Google Project Management · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Foundations of Project Management

  • Define project, program, and portfolio, and classify 10 sample initiatives into the correct category

  • Describe each phase of the project life cycle and the deliverables produced at each gate

  • Explain the triple constraint and predict how a change in one constraint affects the other two

  • Identify the project manager's core responsibilities and distinguish them from the roles of sponsor, team member, and stakeholder

  • Compare functional, matrix, and projectized organizational structures and state the PM's authority level in each

Your checkpoint

A two-page concept map linking at least 25 foundations terms, each with a one-sentence definition and a concrete example

Week 2

Project Initiation: Starting a Successful Project

  • Draft a complete project charter covering goal, scope, success criteria, deliverables, budget, and schedule for a self-chosen practice project

  • Perform a stakeholder analysis and plot at least 8 stakeholders on a power-versus-interest grid with a tailored engagement strategy for each quadrant

  • Separate in-scope from out-of-scope items and write three explicit scope exclusions

  • Define 3-5 measurable SMART success criteria that a reviewer could objectively verify

Your checkpoint

A finished practice-project charter plus a stakeholder register with 8+ entries and assigned engagement actions

Week 3

Project Planning: Putting It All Together

  • Decompose the approved scope into a work breakdown structure with at least 20 work packages and clear completion criteria

  • Estimate task durations and costs using three different techniques (analogous, bottom-up, three-point) and note when each is appropriate

  • Sequence activities into a network diagram and calculate the critical path, total float, and slack for every path

  • Build a RACI chart for the WBS and flag any task with zero or multiple accountable owners

Your checkpoint

A WBS, network diagram, and critical-path calculation with the float for each path explicitly labeled

Week 4

Project Planning: Putting It All Together & Project Execution: Running the Project

  • Create a risk register with 10 risks scored on probability and impact, each with a mitigation, owner, and contingency

  • Define quality standards and a communication plan specifying audience, channel, frequency, and owner

  • Build the project schedule in a digital tool (e.g., Asana, Trello, or Sheets) with dependencies and owners

  • Work through 30 scenario-style planning questions and write a correction note for every miss

Your checkpoint

A risk register with 10 scored risks and mitigations plus a loaded digital schedule ready for execution tracking

Week 5

Project Execution: Running the Project

  • Explain the stages of team development and match each stage to two concrete management actions

  • Draft a weekly status report template that surfaces progress, blockers, and budget burn

  • Trace a change through a formal change-control process from request to approval or rejection, and document its schedule and budget impact

  • Distinguish quality assurance from quality control and give two activities that belong to each

  • Outline an escalation path and specify the trigger conditions for using it

Your checkpoint

A simulated status report for the practice project plus a change-request log containing at least 3 fully processed requests

Week 6

Agile Project Management

  • Compare Agile and Waterfall delivery and justify a method choice for 5 different project scenarios

  • Write 15 user stories in the 'as a... I want... so that...' format, each with testable acceptance criteria

  • Build a prioritized product backlog and estimate items using story points and relative sizing

  • Describe Scrum roles, events, and artifacts, and explain how Kanban differs in flow and work-in-progress limits

  • Explain how Agile handles scope, risk, and value delivery differently from predictive planning

Your checkpoint

A prioritized backlog of 15 user stories with acceptance criteria and story-point estimates, plus a one-page comparison sheet of Agile versus Waterfall

Week 7

Capstone: Applying Project Management in the Real World

  • Assemble an end-to-end project package from charter through closure for a realistic scenario, reusing artifacts from earlier weeks

  • Tailor the delivery approach to a scenario with fixed constraints and justify each tailoring decision

  • Identify which artifacts and metrics a PM should present at each life-cycle phase

  • Complete a timed 50-question mixed practice test and tag each missed item to its domain

Your checkpoint

A complete capstone-style project package (charter, plan, risk register, execution reports, closure summary) plus a scored 50-question practice test with a tagged error log

Week 8

Project Planning: Putting It All Together & Project Execution: Running the Project & Agile Project Management & Capstone: Applying Project Management in the Real World

  • Retake practice tests under timed conditions and score at least 80% on each

  • Re-teach the two weakest domains from the error logs by rewriting the missed concepts in your own words

  • Drill terminology and process sequences using spaced-repetition flashcards for 15 minutes daily

  • Simulate full exam conditions twice, including pacing and review of flagged questions

Your checkpoint

Two full-length timed practice exams scored at 80% or above, with a remediation log showing every missed item corrected

Milestones

Week 2: Foundations and initiation complete: can explain the project life cycle, organizational structures, and charter components without notes, and produced a charter plus stakeholder register

Week 4: Planning complete: can build a WBS, compute a critical path with float, and score risks on probability and impact; risk register and digital schedule done

Week 6: Execution and Agile complete: can describe Tuckman stages, change control, and Scrum artifacts on demand; backlog of 15 stories and status report finished

Week 8: Capstone and review complete: full project package assembled and two timed full-length practice exams scored at 80% or higher