CAP Glacier Fabricant flashcards
CAP Glacier Fabricant · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Payback period
- Initial capital cost divided by annual net cash savings; it shows how long until cumulative savings recover the investment and ignores cash flows after that point.
- Net present value
- Sum of each year's net cash flow discounted at the hurdle rate, minus initial cost; a positive NPV supports proceeding with the automation project.
- OEE
- Overall equipment effectiveness equals availability times performance times quality; each factor is computed from run time, ideal cycle time, count, and good count.
- Verifiable requirement
- A requirement stating a measurable condition, a threshold, and a test method, so acceptance can be demonstrated objectively rather than judged subjectively.
- IEC 61131-3 languages
- The standard defines Ladder Diagram, Function Block Diagram, Structured Text, Instruction List, and Sequential Function Chart for PLC programming, aiding portability and maintainability.
- Control narrative
- A per-loop design document specifying measured variable, setpoint source, output range, failure action, alarm limits, and interlocks; it is the primary artifact programmers implement.
- Factory acceptance test
- A witnessed, scripted test at the vendor's facility with expected results per step; deviations are logged, dispositioned, and retested before shipment.
- Loop check
- Verification of the full path from field device through I/O card and controller to HMI for each tag, including scaling, alarm setpoints, and fail-safe output direction.
- Regression testing
- Re-running affected test cases plus interface cases after a change, with scope defined by change-impact analysis, to confirm nothing previously working was broken.
- Management of change
- A controlled process of request, impact assessment, approval, implementation, retest, and record update that preserves the validated state of the automation system.
- MTBF and MTTR
- Mean time between failures and mean time to repair; availability for a repairable system equals MTBF divided by the sum of MTBF and MTTR.
- Alarm rationalization
- ISA-18.2 practice of reviewing each alarm for cause, consequence, and required response, targeting a manageable steady-state rate near one alarm per ten minutes.
- Safety lifecycle
- IEC 61511 sequence from hazard and risk assessment through safety requirements specification, design, installation, validation, operation, and decommissioning.
- SIL PFDavg bands
- Probability of failure on demand average ranges: SIL 1 is 10⁻¹ to 10⁻², SIL 2 is 10⁻² to 10⁻³, SIL 3 is 10⁻³ to 10⁻⁴, SIL 4 is 10⁻⁴ to 10⁻⁵.
- Zones and conduits
- IEC 62443 concept grouping assets by trust level into zones and restricting traffic between them through defined conduits, isolating control from enterprise networks.
- Fail-safe state
- The de-energized condition of valves and actuators defined as safe; wiring, solenoid selection, and logic must all agree with the stated failure direction.
- Traceability matrix
- A table linking each requirement to its design element, implementation module, and test case; orphan requirements and orphan tests are both treated as defects.
- FAT versus SAT
- Factory acceptance testing occurs at the vendor before shipment; site acceptance testing occurs after installation and verifies the integrated system in its actual environment.
- Punch list categories
- Category A items block acceptance and must close before handover; category B items may close after handover under a dated, owned plan.
- Verification versus validation
- Verification confirms the system was built according to its specification; validation confirms the specified system meets the user's actual requirements.
- ALARP principle
- Risk is reduced as low as reasonably practicable, weighing the cost and difficulty of further reduction against the benefit gained.
- Earned value metrics
- EV equals percent complete times budget; CPI is EV divided by actual cost and SPI is EV divided by planned value, indicating cost and schedule health.
- HAZOP guide words
- Structured hazard study applying no, more, less, reverse, as well as, part of, and other than to design intent to find deviations and their consequences.
- LOPA
- Layer of protection analysis quantifies independent protection layers against a consequence severity target to determine required risk reduction and safety integrity.
- Common-cause failure
- A single shared cause disabling redundant channels simultaneously; diversity, physical separation, and different technologies reduce its probability.
- Diagnostic coverage
- The fraction of dangerous failures detected by built-in diagnostics; higher coverage lowers average probability of failure on demand for a safety function.
- Proof test
- Periodic end-to-end test of a safety instrumented function that reveals undetected dangerous failures; the interval and coverage set the achieved safety integrity.
- Bypass management
- Controlled handling of temporary safety defeats with authorization, logging, time limits, and removal verification before handover or return to normal operation.
- Conflict of interest
- A personal or financial interest that could improperly influence professional judgment; it must be disclosed to the employer or client before decisions are made.
- Whistleblowing
- Escalation to appropriate authorities when internal channels fail and public safety or health is at risk; professional codes permit or require such disclosure.
- PDCA cycle
- Plan-do-check-act structures improvement: define a measurable target, implement, verify results against the target, and standardize or adjust.
- Time synchronization
- Aligning clocks across controllers, servers, and historians using NTP or PTP so that event sequences can be reconstructed accurately during troubleshooting.