- Chapter 472, F.S.
- The Florida statute that governs the practice of surveying and mapping, including licensure requirements, disciplinary actions, and the duties of the Board of Professional Surveyors and Mappers.
- Chapter 177, F.S.
- The Florida statute that regulates platting and recording of subdivisions, including requirements for plat approval, contents, and the process for correcting plats.
- Chapter 120, F.S.
- The Administrative Procedure Act of Florida, which sets out procedures for agency rulemaking, adjudication, and judicial review, affecting how surveying regulations are created and challenged.
- Rule 5J-17, F.A.C.
- The Florida Administrative Code rule chapter that contains the Board of Professional Surveyors and Mappers' regulations, including minimum technical standards for surveys and recordkeeping requirements.
- Minimum technical standards
- Standards adopted by the Board that specify the minimum accuracy, content, and documentation required for boundary surveys, including ties to the Florida State Plane Coordinate System.
- Certificate of authorization
- A certificate issued by the Board to a business entity that offers surveying services, requiring a licensed surveyor to be in responsible charge of the entity's surveying work.
- Seal and signature
- A licensed surveyor must affix their seal and signature to final survey documents, certifying that the work was performed under their responsible charge and meets applicable standards.
- Record retention
- Surveyors must retain field notes, calculations, and other survey records for a minimum of five years after completion of the survey, as required by Rule 5J-17.052, F.A.C.
- Hierarchy of evidence
- The order in which boundary evidence is considered: natural monuments, artificial monuments, courses and distances, and area, with natural monuments generally controlling over measurements.
- Original government corner
- A corner established by the original U.S. Public Land Survey; Florida law requires these corners to be preserved or reestablished using the best available evidence, including original field notes.
- Lost corner
- A corner whose original monument cannot be found or identified; it may be reestablished by proportioning distances between existing corners or by other collateral evidence.
- Remonumentation
- The process of reestablishing and marking a boundary corner that has been lost or destroyed, often requiring a new plat or affidavit of correction under Chapter 177, F.S.
- Monument description
- A detailed record of a monument's material, dimensions, and identifying marks, which must be included in survey documents to allow future surveyors to locate and verify the monument.
- Boundary by acquiescence
- A legal doctrine where a boundary line long recognized and accepted by adjacent landowners may be enforced even if it differs from the record boundary, based on evidence of agreement and reliance.
- Plat amendment
- A formal change to a recorded plat, requiring approval by the local governing body and recording of a new plat or affidavit of correction in accordance with Chapter 177, F.S.
- Angular closure
- The difference between the sum of measured interior angles of a closed traverse and the theoretical sum (n-2)×180°; it must be within allowable tolerance for the survey to be accepted.
- Linear error of closure
- The vector sum of all courses in a traverse, representing the distance between the computed and starting points; relative precision is the ratio of this error to total traverse length.
- NAD 83
- The North American Datum of 1983, the horizontal geodetic datum used for the Florida State Plane Coordinate System and most modern surveying in Florida.
- NAVD 88
- The North American Vertical Datum of 1988, the vertical reference used for elevations in Florida surveys, replacing the older NGVD 29.
- Florida State Plane Coordinates
- A coordinate system based on NAD 83 that divides Florida into zones (East, West, North) for mapping and surveying, allowing consistent location of points across the state.
- GNSS survey
- A survey using Global Navigation Satellite Systems, which must be tied to the Florida Permanent Reference Network or approved CORS and meet accuracy standards for boundary work.
- Ordinary high water line
- The line along a water body that marks the ordinary high water mark; in Florida, it often defines the boundary between private uplands and sovereign submerged lands.
- Single-proportion method
- A technique for reestablishing a lost corner by dividing the distance between two existing corners proportionally to the original record distances, used when the original line is straight.
- Double-proportion method
- A technique for reestablishing a lost corner by proportioning in two directions, typically used when the corner is at the intersection of two lines and both directions have evidence.
- Metes and bounds description
- A property description that defines boundaries by courses (bearings) and distances from a point of beginning, often referencing monuments; it must close mathematically and state the basis of bearings.
- Point of beginning
- The starting point of a metes and bounds description, typically a monument or a point referenced to a monument, from which all courses and distances are measured.
- Basis of bearings
- The reference direction used for bearings in a survey, such as true north, magnetic north, or an assumed line; it must be stated in the description to allow retracement.
- Subdivision plat
- A map of a subdivision showing lots, blocks, streets, easements, and dedications, which must be approved and recorded in the county public records to create legal lots.
- Affidavit of correction
- A document used to correct minor errors in a recorded plat, such as scrivener's errors, without requiring a new plat, as allowed by Chapter 177, F.S.
- Aliquot part description
- A property description using government survey subdivisions, such as the NW 1/4 of the SE 1/4, which is acceptable if the government survey corners are intact.
- Field notes
- The permanent written record of a survey, including measurements, sketches, monument descriptions, and conditions; they must be legible, dated, and retained for at least five years.
- Plat approval
- The process by which a local governing body reviews and approves a subdivision plat before it can be recorded; approval ensures compliance with local ordinances and Chapter 177, F.S.