Quick reference

Marine Engineering Watchkeeping and Safe Operation of Machinery

  • A UMS (unattended machinery space) watch alarm sequence normally escalates: dead-man alarm at the console first, then engineer's call alarm, then bridge alarm if unanswered within the preset delay.

  • Watch handover is complete only when the relieving engineer has physically verified running machinery parameters (pressures, temperatures, levels), not merely read the logbook.

  • The engine room watch must record: time, sea state, machinery running status, fuel/LO/water consumptions, and any abnormal conditions, at intervals not exceeding the period set by the Chief Engineer.

  • Standby engine status requires: main engine ready to manoeuvre, steering gear tested (including second pump / alternative power), and bridge informed of readiness.

  • Critical alarm setpoints must never be altered without Chief Engineer authorization; changes are logged with reason, date, and signature.

  • Bunkering operations require continuous watch at the manifold, agreed communication with the barge, scuppers plugged, and a pre-transfer checklist signed by both sides.

  • A dead-man alarm is normally reset every 3-15 minutes depending on the vessel's UMS classification; missing two consecutive resets escalates to the engineer's cabin alarm.

  • Before any machinery is opened for maintenance, isolation must include: energy source lockout/tagout, zero pressure verification, and draining/flushing of residual fluids.

Quick reference

Marine Propulsion Systems: Diesel Engines, Steam and Gas Turbines

  • Mean indicated pressure (mip) is calculated from the indicator diagram: mip = area of diagram / length of diagram, expressed in bar; it represents the average pressure acting on the piston during one cycle.

  • Indicated power for a single-acting engine: IHP = (mip × L × A × N × n) / 60, where L is stroke in m, A is piston area in m², N is rpm, n is number of cylinders (for two-stroke; for four-stroke divide by 2).

  • Brake power = indicated power × mechanical efficiency; specific fuel consumption (sfc) is normally quoted in g/kWh on a brake-power basis.

  • Turbocharger surging is typically caused by: fouled turbine/compressor, exhaust gas bypass valve fault, rapid load change, or air cooler restriction; corrective action is to reduce load and investigate.

  • For a steam turbine, the pressure-enthalpy (Mollier) diagram is used to determine work output; isentropic efficiency = actual enthalpy drop / isentropic enthalpy drop.

  • Gas turbine efficiency is improved by regeneration (exhaust heat recovery to combustion air) and intercooling; the Brayton cycle efficiency depends on pressure ratio.

  • Cylinder liner wear rate is normally monitored by measuring liner diameter at defined positions (top, middle, bottom) at each piston overhaul and comparing to the manufacturer's limits.

  • A two-stroke slow-speed diesel engine scavenges via uniflow ports and an exhaust valve; scavenge air pressure is a key indicator of turbocharger and scavenge port condition.

  • Fuel injection timing advanced too far causes high peak pressure and knocking; retarded timing causes high exhaust temperature and smoking.

Quick reference

Auxiliary Machinery and Shipboard Systems (Pumps, Compressors, Boilers, Steering Gear, HVAC)

  • Centrifugal pump affinity laws: flow ∝ speed, head ∝ speed², power ∝ speed³; these govern impeller trimming and VFD speed control.

  • NPSH available = (pressure at pump suction in head) − vapour pressure head of the liquid; cavitation occurs when NPSH available falls below NPSH required.

  • Positive displacement pumps (screw, gear, piston) are self-priming and deliver near-constant flow regardless of discharge pressure; a relief valve must be fitted on the discharge.

  • Reciprocating air compressor intercooling reduces air temperature and improves volumetric efficiency; the intercooler drain must be blown down regularly to prevent water carry-over.

  • A boiler safety valve must be set to lift at or below the design pressure; the boiler must never be fired with the safety valve gagged.

  • Steering gear testing before departure (SOLAS V/26) includes: full rudder movement from hard-over to hard-over, both pumps, both power supplies, and the emergency steering drill within 12 hours before departure.

  • HVAC relative humidity should be maintained typically at 40-60% for crew comfort and to prevent condensation on cold surfaces; chilled water supply temperature is normally 7-12°C.

  • Boiler water treatment controls: phosphate for scale prevention, hydrazine or sulphite for oxygen scavenging, and regular blowdown to control dissolved solids (TDS).

  • A centrifugal pump loses suction when the discharge valve is closed too long; running against a closed discharge causes overheating and possible seizure.

Quick reference

Electrical, Electronic and Control Engineering; Automation and Instrumentation

  • Ohm's law: V = I × R; power in a DC circuit: P = V × I = I²R = V²/R; for three-phase AC: P = √3 × V × I × cos φ.

  • A 4-20 mA current loop is standard for process instrumentation: 4 mA represents the zero/live-zero value, 20 mA the full-scale value; a 0 mA reading indicates a broken loop.

  • Insulation resistance is measured with a megohmmeter at 500 V DC for LV circuits; minimum acceptable values are typically ≥1 MΩ for motors and ≥1 MΩ for cables (per class rules).

  • A PID controller's proportional band (PB) is the % error that produces 100% output change; PB = 100 / gain. Integral action removes offset; derivative action anticipates change.

  • A PLC scan cycle consists of input scan, program execution, and output update; scan time must be shorter than the fastest process response required.

  • Battery charging: lead-acid cells are charged at 2.4 V/cell boost and 2.25 V/cell float at 25°C; temperature compensation is required.

  • A synchroscope shows the phase difference between the incoming generator and the busbar; the breaker is closed when the pointer is at 12 o'clock (in phase) and the frequency is slightly higher than the busbar.

  • A three-phase motor reverses direction by swapping any two of the three supply phases; a star-delta starter reduces starting current to about one-third of the direct-on-line value.

  • A short circuit in a circuit breaker is cleared by the instantaneous trip element; overload protection uses the thermal or long-time element.

Quick reference

Maintenance and Repair, Materials and Workshop Practice

  • A micrometer reading = main scale + thimble scale × least count; for a 0-25 mm metric micrometer, the least count is 0.01 mm.

  • Vernier caliper least count = smallest main scale division / number of vernier divisions; typically 0.02 mm.

  • Carbon steel contains up to about 2% carbon; above this it is cast iron. Increasing carbon raises hardness and tensile strength but reduces ductility and weldability.

  • Stainless steel grades 304 and 316 are austenitic; 316 contains molybdenum for improved chloride/pitting resistance in marine environments.

  • Sacrificial anodes (zinc or aluminium alloys) protect steel by cathodic protection; they must be replaced when about 50% consumed or per class rules.

  • A torque wrench must be calibrated at intervals (typically annually) and stored at its lowest setting to avoid spring fatigue.

  • Feeler gauges measure clearance; plastigauge measures bearing clearance by deformation of a plastic strip.

  • A bearing running temperature above about 70-80°C (depending on type) indicates inadequate lubrication, misalignment, or overload and must be investigated.

  • Welding symbols: fillet weld is shown as a triangle; a butt weld is shown by a V or U groove symbol; the arrow side is drawn below the reference line.

Quick reference

Ship Construction, Stability and Damage Control for Engineers

  • Transverse metacentric height GM = KM − KG; positive GM gives stable equilibrium; negative GM causes the vessel to list to one side and can lead to capsize.

  • Free surface effect reduces effective GM: FSC = (i × ρ) / (Δ), where i is the second moment of area of the free surface, ρ is liquid density, Δ is displacement.

  • Righting lever GZ = GM × sin θ (for small angles); the area under the GZ curve up to 30° must be at least 0.055 m·rad (IMO intact stability criterion).

  • Bulkhead watertight doors must be operable from both sides and the bridge; remote release is tested at intervals per SOLAS II-1.

  • Damage stability: flooding of a compartment reduces GM and increases draft; cross-flooding arrangements reduce list but increase trim.

  • A collision bulkhead must be located at least 0.05L (or 10 m, whichever is less) from the forward perpendicular, and not more than 0.08L (or 0.05L + 3 m).

  • The load line (Plimsoll) marks: S, W, T, F, and their tropical/freshwater variants; the summer freeboard is the reference.

  • A ship's stability booklet contains hydrostatic curves, KN or cross curves, and tank capacity tables; the engineer must know where it is kept and how to use it in an emergency.

Quick reference

Maritime Legislation, STCW, MARPOL, SOLAS and Survey/Certification

  • STCW 2010 requires a minimum of 12 months seagoing service for certification as Officer in Charge of an Engineering Watch, plus approved education and training.

  • MARPOL Annex I covers oil pollution; Annex II noxious liquid substances; Annex III harmful substances in packaged form; Annex IV sewage; Annex V garbage; Annex VI air pollution.

  • MARPOL Annex VI sulphur limits: 0.50% m/m globally from 1 January 2020; 0.10% m/m in ECAs.

  • The Oil Record Book Part I is used for machinery space operations; entries must be signed by the officer in charge and each page by the Master.

  • ISM Code requires a Safety Management System (SMS) with documented procedures, a designated person ashore, and internal audits at intervals not exceeding 12 months.

  • SOLAS Chapter II-1 covers subdivision and stability; Chapter II-2 fire protection; Chapter III life-saving appliances; Chapter IV radio; Chapter V safety of navigation.

  • Class surveys include annual, intermediate, special (every 5 years), and continuous surveys; the Certificate of Class is issued on satisfactory completion of the special survey.

  • The Continuous Synopsis Record (CSR) records the ship's history of ownership, flag, and management; it must be kept on board and updated when changes occur.

Quick reference

Health, Safety, Environmental Protection and Emergency Procedures

  • Enclosed space entry requires: a permit, atmosphere testing (O₂ 20.9%, LEL <1%, H₂S <5 ppm, CO <5 ppm), continuous ventilation, a standby person at the entrance, and rescue equipment at the ready.

  • The fire triangle requires fuel, oxygen, and heat; removing any one extinguishes the fire. CO₂ displaces oxygen; foam blankets the fuel; dry powder interrupts the chain reaction.

  • The emergency fire pump must be capable of delivering at least two jets of water; it is located outside the machinery space and tested monthly.

  • The muster list must be displayed in each crew area and at the muster stations; it must be updated whenever there is a change in crew.

  • Abandon ship: the order is given by the Master only; the crew proceeds to the muster station with lifejackets, and the lifeboat is launched under the coxswain's direction.

  • Oil spill response: stop the source, contain with booms, use absorbents, and report to the port state and flag state; the SOPEP/SMPEP must be activated.

  • Personal protective equipment for engine room work includes: safety helmet, safety shoes, eye protection, hearing protection in high-noise areas, and gloves appropriate to the task.

  • First aid for electric shock: isolate the supply, then assess breathing and circulation; commence CPR if trained and the casualty is unresponsive and not breathing.

Quick reference

Engineering Watch Administration, Records, Communication and Human Element

  • The engine room logbook records: date, time, position, course, speed, machinery parameters, fuel and water consumptions, and any incidents; it is a legal document and must be preserved.

  • The Chief Engineer's standing orders define watchkeeping arrangements, alarm responses, and reporting requirements; they must be read and signed by each engineer.

  • Effective communication uses closed-loop confirmation: the receiver repeats the message back to the sender to confirm understanding.

  • Fatigue management: STCW requires minimum rest periods of 10 hours in any 24-hour period and 77 hours in any 7-day period; rest records must be maintained.

  • The human element (HE) in accidents is addressed by the ISM Code and the STCW Convention; root cause analysis typically identifies organizational, supervisory, and individual factors.

  • Toolbox talks before a job brief the hazards, controls, and emergency arrangements; attendance is recorded.

  • Permit-to-work systems are required for hot work, enclosed space entry, working aloft, and electrical isolation; the permit is signed by the authorizing officer.

  • Near-miss reporting is a leading indicator of safety performance; reports are reviewed at safety committee meetings and used to update the SMS.