It is 7:30 a.m. on a July day in Jacksonville. Your crew is installing a 6 in. sanitary lateral in a 7 ft 6 in. deep, 40 ft long trench along a new access road. The soil is loose sandy fill with a high water table, and overnight rain left 8 in. of water in the bottom. The excavator operator has been placing spoil and a concrete manifold directly on the trench edge, and the bucket is parked over the trench. The only ladder is at the far end, 38 ft from where two laborers are working. The crew foreman, who is the designated competent person, is at the shop picking up parts. The utility locate ticket expired two days ago.

1. List the hazards and state what must occur before anyone enters the trench.

Read the worked answer

Hazards: unprotected excavation deeper than 5 ft; saturated loose sand with a high water table; water accumulating in the bottom; spoil and a concrete manifold surcharging the edge; excavator bucket suspended over the excavation; egress 38 ft away; no competent person on site; expired locate with unmarked utilities in the ground.

Before entry:

  1. A protective system must be in place. At 7 ft 6 in. you are well past the 5 ft trigger.
  2. Water must be controlled with a sump and pump. Standing water in loose sand is the classic collapse setup, and less than 2 ft of water drowns a worker pinned in the mud.
  3. Spoil and the manifold come back at least 2 ft from the edge, and the excavator must not travel or sit at the edge - surcharge load is a primary collapse driver.
  4. The bucket comes off the trench and the machine is shut down before anyone enters.
  5. A ladder within 25 ft of lateral travel for every worker, extending 3 ft above the top of the trench.
  6. A competent person inspects at the start of the shift, after rain, and after any change. The foreman is not there - the crew chief stops work until he arrives.
  7. A fresh 811 locate before any further digging.
  8. Barricades and traffic control on the access road; no one works alone.

2. What protective option would you choose and why?

Read the worked answer

Choice: a tabulated trench box or shoring system rated for the depth, combined with dewatering.

Why sloping and benching will not work here:

  • The soil is Type C - loose sandy fill with a high water table. Benching is prohibited in Type C, and the maximum allowable slope is 1.5H:1V, roughly 34 degrees.
  • At 7 ft 6 in. deep, a 1.5:1 slope means the excavation opens about 11 ft 3 in. back from each wall. On a 40 ft trench that is a crater roughly 27 ft wide, which will undercut the new access road, any buried utilities, and the adjacent right-of-way. It is not buildable.

Practical requirements for the box:

  • Manufacturer's tabulated data on site; the box is rated for the depth and the soil type.
  • Top of the box above grade to prevent spill-in, bottom within 2 ft of the trench bottom.
  • Installed by workers who are themselves protected - nobody enters an unprotected trench to set it.
  • Dewatering running continuously; the box does not stop a blow-in from water.
  • If the depth exceeds 20 ft, or the box is used outside its tabulated conditions, an engineer's design is required.

3. Who is accountable, and what are the practical consequences?

Read the worked answer

The employer is accountable, and the obligations run to the employer, not to the individual worker: competent person designated and actually present on site, daily and post-rain inspections, protective systems, access and egress, water control, spoil placement, and utility locating.

Consequences:

  • Serious and willful citations assessed per employee exposed, stop-work orders, and mandatory abatement before the crew returns.
  • A cave-in in saturated loose sand at 7 ft 6 in. is typically fatal, and a fatality brings a criminal referral in many jurisdictions.
  • The general contractor will treat this as a safety-default event and can remove you from the site.
  • Your workers' compensation and liability carriers will ask why a competent person was off site buying parts.

Practical fix: treat competent person as a role, not a title. Never assign it to the only person who leaves the site. Give every crew member written stop-work authority. A locate call and a rented trench box cost less than one lost day.