FL Roofing Contractor study materials
FL Roofing Contractor study resources

FL Roofing Contractor study plan

FL Roofing Contractor · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Roofing Materials, Systems, and Installation

  • Build a side-by-side matrix of at least six steep-slope covering types (asphalt shingle, clay/concrete tile, metal panel, metal shingle, wood shake, synthetic slate) listing minimum slope, approved underlayment, and fastening method for each.

  • Compute roof area, pitch multiplier, and material quantity with waste factor for three practice roof geometries, showing every step.

  • Sequence the installation of eave flashing, valley flashing, step flashing, counterflashing, and drip edge for one hip-and-valley roof and one sidewall intersection, writing the order out step by step.

  • Explain to a mock client, in plain language, why two different underlayments are specified for two different slopes on the same roof.

Your checkpoint

A one-page covering-selection and flashing-sequence reference sheet you can study from, plus three worked quantity takeoffs scored against an answer key (target 90% arithmetic accuracy).

Week 2

Roofing Materials, Systems, and Installation & Codes, Plan Reading, and Jobsite Safety

  • Assemble a comparison of low-slope membrane systems (TPO, EPDM, modified bitumen, built-up, spray polyurethane foam) covering substrate prep, seaming or application method, and typical warrantable detail requirements.

  • Diagram a complete low-slope assembly from deck to surfacing, labeling deck, insulation, cover board, membrane, and termination, and state the purpose of each layer.

  • Identify the fastening and attachment requirements that govern wind uplift for the systems above, and describe how attachment spacing changes with edge zone versus field zone.

  • Locate and read the product approval information for three roofing products, recording approval number, product category, and any listed installation limitations.

  • List five common installation defects an inspector would flag on a low-slope roof and the code or manufacturer requirement each one violates.

Your checkpoint

A labeled low-slope roof assembly cross-section drawing with a written layer-by-layer justification, plus a five-item defect log with the governing requirement cited for each.

Week 3

Codes, Plan Reading, and Jobsite Safety

  • Read a full set of residential roof plan sheets and extract slope, ridge and valley locations, penetration locations, and roof-area dimensions without guessing.

  • Practice navigating the Florida Building Code roofing chapter and the wind-load provisions to answer ten look-up questions in under 20 minutes total.

  • Convert a plan's roof plan view into a written takeoff of linear feet of ridge, hip, valley, eave, and rake.

  • Explain how wind speed maps and exposure categories change the attachment schedule on the same building, and demonstrate with two worked examples.

  • Write out the inspection points a local building department would check at dry-in, mid-roof, and final for a shingle reroof.

Your checkpoint

A completed code look-up worksheet of ten questions with code citations and a one-page plan-reading summary (slopes, dimensions, penetration count, linear-foot takeoff) completed within a 45-minute timed block.

Week 4

Codes, Plan Reading, and Jobsite Safety

  • Build a jobsite safety checklist covering fall protection, ladder placement and securing, roof-edge warning lines, and hole protection, cross-referenced to the applicable standards.

  • Identify the fall-protection trigger threshold and the acceptable systems for a steep-slope roof, then state which system you would choose for a two-story tile roof and defend the choice.

  • Outline safe practices for hot-work, kettle or torch operations on a low-slope roof, including fire watch and clearance requirements.

  • Draft a one-page site-specific safety plan for a residential reroof on an occupied home, addressing access, material staging, debris removal, and homeowner protection.

  • Explain the notification, permitting, and inspection sequence a contractor must follow on a reroof in Florida, in correct order.

Your checkpoint

A complete site-specific safety plan plus a 20-question self-quiz on codes and safety, scored with every missed item rewritten as a corrected fact statement.

Week 5

Business and Financial Management

  • Construct a chart of accounts for a small roofing company with at least 15 line items and classify each as direct job cost, overhead, or owner expense.

  • Build a job-costing spreadsheet for a sample reroof that includes labor, material, equipment, subcontractor, permits, and a 10% contingency, and calculate gross margin at three price points.

  • Calculate break-even revenue given a fixed monthly overhead figure and a target gross margin percentage, showing the formula and the result.

  • Prepare a 12-month cash flow projection for the sample company and identify the two months with the greatest cash risk.

  • Differentiate the tax and recordkeeping obligations that apply to a Florida roofing contractor, and list the financial records that must be retained.

Your checkpoint

A working job-cost and break-even workbook for one sample project, plus a one-page written explanation of the resulting margin and break-even numbers.

Week 6

Contract Administration and Project Management

  • Draft a residential roofing contract that includes scope, exclusions, payment schedule, change-order procedure, warranty terms, lien notice, and dispute resolution.

  • Write a change-order form and a punch-list/sign-off form that a crew could use on a live job.

  • Build a schedule for a five-day reroof that sequences tear-off, dry-in, inspections, and finish, accounting for a weather day and an inspection hold.

  • Describe how to document a disputed existing-condition finding (rotten decking, prior layers) so the change order is enforceable, and write the client notification language.

  • Explain lien rights, notice requirements, and the consequences of failing to follow them, and map each step to the point in the project where it must occur.

Your checkpoint

A contract packet containing a complete residential roofing agreement, a change-order form, and a project schedule, all internally consistent on scope, price, and dates.

Week 7

Roofing Materials, Systems, and Installation & Codes, Plan Reading, and Jobsite Safety

  • Re-score every missed item from weeks 1 through 4 and rewrite each as a correct, self-contained fact you can restate from memory.

  • Complete a 60-question mixed practice set drawn from materials, codes, and safety, and log which subtopics produced the misses.

  • Re-derive the flashing sequence and the low-slope assembly diagram from blank paper, without notes, and compare against your week 1 and 2 references.

  • Time yourself answering code look-up questions and cut your average per-question look-up time.

Your checkpoint

A reworked error log with every week 1-4 miss converted into a corrected statement, plus a timed 60-question practice set scored at or above 75%.

Week 8

Business and Financial Management & Contract Administration and Project Management & Roofing Materials, Systems, and Installation & Codes, Plan Reading, and Jobsite Safety

  • Take two full-length simulated exams under timed conditions and score each by domain.

  • Re-derive the business calculations (job cost, margin, break-even, cash flow) from scratch without notes to confirm retention.

  • Recite your contract's required elements and the safety plan's required elements from memory, then check against your week 4 and week 6 deliverables.

  • Rank all four domains by your simulated-exam scores and spend remaining time only on the two lowest.

Your checkpoint

Two completed timed simulated exams with per-domain score breakdowns and a final one-page formula-and-sequence sheet covering the items you missed most.

Milestones

Week 2: You can draw a complete low-slope assembly and a steep-slope flashing sequence from blank paper, and you have located product approval data for three roofing products without help.

Week 4: You score at least 75% on the 20-question codes-and-safety self-quiz and have produced a site-specific safety plan a crew could actually work from.

Week 6: Your contract packet is complete and internally consistent, and you can compute job cost, gross margin, and break-even for a sample project without reference notes.

Week 8: Both timed simulated exams are complete, every domain scores at or above 75%, and your error log has been closed out with corrected statements for every missed item.