The Magnehelic Says Negative, So Keep Working

HI Asbestos Abatement · Put your knowledge to work in context.

All case studies

The Magnehelic Says Negative, So Keep Working

A 1,200 sq ft office suite on the sixth floor of a Honolulu tower is under containment for removal of 80 linear feet of friable pipe insulation. The suite has a 9-foot ceiling. Two 2,000-cfm HEPA negative air machines exhaust through a window; a magnehelic gauge reads -0.005 in. w.c. A smoke pencil at the decon entrance shows air moving into the containment, but at a floor seam the smoke is pulled out. A patch of 6-mil poly on the far wall is torn. Building HVAC serving the floor is still operating. A worker leaves the dirty room, walks through the shower room without showering, passes through the clean room, and takes the elevator to the lobby to retrieve a tool. The project manager says the gauge is 'negative, so we are fine' and plans to continue until the shift ends.

1. Assess the containment and engineering controls. What immediate actions are required?

Read the worked answer

The containment is not functioning. A reading of -0.005 in. w.c. is about 1.2 Pa, well below the commonly used target of -0.02 in. w.c. (about 5 Pa) for a negative-pressure enclosure; it is barely negative and not stable. The smoke pencil confirms the problem: air enters at the decon entrance but is pulled outward at a floor seam, meaning the enclosure is leaking and the pressure gradient is not reliably inward. The torn poly patch is an uncontrolled opening, and the building HVAC is still operating, which can pressurize the suite and reverse airflow.

Immediate actions: stop abatement work, keep workers out of the contaminated area, shut down or isolate the HVAC serving the suite, seal the tear and the floor seam with poly and tape, check all critical barriers, add or rebalance HEPA negative air machines, and re-verify with a smoke pencil and a calibrated magnehelic gauge before anyone re-enters. Do not accept the gauge is negative as proof. The area outside the containment, including the corridor and elevator lobby, should be visually inspected and air sampled if contamination is suspected.

2. Evaluate the worker's exit and the decontamination sequence. What should happen next?

Read the worked answer

The worker's exit was a serious breach. The decontamination sequence must run from dirty to clean: equipment room, dirty room, shower, clean room. A worker may not pass from the dirty room through the shower without showering, and may not enter the clean room in contaminated clothing. The worker should be stopped, his disposable coveralls bagged as asbestos waste, and he should shower and change before leaving. The clean room and the path to the elevator should be treated as potentially contaminated until wiped and, if necessary, sampled. The elevator and lobby may need HEPA vacuuming and wet wiping. The worker should be included in exposure monitoring and offered medical evaluation; the supervisor should document the breach and retrain the crew.

3. Is -0.005 in. w.c. adequate? Calculate airflow needs and describe how to verify the system.

Read the worked answer

No. The suite volume is 1,200 sq ft × 9 ft = 10,800 cubic feet. At four air changes per hour, the required flow is 10,800 × 4 = 43,200 cubic feet per hour, or 720 cfm. Two 2,000-cfm machines have more than enough nominal capacity, but capacity is not the same as pressure control. The actual negative pressure depends on the balance between exhaust and makeup air, leakage, and HVAC operation; a large machine can still leave a suite at -0.005 in. w.c. if supply air or open leaks offset it. Verify with a calibrated magnehelic gauge or manometer, a smoke pencil at seams and decon openings, and an anemometer at the HEPA exhaust. Exhaust should discharge outdoors away from air intakes and occupied windows. Record the readings at the start of each shift and periodically.