- Three lines model
- First line owns and manages risk in the business; second line provides independent oversight, policy, and monitoring; third line, internal audit, gives independent assurance to the governing body.
- Risk appetite versus tolerance
- Risk appetite is the amount and type of risk the organization is willing to pursue to meet objectives; tolerance is the measurable acceptable variation around that appetite.
- Segregation of duties
- A control principle requiring that no single individual can initiate, authorize, record, and reconcile the same transaction, preventing unrecorded or unauthorized activity.
- Tone at the top
- Demonstrated senior and board commitment to integrity and control, evidenced by oversight structures, delegation of authority, and consistent consequences rather than statements alone.
- Compliance function independence
- The compliance head has unrestricted access to the board or a board committee, sets its own agenda, and is not compensated on business revenue targets it monitors.
- Obligation inventory
- A structured register of each regulatory obligation with issuing authority, clause reference, obligation statement, owner, linked controls, required evidence, and review frequency.
- Regulatory change management
- A cycle of horizon scanning, impact assessment, gap analysis, implementation, control update, and validation, with documented closure for each change affecting the organization.
- Extraterritorial reach
- The assertion of jurisdiction over conduct, entities, or data outside a law's home territory; nexus is assessed separately by entity, customer, and data location.
- Legal privilege protection
- Privilege over compliance reviews depends on jurisdiction and can be lost by wide distribution or mixed business advice; scope and recipients must be controlled from the outset.
- Litigation hold
- A directive suspending routine record destruction once litigation or investigation is reasonably anticipated; the retention period becomes the longest of statutory, hold, and contractual requirements.
- Data controller versus processor
- A controller determines purposes and means of processing; a processor acts only on documented controller instructions and carries its own security and breach-notification duties.
- Inherent versus residual risk
- Inherent risk is assessed before controls are applied; residual risk is assessed after existing controls, and target risk is the level intended after planned treatment.
- Risk score formula
- Score equals likelihood rating multiplied by impact rating on a defined scale; scale anchors must be documented so different assessors produce comparable ratings.
- Risk treatment options
- Four options exist: avoid the activity, reduce risk through controls, transfer risk via insurance or contract, or accept risk with documented approval at the proper authority level.
- Risk register minimum fields
- Risk ID, cause-event-impact description, category, owner, inherent rating, linked controls, residual rating, treatment plan, target date, and current status.
- Key risk indicator design
- A leading, measurable metric with defined frequency, thresholds, and escalation triggers that signal rising exposure before the risk event materializes.
- Risk aggregation
- Combining exposures across the organization while accounting for concentration and correlation, since individually acceptable risks can breach appetite through a shared driver.
- COSO five components
- Control environment, risk assessment, control activities, information and communication, and monitoring activities; the 2013 framework maps seventeen principles to these components.
- Key control definition
- A control relied upon to reduce a significant risk to an acceptable level; failure of a key control materially threatens the achievement of related objectives.
- Test design methods
- Inquiry, observation, inspection of evidence, and re-performance; inquiry alone never provides sufficient evidence of operating effectiveness across a period.
- Control deficiency severity
- Severity is judged by the likelihood and magnitude of consequence, considering compensating controls, and determines whether the deficiency is reported to the governing body.
- IT general controls dependency
- Reliance on automated controls requires effective ITGCs over change management, access, and operations; without them, automated control testing results are unsupported.
- Walkthrough versus operating test
- A walkthrough traces one transaction to confirm design understanding and spot gaps; it does not evidence that a control operated effectively throughout the period.
- Remediation validation
- Re-testing the specific failed control attribute over a sufficient post-fix period, rather than merely confirming that a revised procedure was documented.
- Monitoring versus testing
- Monitoring is ongoing, embedded, and owned by the business or second line; testing is periodic, independent, and sample-based; both feed one issue management process.
- Risk-based monitoring plan
- Coverage is allocated by risk rating, prior findings, regulatory change, and time since last review, with documented rationale for areas excluded from the cycle.
- Training effectiveness measurement
- Effectiveness requires completion plus comprehension assessment plus role-specific application evidence; completion rate alone does not demonstrate that behavior changed.
- Third-party due diligence tiers
- Relationships are tiered by risk; higher-risk third parties require enhanced diligence, contractual control commitments, ongoing monitoring, and periodic reassessment.
- Issue management lifecycle
- Identification, logging, risk rating, root cause analysis, action plan with owner and date, tracking, validation of remediation, and formal closure approval.
- Conflict of interest handling
- Conflicts are managed by disclosure, recusal, or structural control; disclosure alone does not neutralize a conflict that impairs objectivity in a decision.
- Insider dealing controls
- Identify inside information, restrict access through information barriers, maintain a restricted list, and pre-clear personal account dealings by in-scope personnel.
- Conduct risk
- The risk that individual or group behavior damages customers, markets, or the firm; it is assessed separately from financial and operational risk.
- Incident severity classification
- Defined criteria such as regulatory reportability, customer impact, financial loss, data volume, and duration determine escalation path and notification timelines.
- Notification clock start
- Regulatory notification periods generally begin when the organization becomes aware of an incident, not when the investigation concludes, with updates following.
- Root cause analysis
- Analysis distinguishing immediate cause, contributing factors, and systemic cause; remediation must address the systemic cause or the incident is likely to recur.
- Post-incident review
- A structured review after resolution that updates the risk register, control library, monitoring plan, and training so the incident produces durable change.