Pot life
The usable period of mixed material under specified conditions, distinct from the exposed adhesive’s open time after spreading.
Open time
The product-specific interval for placing tile into spread adhesive under relevant conditions, which is not established merely by a fresh batch age.
Transferred contact
Actual adhesive contact between tile and substrate assessed by a suitable method, not guaranteed simply by choosing a larger notched trowel.
Movement joint
A designed provision accommodating specified deformation in an assembly, which must not automatically be filled with rigid grout.
Waterproof-system continuity
The required connected protection through membranes, penetrations and junctions, which is not established solely by the presence of neat surface grout.
Substrate preparation
Appropriate treatment of the actual support’s condition, stability and surface before installation, rather than assuming an adhesive will repair every underlying defect.
Thermal resistance
A defined opposition to heat flow in the supplied model, calculated from thickness and conductivity for an appropriate homogeneous layer.
Thermal bridge
A localized pathway of different heat transfer at a junction or material interruption, requiring actual geometry and assembly assessment.
Load path
The route by which actions are transmitted through members, connections and supports to the ground under the actual design conditions.
Moisture-control layer
A specified part of a building assembly managing a relevant moisture route, whose continuity and connections matter beyond the visible finish.
Airtightness
Resistance to unintended air leakage through the relevant enclosure, distinct from deliberately provided suitable ventilation for the building’s actual needs.
Material compatibility
The suitability of interacting materials under the intended load, moisture, movement and exposure conditions, not simply similarity of appearance.
Controlled revision
The approved version of technical information for the actual task, preventing different workers from following incompatible dimensions, details or instructions.
Datum
A stated reference used to relate dimensions and locations consistently, rather than an arbitrary convenient edge selected independently for each part.
Written dimension
The specified physical size or relationship stated on a drawing, distinct from measuring a potentially rescaled printed image with a ruler.
System boundary
The chosen extent of a model or task that determines which inputs, outputs, forces and responsibilities are included in the reasoning.
Measurement uncertainty
A characterization of the possible dispersion associated with a measurement result, distinct from the instrument’s smallest display increment.
Acceptance criterion
A defined requirement used to judge appropriate evidence, which must not be replaced by an attractive appearance or an undocumented expectation.
Hold point
A defined stage requiring appropriate verification or approval before work proceeds and makes the relevant feature difficult or impossible to inspect.
Change control
An accountable process for assessing and approving a departure from specified information, rather than silently substituting a convenient product or method.
Temporary stability
The needed resistance to instability during an intermediate construction stage, which cannot be assumed from the completed structure’s final load path.
Task-specific control
A protective measure selected for the actual hazard, equipment, conditions and competence, rather than a universal glove, distance or generic PPE instruction.
Net quantity
The amount calculated for the defined work before separately specified allowances, which must use consistent dimensions and measurement conventions.
Handover evidence
Relevant records, observations, accepted conditions and unresolved issues communicated to the responsible recipient at completion, beyond a neat visible surface.