Pre-Examination Activities

  • Research sequence: gather subject deed and plat, adjoiner deeds, prior surveys, and public records first; written record evidence never outranks an original monument that the deed calls for.

  • Pre-mobilization instrument checks: peg test for level line of sight, plate/lircular bubble adjustment, optical plummet check, and EDM comparison against a calibrated baseline.

  • Collimation error by two-face observation: error = (reading FL − reading FR ± 180°)/2 for horizontal angles; the mean of faces cancels the error.

  • Coordinate metadata that must be identified before using any control: datum and realization, epoch, projection and zone, linear unit, and order/class of accuracy.

  • Control-network selection depends on required accuracy order: traverse for corridor work, static GNSS for long baselines and open sky, RTK/VRS where a single receiver must be positioned quickly.

  • In the United States, call 811 before any excavation or monument setting; most states require the locate request two to three working days before work begins.

  • Corner-record statutes typically require the monument material and dimensions, a cap stamped with the surveyor's license number, and filing of the record within a stated period.

  • Field safety controls: MUTCD-compliant traffic control, high-visibility apparel, fall protection above six feet, and hazard communication for fuels and herbicides.

  • Land-entry authority must be documented; a right-of-entry, permit, or written permission protects the surveyor against trespass claims and supports the final report.

Quick reference

Surveying Instruments and Procedures

  • Peg test: take the elevation difference between two points with the level set midway (true difference), then re-observe with the instrument near one point; the discrepancy is the collimation error for that sight length.

  • Curvature and refraction in leveling: combined correction ≈ 0.0675 K² meters with K in kilometers; refraction offsets roughly one-seventh of the curvature effect and is subtracted from the rod reading.

  • EDM accuracy is stated as ±(a mm + b ppm); atmospheric correction uses temperature, pressure, and humidity, with the correction changing roughly 1 ppm per 1 °C.

  • Total-station angles are turned clockwise from the set zero; a zenith angle of 90° is horizontal and 0° is directly overhead.

  • Direct and reverse (face left/face right) observations cancel horizontal collimation, trunnion-axis, and vertical-index errors; the mean of the two faces is the accepted value.

  • Traverse types: closed-loop returns to the starting point, closed-link begins and ends on known control, open traverse has no closure check and is avoided for boundary work.

  • Angular misclosure of an n-sided closed polygon = measured angle sum − (n − 2)(180°); distribute the misclosure equally or in proportion to instrument weights before computing coordinates.

  • Instrument error sources: residual level-bubble error, optical plummet misalignment, EDM zero and prism constant, and axis non-perpendicularity.

  • Natural error sources: atmospheric refraction, thermal expansion, wind-induced vibration, tripod settlement, and unstable instrument points.

Quick reference

Boundary and Cadastral Surveys

  • Evidence hierarchy: natural monuments outrank artificial monuments, which outrank courses and distances, which outrank area; quantity yields to quality.

  • Senior rights: an earlier conveyance prevails over a later one for the same land, so a junior deed conveys only what the senior deed left unconveyed.

  • Public Land Survey System: a township is 36 sections in a 6-by-6 arrangement, each section nominally one mile square and 640 acres; original government-set corners are controlling monuments.

  • Lost-corner reestablishment uses single proportionate measurement between the nearest existent corners on the same line unless the position can be restored from independent accepted evidence.

  • Tidal boundary waters are generally bounded by mean high water; non-tidal navigable waters are commonly bounded by the ordinary high water mark, with title extent set by state law.

  • Accretion and reliction are gradual and move the boundary with the water; avulsion is sudden and leaves the boundary where it was before the event.

  • Unwritten rights that can control a boundary include practical location, acquiescence, estoppel, and adverse possession, regardless of deed language.

  • Adverse possession elements: actual, open and notorious, exclusive, hostile, and continuous for the statutory period.

  • A meander line is evidence of the water's location at the time of survey; it is not a boundary line and does not limit the conveyance.

Quick reference

Photogrammetry and Remote Sensing

  • Photograph scale S = f / (H − h), with f the focal length, H the flying height above datum, and h terrain elevation; scale varies across a single vertical photo with relief.

  • Relief displacement d = r·h / H, where r is the radial distance from the principal point; displacement is zero at the nadir point and increases outward.

  • Parallax height equation: h = H·Δp / (P + Δp), with Δp the parallax difference between points and P the parallax at the reference elevation.

  • Air base between exposures B = (1 − endlap fraction) × ground coverage of one photograph along the flight line; side spacing = (1 − sidelap fraction) × ground width.

  • Ground sample distance = pixel size × (H / f), equivalently pixel size times the photo-scale denominator.

  • An orthophoto is differentially rectified to remove tilt and relief displacement, giving a uniform map scale suitable for measuring positions.

  • A DTM/DEM represents bare-earth elevations; a DSM includes buildings and vegetation; LiDAR classification separates ground returns from canopy and structures.

  • Airborne topographic LiDAR is specified by point density (points per square meter) and vertical accuracy as RMSEz, commonly 5–15 cm for modern sensors.

  • Representative satellite resolutions: Landsat multispectral 30 m, Sentinel-2 10 m, WorldView-3 panchromatic about 0.31 m.

Quick reference

Geodesy and Geodetic Surveying

  • Height relationship: h = H + N, where h is ellipsoidal height, H is orthometric height above the geoid, and N is the geoid undulation.

  • NAD83 is referenced to the GRS80 ellipsoid; NAD27 used the Clarke 1866 ellipsoid; NAVD88 provides orthometric heights derived from tide-gage observations.

  • Grid distance = ground distance × combined factor; combined factor = grid scale factor × elevation factor, with elevation factor ≈ R / (R + h).

  • Universal Transverse Mercator: 6°-wide zones, central-meridian scale factor 0.9996, false easting 500,000 m, zero false northing in the northern hemisphere.

  • Grid azimuth = geodetic azimuth − convergence angle, with convergence approximately Δλ · sin φ measured from the central meridian.

  • Datum transformation uses a similarity (Helmert) model with seven parameters: three translations, three rotations, and one scale factor.

  • Astronomic and geodetic azimuths differ by the Laplace correction, which depends on the deflection of the vertical.

  • Coordinates must carry a realization and epoch, for example NAD83(2011) at epoch 2010.00, because plate motion changes coordinates with time.

  • Spherical excess of a geodetic triangle equals its area divided by R² in radians and is applied to close triangles observed on the ellipsoid.

Quick reference

Surveying Calculations and Adjustments

  • Latitude = distance × cos(azimuth); departure = distance × sin(azimuth); azimuth is measured clockwise from north.

  • Linear error of closure = √[(Σlatitude)² + (Σdeparture)²]; relative precision = closure / total traverse length, stated as 1:N.

  • Bowditch (compass) rule distributes misclosure in proportion to course length; the transit rule distributes it in proportion to the absolute latitudes and departures.

  • Least squares minimizes Σv²; normal equations are N = AᵀWA and X = (AᵀWA)⁻¹AᵀWL, which also yield residuals, a variance factor, and error ellipses.

  • Weighted mean = Σ(wx)/Σw with weights w = 1/σ²; the weight of the mean equals the sum of the weights.

  • Error propagation for independent variables: σz² = (∂z/∂x)²σx² + (∂z/∂y)²σy².

  • Horizontal curve formulas: T = R tan(Δ/2); L = RΔ in radians; LC = 2R sin(Δ/2); M = R[1 − cos(Δ/2)]; E = R[sec(Δ/2) − 1].

  • Degree of curve, arc definition: R = 5729.578 / D; chord definition: R = 50 / sin(D/2).

  • Area by coordinates: 2A = Σ(Xi·Yi+1 − Xi+1·Yi), taken in order around the traverse; the sign indicates the direction of travel.

Quick reference

Mapping and Platting

  • Scale as a representative fraction is dimensionless: 1:1,200 means one map unit equals 1,200 ground units, and 1 in = 100 ft is the same as 1:1,200.

  • Contour interval is chosen so adjacent contours remain legible at the plotted scale and match the map's purpose; larger-scale maps support smaller intervals and finer terrain depiction.

  • Plat content: basis of bearing, bearings and distances, curve data (radius, arc, chord, central angle), area, monument descriptions, adjoiner names, and the surveyor's seal and signature.

  • Map accuracy is reported as RMSE under NSSDA/ASPRS-style standards; horizontal accuracy is tied to map scale and vertical accuracy to contour interval.

  • Maps on a projected grid show grid distances and grid north; ground distances must be converted using the combined factor before comparison.

  • Metes-and-bounds parcels must mathematically close; the misclosure and the area computed by coordinates are typically tabulated on the face of the plat.

  • Digital submissions should separate boundary, easement, improvement, and annotation layers and be georeferenced to the datum, realization, and epoch stated on the map.

  • Vertical information on a map requires contour lines, spot elevations, and benchmarks referenced to a stated vertical datum such as NAVD88.

  • Easements and rights-of-way are shown graphically and tabulated with bearings, distances, widths, and the document reference of record.

Quick reference

Construction Surveys

  • Cut/fill at a point = design elevation − existing ground elevation; a positive result is cut and a negative result is fill.

  • Grade stakes carry the cut or fill dimension at the stake; hubs with tacks mark the offset line and are referenced to a project benchmark.

  • Square a building corner with the 3-4-5 relationship and confirm by comparing diagonals, which must be equal for a true rectangle.

  • A temporary benchmark is set outside the construction influence zone and checked into existing vertical control before any layout.

  • Offsets from control lines to structure faces are set with batter boards or hubs placed clear of excavation and backfill.

  • Slope stakes require the catch point where the design side-slope plane intersects existing ground, found by trial computation along measured offsets.

  • As-built surveys compare constructed to designed positions; typical tolerances are about ±0.02–0.05 ft for structures and ±0.1 ft for earthwork.

  • Site GNSS RTK layout needs a local base or network correction and a site calibration to the project's local control and grid.

  • Earthwork volumes come from average end area, prismoidal, or cross-section methods and are compared to design quantities to support payment.

Quick reference

Business and Professional Practice

  • Common compensation structures: lump sum, time and materials, cost plus fixed fee, and unit price; scope, deliverables, and exclusions belong in writing.

  • Standard of care is the degree of skill and care ordinarily exercised by reputable surveyors under similar circumstances; failing it establishes negligence.

  • Responsible charge means the licensed surveyor who directs and controls the work; most jurisdictions require that person's seal and signature on final documents.

  • Indemnification and hold-harmless clauses for a party's own negligence are limited or void in many states, and anti-indemnity statutes may override contract language.

  • A statute of limitations runs from the injury or its discovery; a statute of repose bars claims after a fixed period regardless of when the injury is discovered.

  • Field notes, computations, and correspondence should be retained under contract and state requirements, commonly five to ten years or longer for boundary work.

  • Board rules generally prohibit contingent compensation tied to a boundary location opinion and require disclosure of conflicts of interest to clients.

  • Professional liability (errors and omissions) insurance covers negligent professional services; commercial general liability policies typically exclude them.