- Hierarchy of control
- The order for reducing risk: eliminate the hazard, substitute it, use engineering controls, then administrative controls, and finally PPE as the last line of defence.
- Confined space entry
- Entry into a manhole, tank, or pit requires a permit, atmospheric testing for oxygen and toxic gas, forced ventilation, a standby person, and a retrieval harness.
- Ladder 4:1 rule
- Set a ladder so the base is one metre out for every four metres of height, keep three points of contact, and extend the top about one metre above the landing.
- First-angle projection
- A drawing convention where each view is placed on the far side of the object, so the plan appears below the front elevation.
- Gradient fall formula
- Fall equals length multiplied by gradient. A six-metre run at 1:60 gives a fall of 100 millimetres between its two ends.
- Nominal bore (DN)
- The approximate internal diameter used to designate pipe size. Outside diameter governs fitting choice for plastics such as 20 mm PPR or 110 mm PVC soil.
- Valve selection rule
- Gate or ball valves isolate flow fully, globe valves throttle flow, check valves allow one-way flow, and air admittance valves vent drains.
- Minimum copper bend radius
- Cold-bending copper below about three to four times the outside diameter flattens or kinks the pipe, so use a bender or anneal the copper first.
- Solvent weld sequence
- Cut square, chamfer, clean, apply primer, apply cement to both surfaces, push fully home with a quarter turn, hold thirty seconds, and cure before testing.
- Indirect cold water system
- Mains water fills a storage cistern, which then feeds the cold distribution and the hot water cylinder, giving a reserve when mains supply is interrupted.
- Static head to pressure
- Pressure in bar equals head in metres multiplied by 0.0981. A ten-metre head gives about one bar at the outlet before friction losses.
- Trap seal depth
- A trap should hold a water seal of 50 to 75 millimetres. Less risks evaporation and gassing off; more risks self-siphonage.
- Self-cleansing velocity
- A drain gradient that keeps flow at about 0.7 metres per second, commonly 1:40 to 1:60 for small waste and 1:60 to 1:80 for soil.
- WC pan set-out
- The soil pipe centre is typically 200 to 300 millimetres from the finished wall. Check the pan's own dimension before fitting the connector.
- Appliance trap upstand
- A washing machine or dishwasher hose should discharge into a standpipe with a minimum 600 millimetre upstand, hooked above the trap weir to prevent backflow.
- Compression joint leak
- First tighten the nut a quarter turn. If it still leaks, cut out and remake the joint with a new olive rather than adding more tape.
- Water hammer remedy
- Secure loose pipe clips, fit a shock arrester or check valve, check the pressure-reducing valve setting, and upsize the pipe to reduce velocity.
- Price from margin
- When profit is stated as a margin, price equals cost divided by one minus the margin. A 20 percent margin on 100 cost gives a price of 125.
- Quote versus estimate
- A quotation is a fixed offer to do the work at a stated price. An estimate is approximate and must be labelled as such to avoid disputes.
- Scope of competence
- Work only within the training and registration you hold, and refer work such as gas or electrical connections outside your certificate to a qualified person.
- Written confirmation
- Confirm verbal instructions in a job sheet or message, keep a copy, and record any agreed change with its price and time impact.
- Risk assessment steps
- Identify the hazard, decide who may be harmed and how, rate the risk, record the controls, and review when the work or conditions change.
- Isolation procedure
- Identify the supply, switch off, lock off, attach a tag, then prove dead with a tester checked before and after use.
- Bend developed length
- For a ninety-degree bend, the developed length along the centre line is approximately 1.57 multiplied by the bend radius.
- Thermal expansion
- Expansion equals coefficient times length times temperature rise. uPVC expands about 0.07 millimetres per metre for each degree Celsius.
- Dielectric union
- A fitting placed between dissimilar metals, such as copper and galvanised steel, to break the electrical path and prevent galvanic corrosion.
- Pressure test value
- Test domestic cold pipework at 1.5 times working pressure, commonly 10 bar where rated, and hold it for at least one hour with no drop.
- Drain air test
- Seal the drain section and apply air at about 38 millimetres water gauge for three minutes, or use a water test with a 1.5 metre head.
- Inspection chamber rule
- Fit an inspection chamber at every junction, at every change of direction, and at intervals of about 45 metres on straight drain runs.
- Cistern fill setting
- Set the float valve so water sits about 12 millimetres below the overflow line, and fit a double-check valve or air gap to prevent backflow.
- Relief valve discharge
- A water heater pressure relief valve must discharge to a safe place and must never be capped or plugged, and it should be tested annually.
- Break-even point
- Fixed costs divided by the difference between price per job and variable cost per job gives the number of jobs needed to cover costs.
- Markup versus margin
- A 25 percent markup on cost equals a 20 percent margin on price. State which one the quotation uses so the client can compare.