GPS Aptitude Test study materials
GPS Aptitude Test study resources

The Conference Room Booking

GPS Aptitude Test · Put your knowledge to work in context.

All case studies

The Conference Room Booking

A company has three conference rooms: Room X, Room Y, and Room Z. Room X can hold 10 people, Room Y 8 people, and Room Z 6 people. There are four meetings scheduled for tomorrow: Meeting A needs 9 people, Meeting B needs 7 people, Meeting C needs 5 people, and Meeting D needs 4 people. Each meeting requires a room that can accommodate its attendees. Meetings cannot share a room, and each room can host only one meeting at a time. The meetings are at different times: A at 9am, B at 10am, C at 11am, and D at 12pm. However, the rooms have the following constraints: Room X is unavailable from 9am to 10:30am due to maintenance. Room Y is available all day. Room Z has a projector that Meeting C requires, but the projector is broken and will be fixed by 10:30am. Meeting C must have the projector. Determine if all meetings can be scheduled in the available rooms at their specified times, and if not, what changes can be made.

1. List the room capacities and the meeting requirements, and identify which rooms can accommodate which meetings based on capacity alone.

Read the worked answer

Room capacities: X=10, Y=8, Z=6. Meeting requirements: A=9, B=7, C=5, D=4. Capacity compatibility:

  • Meeting A (9) can only fit in Room X (10) because Y=8 and Z=6 are too small.
  • Meeting B (7) can fit in Room X (10) or Room Y (8). Not Z (6).
  • Meeting C (5) can fit in any room: X, Y, or Z (all >=5).
  • Meeting D (4) can fit in any room. So based on capacity alone, A must be in X, B in X or Y, C and D anywhere.

2. Considering the time constraints and room availability, determine if all meetings can be scheduled as originally planned. If not, propose a valid schedule that satisfies all constraints, or explain why it's impossible.

Read the worked answer

Original times: A at 9am, B at 10am, C at 11am, D at 12pm. Room X unavailable 9-10:30am. So at 9am, Room X cannot be used. Meeting A requires Room X (only room with capacity >=9). Therefore, Meeting A cannot be scheduled at 9am because its only possible room is unavailable. Thus, the original plan is impossible. We need to reschedule. Options: Move Meeting A to a time when Room X is available, or change rooms? But no other room can hold 9 people. So Meeting A must be in Room X, and Room X is only available after 10:30am. So Meeting A must be scheduled at or after 10:30am. But Meeting A is at 9am; we could move it to 10:30am or later. However, other meetings are at 10am, 11am, 12pm. We need to avoid conflicts. Let's try to reschedule all meetings within the day, respecting room capacities and availability, and the projector for C. Room Z projector fixed by 10:30am, so Meeting C (which requires projector) must be in Room Z and at or after 10:30am. Meeting C is at 11am, which is after 10:30, so that's fine if Room Z is used. Now, we need to assign rooms and times. Possible approach: Keep B at 10am, C at 11am, D at 12pm, and move A to 10:30am? But Room X is available from 10:30am. However, at 10:30, Room X is free, but Meeting B is at 10am in either X or Y. If B uses Y, then X is free at 10:30 for A. But A at 10:30 would overlap with B? B is at 10am, likely ends before 10:30? Meetings are at different times, but we don't know durations. The problem doesn't specify durations, so we assume meetings are instantaneous or non-overlapping? Typically, meetings have durations, but not given. We need to make assumptions. Since not specified, we can assume each meeting takes less than an hour and rooms are freed after. But to be safe, we should schedule A at a time when Room X is free and no other meeting needs it. Since B at 10am could be in Y, X is free at 10:30. So schedule A at 10:30am in Room X. Then B at 10am in Room Y (capacity 8, fits 7). C at 11am in Room Z (projector fixed). D at 12pm in any room, say Room X or Y or Z. But check Room Z: C uses Z at 11am, D at 12pm could use Z if C is done. So schedule: A at 10:30am in X, B at 10am in Y, C at 11am in Z, D at 12pm in X (or Y). This satisfies all capacity and availability constraints. However, we must ensure that Room X is not double-booked: A at 10:30 in X, and D at 12pm in X is fine if A ends before 12pm. Assuming meetings are short, it's okay. Alternatively, put D in Y or Z. So a valid schedule exists: move A to 10:30am, keep others as is, assign B to Y, C to Z, D to X or Y. Thus, the original plan is not feasible, but a modified schedule is.