EXIN Kanban Foundation study materials
EXIN Kanban Foundation study resources

EXIN Kanban Foundation flashcards

EXIN Kanban Foundation · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Kanban definition
A strategy for optimizing the flow of value through a process using visualization, explicit policies, and WIP limits, applied to the existing workflow rather than replacing it.
Visualize the workflow
Mapping the actual sequence of states and handoffs work passes through onto a board, including queues and buffers, so the real process can be seen and discussed.
WIP limit
An explicit cap on how many work items may occupy a workflow state at one time; a full state blocks new pulls until capacity is released.
Pull system
A control approach where downstream stages signal readiness and upstream work is released only on that signal, replacing push-based assignment of work regardless of capacity.
Little's Law
Average lead time equals average WIP divided by average throughput. It links the three core flow measures and predicts how WIP changes affect delivery time.
Lead time
Elapsed time from an agreed start point, typically when a customer request is committed, until the item is delivered to the customer.
Cycle time
Elapsed time from when work actively begins on an item until it is completed, excluding any waiting before the start point.
Throughput
The number of work items completed per unit of time, such as per week; a primary measure of system capability in Kanban.
Work item age
The elapsed time since a work item entered the workflow; items with the greatest age are the strongest candidates for attention to protect flow.
Flow efficiency
Active work time divided by total elapsed time for an item, expressed as a percentage; low values indicate large amounts of waiting.
Explicit policies
Written, visible rules governing how work moves, such as definitions of ready and done, WIP limits, classes of service, and escalation paths.
Kanban board columns
Columns represent workflow states, not roles or people; cards move across columns as work progresses, and column contents reveal queues and constraints.
Queues and buffers
Explicit waiting areas on the board between active states; making them visible exposes delay and lets the team decide whether to limit them.
Bottleneck
The workflow stage that constrains overall throughput; it is identified by accumulating work in front of it and relieved by limiting upstream WIP or adding capacity.
Evolutionary change
Kanban's improvement principle: start from the current process, make it visible, and change it in small measured steps rather than through prescribed reorganization.
Classes of service
Explicit policies that define how different types of work items are prioritized and handled, such as expedite, fixed date, standard, and intangible.
Expedite class
A class of service for urgent items that must bypass normal queue order; it typically uses a dedicated lane and separate WIP allowance to avoid swamping the system.
Fixed date class
A class of service for items with a hard deadline; selection and sequencing are driven by the date, and lateness risk is tracked explicitly.
Intangible class
A class of service for work whose value is not directly measurable in cost or revenue, such as technical debt or improvement work; it is often time-boxed.
Daily standup cadence
A short daily feedback loop focused on flow of work, blockers, and items at risk, rather than on individual status reporting.
Replenishment cadence
A recurring meeting where new work items are selected and pulled into the system, respecting available capacity and WIP limits.
Delivery planning cadence
A recurring review of which items will be delivered in the next period, based on throughput data and classes of service.
Operations review
A periodic system-level feedback loop examining flow metrics, blockers, and cross-team issues to drive improvement of the whole value stream.
Service delivery review
A feedback loop that compares actual service against customer expectations, using lead-time and throughput data to adjust policies and commitments.
Risk review
A cadence that examines pending work items against risk dimensions such as size, complexity, dependencies, and date sensitivity to plan mitigation.
STATIK
A systems-thinking approach to introducing Kanban: understand purpose, sources of dissatisfaction, demand, and capability, then model workflow, define classes of service, and design the system.
Kanban Maturity Model
A model describing progressive levels of Kanban adoption and organizational maturity, from basic team visualization toward enterprise-wide fitness for purpose.
Blocked item visibility
Marking blocked work clearly on the board, for example with a flag or blocker column, so waiting time and its systemic causes can be measured.
Definition of done
An explicit policy stating the criteria an item must meet before it counts as complete, preventing partial work from being counted as throughput.
Definition of ready
An explicit policy stating the criteria an item must meet before it can be pulled into active work, reducing rework and mid-stream surprises.
Improvement experiment
A managed change with a stated hypothesis, a measure, a defined trial period, and a review decision to keep, adjust, or revert.
Kanban with Scrum
Using Kanban practices such as WIP limits and flow metrics inside an existing Scrum process to expose bottlenecks and improve delivery predictability.