Foundations of Project Management
Define project, program, and portfolio, and classify 10 sample initiatives into the correct category
Describe each phase of the project life cycle and the deliverables produced at each gate
Explain the triple constraint and predict how a change in one constraint affects the other two
Identify the project manager's core responsibilities and distinguish them from the roles of sponsor, team member, and stakeholder
Compare functional, matrix, and projectized organizational structures and state the PM's authority level in each
Your checkpoint
A two-page concept map linking at least 25 foundations terms, each with a one-sentence definition and a concrete example
Project Initiation: Starting a Successful Project
Draft a complete project charter covering goal, scope, success criteria, deliverables, budget, and schedule for a self-chosen practice project
Perform a stakeholder analysis and plot at least 8 stakeholders on a power-versus-interest grid with a tailored engagement strategy for each quadrant
Separate in-scope from out-of-scope items and write three explicit scope exclusions
Define 3-5 measurable SMART success criteria that a reviewer could objectively verify
Your checkpoint
A finished practice-project charter plus a stakeholder register with 8+ entries and assigned engagement actions
Project Planning: Putting It All Together
Decompose the approved scope into a work breakdown structure with at least 20 work packages and clear completion criteria
Estimate task durations and costs using three different techniques (analogous, bottom-up, three-point) and note when each is appropriate
Sequence activities into a network diagram and calculate the critical path, total float, and slack for every path
Build a RACI chart for the WBS and flag any task with zero or multiple accountable owners
Your checkpoint
A WBS, network diagram, and critical-path calculation with the float for each path explicitly labeled
Project Planning: Putting It All Together & Project Execution: Running the Project
Create a risk register with 10 risks scored on probability and impact, each with a mitigation, owner, and contingency
Define quality standards and a communication plan specifying audience, channel, frequency, and owner
Build the project schedule in a digital tool (e.g., Asana, Trello, or Sheets) with dependencies and owners
Work through 30 scenario-style planning questions and write a correction note for every miss
Your checkpoint
A risk register with 10 scored risks and mitigations plus a loaded digital schedule ready for execution tracking
Project Execution: Running the Project
Explain the stages of team development and match each stage to two concrete management actions
Draft a weekly status report template that surfaces progress, blockers, and budget burn
Trace a change through a formal change-control process from request to approval or rejection, and document its schedule and budget impact
Distinguish quality assurance from quality control and give two activities that belong to each
Outline an escalation path and specify the trigger conditions for using it
Your checkpoint
A simulated status report for the practice project plus a change-request log containing at least 3 fully processed requests
Agile Project Management
Compare Agile and Waterfall delivery and justify a method choice for 5 different project scenarios
Write 15 user stories in the 'as a... I want... so that...' format, each with testable acceptance criteria
Build a prioritized product backlog and estimate items using story points and relative sizing
Describe Scrum roles, events, and artifacts, and explain how Kanban differs in flow and work-in-progress limits
Explain how Agile handles scope, risk, and value delivery differently from predictive planning
Your checkpoint
A prioritized backlog of 15 user stories with acceptance criteria and story-point estimates, plus a one-page comparison sheet of Agile versus Waterfall
Capstone: Applying Project Management in the Real World
Assemble an end-to-end project package from charter through closure for a realistic scenario, reusing artifacts from earlier weeks
Tailor the delivery approach to a scenario with fixed constraints and justify each tailoring decision
Identify which artifacts and metrics a PM should present at each life-cycle phase
Complete a timed 50-question mixed practice test and tag each missed item to its domain
Your checkpoint
A complete capstone-style project package (charter, plan, risk register, execution reports, closure summary) plus a scored 50-question practice test with a tagged error log
Project Planning: Putting It All Together & Project Execution: Running the Project & Agile Project Management & Capstone: Applying Project Management in the Real World
Retake practice tests under timed conditions and score at least 80% on each
Re-teach the two weakest domains from the error logs by rewriting the missed concepts in your own words
Drill terminology and process sequences using spaced-repetition flashcards for 15 minutes daily
Simulate full exam conditions twice, including pacing and review of flagged questions
Your checkpoint
Two full-length timed practice exams scored at 80% or above, with a remediation log showing every missed item corrected
Milestones
Week 2: Foundations and initiation complete: can explain the project life cycle, organizational structures, and charter components without notes, and produced a charter plus stakeholder register
Week 4: Planning complete: can build a WBS, compute a critical path with float, and score risks on probability and impact; risk register and digital schedule done
Week 6: Execution and Agile complete: can describe Tuckman stages, change control, and Scrum artifacts on demand; backlog of 15 stories and status report finished
Week 8: Capstone and review complete: full project package assembled and two timed full-length practice exams scored at 80% or higher