FOA CFOS/DC study materials
FOA CFOS/DC study resources

FOA CFOS/DC flashcards

FOA CFOS/DC · Build recall with a focused review session.

30 cards. Read the term and the definition here. The deck at the top of this page is optional.

Link loss budget
Maximum allowable optical loss between transmitter and receiver, calculated as transmitter output minus receiver sensitivity, less a safety margin for aging, repairs, and temperature effects.
Receiver sensitivity
Minimum optical power at which a receiver meets its bit-error-rate specification; used as the low end of the loss budget calculation.
Safety margin
Extra decibels reserved in a loss budget for future splices, connector reterminations, component aging, and temperature variation; commonly around 3 dB.
Connector loss allowance
Typical planning value of 0.3 to 0.75 dB per mated connector pair, depending on connector polish and quality; counted for every mated pair in the channel.
Splice loss allowance
Planning value of roughly 0.1 to 0.3 dB per fusion splice, applied to every splice in the link when summing channel loss.
OS2 attenuation values
Single-mode fiber planning loss of about 0.35 dB/km at 1310 nm and 0.20 to 0.25 dB/km at 1550 nm; used for long-reach backbone calculations.
OM4 modal bandwidth
Approximately 4700 MHz·km at 850 nm, giving longer 10G and 40G/100G multimode reach than OM3, which is about 2000 MHz·km.
Bandwidth-limited distance
Maximum reach set by modal dispersion and signaling rate rather than by optical power; the shorter of loss-limited and bandwidth-limited distance governs design.
MPO polarity method B
Trunk assembly with a flipped fiber arrangement, key-up to key-up at both ends; paired with the correct patch cords so each transmitter reaches the matching receiver.
Duplex patch cord A-to-B
Straight-through duplex cord wired A-to-B, used in pairs so that transmit at one end lands on receive at the other end of a duplex LC channel.
Centralized cabling
Design where horizontal cables run from work areas to one main cross-connect, reducing active electronics and simplifying administration at the cost of longer cable runs.
Zone cabling
Design using an intermediate connection point serving a floor area, reducing cable quantities and easing moves-adds-changes in high-density or open-plan spaces.
100GBASE-SR4 media
100G Ethernet using four 25G lanes over eight multimode fibers with MPO connectors at 850 nm; reach depends on OM3/OM4 bandwidth and loss.
100GBASE-LR4 media
100G Ethernet using four LAN-WDM wavelengths near 1310 nm over duplex single-mode fiber, supporting 10 km reach with OS2 cabling.
Horizontal channel length
Permanent link of up to 90 m plus up to 10 m of patch cords, giving a 100 m channel limit for twisted-pair; fiber backbone limits follow application budgets.
Route diversity
Physically separate cable paths for protected or redundant links, so a single conduit cut or building incident cannot disable both working and protection paths.
Work breakdown structure
Deliverable-oriented hierarchy of project scope; each element is assigned an owner, duration estimate, and acceptance criterion before scheduling begins.
Critical path
Longest-duration sequence of dependent activities through the schedule network; it determines the earliest project completion date and has zero total float.
Total float
Amount of time an activity can slip without delaying project completion, computed as late start minus early start or late finish minus early finish.
Cost variance formula
CV equals earned value minus actual cost; a negative result means the project has spent more than the value of work completed.
Schedule variance formula
SV equals earned value minus planned value; a negative result indicates work is behind the planned schedule baseline.
Cost performance index
CPI equals earned value divided by actual cost; a value below 1.0 signals cost overrun relative to the value delivered.
Schedule performance index
SPI equals earned value divided by planned value; a value below 1.0 indicates the project is progressing slower than the baseline plan.
Risk register entry
Record containing risk description, probability, impact, score, owner, response strategy such as avoid, mitigate, transfer, or accept, and the trigger condition.
Change control board
Group that reviews change requests, assesses cost and schedule impact, and approves, rejects, or defers changes to the approved project baseline.
Approved baseline
Formally accepted version of scope, schedule, and cost used to measure performance; changes require documented approval and rebaselining.
Long-lead procurement
Ordering cable reels, MPO trunks, cabinets, and transceivers early because delivery times exceed normal installation sequencing; dates tie to milestones.
Acceptance test gate
Planned checkpoint with pre-defined pass/fail criteria, such as insertion loss and OTDR results, that must be met before handover to the next phase.
Stakeholder register
List of project roles and interested parties with their influence, interest, communication needs, and escalation path for issue resolution.
Decision log
Running record of project decisions, rationale, date, and owner; used to prevent scope creep and to preserve traceability during audits and handover.