GA General Contractor study plan
GA General Contractor · Give each week a clear focus.
8 weeks · About 7 hours per week
Project Management, Supervision, and Contract Administration
Diagram the project delivery methods (design-bid-build, design-build, CM at risk) and match each to its typical risk allocation and contract type
Sequence the change-order workflow from field discovery through pricing, negotiation, written approval, and cost/schedule incorporation
Write out the lifecycle of a submittal and an RFI, including who originates, reviews, and closes each, and the schedule impact of a late return
Distinguish substantial completion, beneficial occupancy, final completion, and warranty start, and list the punch-list steps between them
Your checkpoint
A 2-page contract administration playbook containing one flowchart per process (change order, submittal, RFI, payment application) plus a 20-term glossary written in your own words
Project Management, Supervision, and Contract Administration & Safety, Building Codes, and Georgia Regulatory Requirements
Build a schedule logic diagram for a small commercial project showing critical path, float, and two activity sequences that would compress the schedule
Reconstruct the monthly pay-application and retainage process, including lien-waiver types exchanged at each step
Sort the OSHA Focus Four hazards into a table of recognition cues, required controls, and the training or documentation each demands
Outline Georgia's contractor licensing categories, the state licensing board's role, and how licensing, permitting, and local inspections intersect on a job
Your checkpoint
A 30-question self-written quiz covering Domain 1 and Domain 12 with an answer key; score at least 80% on a closed-book attempt
Safety, Building Codes, and Georgia Regulatory Requirements & Carpentry, Wood Framing, and Rough Framing
Assemble the permit-to-inspection sequence for a typical commercial build, naming the inspection gate at each phase of work
Summarize Georgia mechanics' lien notice and filing requirements from the statute's plain language, listing each party's deadline relative to the others
Draw the fall-protection, excavation, and scaffold control requirements that most often appear on a site safety plan
Map wood framing members from foundation to ridge, naming the load path and the purpose of each connector in the chain
Calculate stud, joist, rafter, and sheathing quantities from a simple given floor plan using standard spacing
Your checkpoint
A one-page site safety and inspection checklist plus a worked framing takeoff sheet with quantities shown for studs, joists, and sheathing
Carpentry, Wood Framing, and Rough Framing & Concrete and Reinforcing
Explain how framing spacing, blocking, and sheathing orientation control wall and floor stiffness, and identify the three most common field errors in each
Describe the fire-blocking and draft-stopping locations required in concealed wood construction
Sequence formwork, reinforcement placement, and concrete placement for a slab-on-grade and an elevated slab, naming the hold points inspected at each
Match concrete mix parameters (water-cement ratio, air content, slump, admixture) to exposure conditions and finishing needs
Locate reinforcing steel requirements: cover by exposure, lap splice basics, and where chairs and supports are mandatory
Your checkpoint
A one-page framing and concrete inspection card listing hold points, tolerances, and the test or observation required at each, plus a 10-question concrete mix design drill
Concrete and Reinforcing & Sitework, Earthwork, and Site Utilities
Describe curing and protection methods by season and state the consequence of early loading or premature form removal
Walk through a concrete cylinder sampling and testing program: who samples, how often, and what happens when results fall short
Sequence a sitework package from clearing and grubbing through rough grading, utility installation, and finish grading
Match soil classification and compaction testing methods to the fill and subgrade conditions they are appropriate for
Trace a storm and sanitary utility run: pipe bedding, slope, testing, and backfill requirements in order
Your checkpoint
A sitework and concrete quality-control matrix (activity, inspection or test, responsible party, acceptance criterion) covering at least 12 line items
Sitework, Earthwork, and Site Utilities & Finishes (Drywall, Flooring, Painting, and Coatings)
Explain how grading, drainage slope, and subsurface drainage keep water away from the structure, and identify the design elements that most often fail in the field
Compare drywall finishing levels and match each level to the space and finish it serves
Sequence gypsum board installation from framing inspection through taping, finishing, and priming, naming the defects checked at each stage
Classify flooring systems (hard, resilient, carpet, tile) by substrate preparation, moisture testing, and installation tolerance
Translate a coating spec into surface preparation, primer, and coat schedule requirements, and explain how environmental conditions govern application
Your checkpoint
A finishes sequence-and-inspection timeline for one room type, plus a substrate moisture-testing summary sheet for three flooring systems
Masonry & Structural Steel and Metals & Roofing and Waterproofing
Detail masonry wall components - flashing, weep holes, movement joints, anchors - and where each must appear in a cavity wall section
Describe mortar and grout proportioning, and the field conditions that govern masonry placement temperature and protection
Trace structural steel from shop drawing approval through fabrication, erection, bolting/welding, and inspection, naming the inspection at each step
Identify the fireproofing, connection, and tolerance items most frequently cited on steel inspections
Compare low-slope roof systems by membrane type, insulation attachment, and flashing detail, and list the correct application sequence for each
Your checkpoint
Three drawn wall/section sketches (cavity wall, steel connection, roof edge flashing) each annotated with at least six required components and their installation order
Thermal and Moisture Protection & Doors, Windows, and Glazing & Specialties, Equipment, and Furnishings & Project Management, Supervision, and Contract Administration
Sequence the waterproofing, insulation, and air-barrier layers of a building envelope and identify the continuity points where each system most often fails
Explain door and window installation from rough opening through flashing, shimming, and sealant, and state the tests used to verify performance
Match specialty and equipment items to the coordination tasks they create for structure, power, and rough-in
Re-run missed questions from every earlier week's deliverable and convert each into a one-line rule you can recall without notes
Complete a timed 60-question mixed-domain practice set under exam pacing
Your checkpoint
A single-page 'final week' recall sheet of your top 25 self-identified weak points with the correct rule beside each, plus a timed practice score of 75% or better
Milestones
Week 2: Close the book on Domain 1: without notes, draw the change-order workflow and name every party who touches it, then pass your own 30-question quiz at 80%
Week 4: Complete the two heaviest domains (1 and 12) and wood framing: score 80%+ on a self-written 40-question set drawn only from those three domains
Week 6: All 12 domains have at least one revisitable one-page summary; sitework, concrete, and finishes inspection matrices are complete and internally consistent
Week 8: Timed mixed-domain practice at 75% or better, and the 25-item weak-point recall sheet is written and re-tested twice with no repeated misses