Mistake 1

Using active power as apparent power

An inductive or distorted load may need more current than a unity-power-factor calculation implies.

What to do instead

Identify the waveform and power-factor definition before deriving current.

Mistake 2

Adding impedance magnitudes directly

Reactances have phase relationships and can partly cancel in a series combination.

What to do instead

Combine the complex quantities first, then find the required magnitude.

Mistake 3

Mixing equipment per-unit bases

Percent impedance is tied to the original rating and voltage reference.

What to do instead

Convert every impedance to the common stated base before assembling the network.

Mistake 4

Equating device current rating with fault duty

Continuous loading capability does not establish interruption performance.

What to do instead

Check normal-load, fault-duty and coordination requirements separately.

Mistake 5

Treating earthing as zero touch voltage

Actual impedance and fault current can create a potential difference even in a bonded system.

What to do instead

Use the complete arrangement and authorized protection assessment rather than a ground-symbol assumption.

Mistake 6

Calling a display proof of compliance

A displayed value can have scaling, setup, calibration or boundary errors.

What to do instead

Record the method and instrument, compare with the actual criterion and investigate contradictions.

Mistake 7

Averaging moist-air properties without a balance

Different streams may have different dry-air flows and moisture contents.

What to do instead

Use compatible mass and energy bases and the specified pressure conditions.

Mistake 8

Treating one component result as system approval

A correct theoretical quantity does not verify every interface, operating scenario or legal requirement.

What to do instead

Trace the complete design objective, dependencies, tests and unresolved limitations.

Mistake 9

Treating a model calculation as physical operating authorization.

The model omits equipment, legal and practical conditions.

What to do instead

State its classroom scope and obtain actual approved procedures before implementation.

Mistake 10

Mixing energy with power.

Rates and totals have different dimensions.

What to do instead

Write units and multiply power by time only under a stated time model.

Mistake 11

Using a display’s smallest increment as its accuracy.

Resolution does not measure bias, calibration or total uncertainty.

What to do instead

Read the instrument specification and include relevant uncertainty sources.

Mistake 12

Applying a formula outside its stated assumptions.

Memorized expressions can hide geometry, waveform or operating restrictions.

What to do instead

State assumptions and test whether the supplied scenario satisfies them.