it, such as monitoring, user testing, or reviews, enabling timely correction.

Related: Minimum viable service, Service level indicator, Retrospective
Governance

The decision rights, policies, and oversight that direct how services are funded, changed, and assured, ideally expressed as guardrails that enable fast delivery rather than gate-by-gate control.

Related: Risk register, Change enablement, Compliance as code
Risk register

A maintained record of identified risks with owners, likelihood, impact, and mitigation actions, used to make trade-offs visible and to feed prioritization decisions.

Related: Governance, Change advisory board, Compliance as code
Compliance as code

Expressing regulatory and policy controls as automated, versioned checks in the delivery pipeline, so evidence is generated continuously and drift is detected quickly.

Related: Governance, Pipeline (deployment pipeline), Risk register
Configuration item

Any component under configuration control that must be identified, versioned, and tracked because it contributes to a service, such as servers, applications, or documentation.

Related: Service lifecycle, Deployment, Governance