Week 1

Fire Sprinkler System Design and Installation Standards & NFPA 13 and Related NFPA Standards

  • Map every chapter of NFPA 13 (2019 or 2022 edition as adopted) to the six exam domains so you know which sections carry the most weight

  • Read and annotate the occupancy classification and commodity classification chapters, writing your own one-page decision tree for light, ordinary, and extra hazard

  • Compute design density and remote area size for four worked examples covering wet, dry, and preaction systems

  • Build a personal formula sheet covering density/area curves, hose allowance, and sprinkler discharge equations

Your checkpoint

A 6-10 page handwritten or typed standards summary with a completed density/area worksheet for four example systems

Week 2

Fire Sprinkler System Design and Installation Standards & NFPA 13 and Related NFPA Standards

  • Work through pipe sizing, hydraulic calculation, and friction loss methods including Hazen-Williams and the equivalent length approach

  • Diagram the four major sprinkler system types and label their components, valves, and alarm devices from memory

  • Solve five hydraulic junction problems using the loop and tree method without consulting worked solutions first

  • Compare NFPA 13 requirements against NFPA 13R and 13D to identify where residential and limited-area rules diverge

Your checkpoint

A completed hydraulic calculation packet with five solved problems and a side-by-side 13 vs 13R vs 13D comparison chart

Week 3

Fire Sprinkler System Design and Installation Standards & NFPA 13 and Related NFPA Standards

  • Study water supply analysis: flow tests, N^1.85 curves, and how to plot a supply curve against a demand curve

  • Review acceptance testing, flushing, hydrostatic testing, and inspection requirements under NFPA 13 and NFPA 25

  • Memorize clearance, obstruction, and spacing rules for sprinkler heads including the small room and closet exceptions

  • Draft a one-page checklist of common plan review deficiencies tied to NFPA 13 chapters

Your checkpoint

A water supply analysis exercise plotting a real-style flow test against a calculated demand curve, plus a 20-item plan review checklist

Week 4

Florida Building Code and Fire Prevention Code & Contracting Business and Project Management

  • Trace how the Florida Building Code adopts and amends NFPA 13, including local amendments and the Florida Fire Prevention Code relationship

  • Identify inspection and permitting responsibilities between the building official and the fire marshal for sprinkler work

  • Outline the contractor licensing pathway, including the scope of work allowed under a fire protection system contractor license

  • Draft a sample project schedule and responsibility matrix for a mid-size commercial sprinkler installation

Your checkpoint

A 2-3 page code adoption map plus a project responsibility matrix for a hypothetical 40,000 sq ft building

Week 5

Florida Building Code and Fire Prevention Code & Safety, Licensing, and Florida Contractor Law

  • Summarize Florida contractor law topics: licensing, qualifying agent duties, continuing education, and disciplinary grounds

  • Explain workers' compensation, insurance, and lien requirements that affect a Florida sprinkler contractor

  • Review OSHA and NFPA 51B hot work and confined space safety requirements for field crews

  • Write a jobsite safety orientation outline covering fall protection, tool use, and pressure testing hazards

Your checkpoint

A 4-6 page compliance and safety handbook covering licensing, insurance, liens, and jobsite safety procedures

Week 6

Estimating, Bidding, and Plan Reading & Contracting Business and Project Management

  • Read a full sprinkler plan set and produce a takeoff of heads, pipe, fittings, and hangers for one floor

  • Build a bid using labor units, material pricing, overhead, and profit margin, then compare against a competitor-style low bid

  • Identify change order triggers and draft a change order request template

  • Practice reading schedules, riser diagrams, and specifications to spot scope gaps between drawings and specs

Your checkpoint

A completed material takeoff and bid summary for one floor with a written margin analysis

Week 7

Estimating, Bidding, and Plan Reading & NFPA 13 and Related NFPA Standards & Florida Building Code and Fire Prevention Code

  • Complete a full-length timed practice exam and score each domain separately

  • Re-solve every missed question and write the code citation or reason for the correct answer

  • Review plan review and inspection scenarios that combine estimating, code, and standards knowledge

  • Drill the most commonly tested numeric thresholds: densities, spacing, clearances, and testing pressures

Your checkpoint

A scored practice exam with a written error log identifying each missed topic and its source reference

Week 8

Fire Sprinkler System Design and Installation Standards & NFPA 13 and Related NFPA Standards & Florida Building Code and Fire Prevention Code & Contracting Business and Project Management & Estimating, Bidding, and Plan Reading & Safety, Licensing, and Florida Contractor Law

  • Re-take the practice exam and target a score above 80 percent overall with no domain below 70 percent

  • Review your weakest two domains using your own summary sheets and error log only

  • Recite key code citations and formulas from memory in a rapid-fire self-quiz

  • Plan exam-day logistics including allowed references, identification, and timing strategy

Your checkpoint

A final one-page personal cheat sheet plus a second scored practice exam showing improvement over week 7

Milestones

Week 2: Complete five hydraulic problems unaided and correctly identify system type and components on a blank diagram with at least 90 percent accuracy

Week 4: Explain the Florida adoption chain for NFPA 13 and pass a self-quiz on licensing and permitting responsibilities at 80 percent or better

Week 6: Produce a takeoff and bid for one floor that reconciles material, labor, and margin with no unexplained gaps against the plan set

Week 7: Score at least 70 percent on the first full practice exam and have a documented error log for every missed item

Week 8: Score at least 80 percent overall on the second practice exam with no single domain below 70 percent