This domain tests whether you can design controls that provide assurance without serialising delivery. Governance means decision rights plus the controls that evidence they were exercised - not a committee that approves everything.

Principles

  • Risk-based proportionality: control effort follows impact and likelihood. A customer-facing payments change warrants more control than a copy edit.
  • Prefer preventive controls where cheap (automated tests, peer review, pipeline gates) and detective controls where not (sampling, monitoring, audit logs).
  • Evidence should be a by-product of delivery: version history, pipeline logs, approval records, test results, retained automatically.
  • Policy as code: codify the rules the pipeline enforces, so control and evidence cannot drift apart.
  • Map every control to a risk and a requirement; unmapped controls add cost without assurance.

Small teams and segregation of duties

A team of six cannot staff separate developers, reviewers and deployers. Compensating controls preserve the intent: branch protection requiring review by someone other than the author, automated test gates, immutable deployment logs, four-eyes approval for high-risk changes, and periodic independent sampling. The objective is preventing undetected unauthorised change, not preventing one person from touching one system.

Worked example

An auditor asks for evidence that financial-reporting changes were authorised. The team shows that every change is a backlog item with a linked story and risk label; branch protection requires an approval from someone other than the author; the pipeline records tests, artifact hash and approver; production deploys run through the same pipeline with an immutable log; and a quarterly sample is reviewed against risk labels. Reasoning: each element maps to a control objective - authorised, tested, traceable - and is produced by the delivery process, so the evidence is current and complete without a separate audit exercise.

Traps

Assuming Agile means no documentation; inventing controls nobody maps to a risk; claiming segregation of duties requires separate teams; engaging audit only after go-live; treating compliance as a phase rather than continuous monitoring.

Key distinction

An auditor tests whether the control operated every time, so a control that depends on memory will fail sampling. Automate it, or expect to evidence exceptions.