GISI ADO Level study materials
GISI ADO Level study resources

GISI ADO Level study plan

GISI ADO Level · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Version Control with Git & Continuous Integration

  • Explain the DevOps lifecycle and where version control and CI sit within it, in your own words

  • Create a local repository and demonstrate commit, branch, merge, and rebase workflows from the command line

  • Resolve a deliberate merge conflict and document the resolution steps

  • Write a minimal CI pipeline that triggers on push and runs a lint plus test step

Your checkpoint

A public repository with a branching strategy README, a resolved-conflict commit history, and a working CI config file that passes on the latest commit

Week 2

Continuous Integration & Infrastructure as Code

  • Configure a CI pipeline with build caching, parallel jobs, and artifact publishing

  • Add automated unit and integration test stages with failure gates

  • Write declarative infrastructure code that provisions a network and compute resource

  • Run a plan/preview step and interpret the diff before applying

Your checkpoint

A pipeline that builds, tests, and publishes an artifact, plus an IaC module with a saved plan output and apply log for a throwaway environment

Week 3

Infrastructure as Code & Continuous Delivery and Deployment

  • Manage remote state with locking and separate workspaces or environments

  • Parameterize IaC for dev and staging using variables and environment-specific values

  • Define a delivery pipeline stage that deploys to staging automatically and to production on approval

  • Implement a rollback or redeploy path and test it once

Your checkpoint

Two environment stacks provisioned from one codebase, with a delivery pipeline that gates production behind manual approval and a documented, tested rollback

Week 4

Continuous Delivery and Deployment & Configuration Management and Automation

  • Compare blue-green, canary, and rolling deployment strategies and justify one choice for a sample service

  • Write idempotent configuration management code for a server role

  • Apply configuration to a fresh host and prove a second run reports no changes

  • Integrate the configuration step into the delivery pipeline

Your checkpoint

A configuration role applied twice with an idempotence report showing zero changes on the second run, wired into the deployment pipeline

Week 5

Configuration Management and Automation & Monitoring, Logging, and Observability

  • Refactor duplicated automation into reusable roles or modules with clear interfaces

  • Instrument an application with structured logs and at least three key metrics

  • Build a dashboard showing request rate, error rate, and latency

  • Define one alert with a threshold and a runbook link

Your checkpoint

A dashboard screenshot or exported definition, a sample structured log line, and one alert rule with a short runbook committed to the repo

Week 6

Monitoring, Logging, and Observability & Security and Compliance in DevOps

  • Trace a single request across services using correlation IDs

  • Add secret scanning and dependency vulnerability scanning to the pipeline

  • Store credentials in a secrets manager and remove them from code and config

  • Enforce least-privilege permissions on the pipeline's service identity

Your checkpoint

A pipeline run showing secret and dependency scan results, plus a commit that removes hardcoded credentials and references the secrets manager instead

Week 7

Security and Compliance in DevOps & Introduction to DevOps

  • Add policy-as-code checks that block non-compliant infrastructure changes

  • Document an audit trail from commit to deployed artifact using pipeline metadata

  • Map each of the eight exam domains to your own notes and flag weak areas

  • Re-explain the DevOps culture and feedback-loop concepts using your project as evidence

Your checkpoint

A policy check that fails an intentionally non-compliant change, plus a one-page domain-to-evidence map with weak areas marked

Week 8

Introduction to DevOps & Version Control with Git & Continuous Integration & Continuous Delivery and Deployment & Infrastructure as Code & Configuration Management and Automation & Monitoring, Logging, and Observability & Security and Compliance in DevOps

  • Review flagged weak domains and rewrite your summaries from memory

  • Walk through the full pipeline end to end and explain each stage aloud

  • Complete timed practice sets weighted toward version control, CI, CD, and IaC

  • List every missed question by domain and close each gap with a targeted note

Your checkpoint

A final gap-closure log listing each missed item, its domain, and the correction, with all items marked resolved

Milestones

Week 2: You can create a branch, resolve a conflict, and get a green CI run without consulting notes

Week 4: One codebase provisions two environments and deploys to staging automatically with a tested rollback

Week 6: A request can be traced end to end, and the pipeline blocks on secret and dependency scan failures

Week 8: Timed practice scores are stable across all eight domains, with no domain below your target threshold