32 cards. Read the term and the definition here. The deck at the top of this page is optional.

RACM definition
Regulated asbestos-containing material: material with more than 1% asbestos that is friable, will be crumbled or pulverized by handling, or has been sanded, ground, cut, or abraded.
OSHA PEL for asbestos
The permissible exposure limit is 0.1 fibers per cubic centimeter as an 8-hour time-weighted average, with an excursion limit of 1.0 f/cc averaged over 30 minutes.
Class I asbestos work
Removal of thermal system insulation or surfacing ACM, the highest-risk class of abatement work, requiring the most stringent controls and training.
Mesothelioma latency
Mesothelioma, a cancer of the lung lining caused by asbestos, typically develops 10 to 40 years after exposure, which is why historical exposures still cause disease today.
Friable ACM
Asbestos-containing material that can be crumbled, pulverized, or reduced to powder by hand pressure when dry, making it more likely to release fibers.
Homogeneous area
Material of uniform color and texture applied at the same time; sampling requires at least three samples per homogeneous area for surfacing and thermal system insulation.
PLM analysis
Polarized light microscopy with dispersion staining is the standard bulk-sample method for identifying asbestos type and estimating percentage in building materials.
Presumed ACM
Material assumed to contain asbestos until bulk sampling and laboratory analysis show 1% or less, used when sampling is impractical or the material is inaccessible.
NESHAP notification
Written notice to the state at least 10 working days before demolition or a renovation that will disturb regulated asbestos-containing material, including project details and quantities.
Half-mask APR limit
A half-mask air-purifying respirator with HEPA filters may be used only up to 10 times the permissible exposure limit; full-face and PAPR units allow higher protection factors.
Fit test requirement
Tight-fitting respirators require an annual fit test, a medical evaluation, and a user seal check each time the respirator is donned.
Class I training hours
Workers performing Class I or Class II abatement need 32 hours of initial training plus an 8-hour annual refresher; Class III and IV need 16 hours initial.
Medical surveillance trigger
Medical surveillance is required for employees exposed above the permissible exposure limit for 30 or more days per year, including chest X-ray and spirometry.
Amended water
Water mixed with a surfactant that wets asbestos fibers more effectively, used to suppress fiber release during removal and handling.
Removal sequence
Remove ACM from the top down in wetted sections, wrap thermal insulation before cutting, and bag debris as generated rather than dropping or throwing it.
Floor tile removal
Remove resilient floor tile using wet methods or heat or chemical softening; never dry-cut, dry-chip, or grind tile or mastic.
Negative air machine
A HEPA-filtered exhaust unit that keeps containment under negative pressure relative to adjacent spaces, typically providing at least four air changes per hour.
Critical barrier
A seal over openings such as windows, doors, and vents, usually two layers of 6-mil plastic, that prevents fiber migration out of the work area.
Three-stage decon
A clean room, shower, and dirty room arranged so workers move clean-to-dirty on entry and dirty-to-clean on exit, showering before leaving.
HEPA filter efficiency
A high-efficiency particulate air filter removes 99.97% of particles 0.3 microns and larger, and is required on vacuums and negative air units used in abatement.
Waste labeling
Asbestos waste containers must be sealed, leak-tight, and labeled with the required asbestos warning and the generator's name and location.
Waste manifest
The shipping document that tracks asbestos waste from generator to permitted landfill; copies must be retained as project records.
Landfill daily cover
Asbestos waste at a disposal site must be covered with soil or other cover at the end of each operating day and recorded in the site record.
No visible emissions
NESHAP requires that regulated asbestos waste be kept wet and handled so that no visible dust emissions occur during handling, transport, or disposal.
PCM fiber counting
Phase contrast microscopy counts fibers in air samples but cannot identify asbestos type; transmission electron microscopy is used for confirmation.
Clearance criterion
After final cleaning and before containment removal, airborne fiber levels must fall below the project or state threshold, commonly 0.01 f/cc, with visual inspection passing first.
Aggressive sampling
A clearance method using fans or blowers to disturb air and dislodge settled fibers, ensuring samples represent worst-case conditions before containment is removed.
Pump calibration
Air sampling pumps must be calibrated before and after use with a primary standard, and calibration records kept with sample logs and chain-of-custody forms.
Supervisor daily log
A record of daily activities, worker names and hours, air monitoring results, containment inspections, waste shipments, and incidents kept by the on-site supervisor.
Training record contents
Records must show employee name, training dates, and type of training, retained per OSHA and Hawaii requirements for the specified period.
Containment inspection
The supervisor checks containment for tears and breaches daily, verifies negative pressure, and documents repairs in the project log.
Project closeout report
Final documentation including clearance results, waste manifests, inspection logs, and training records, retained by the contractor after abatement is complete.