- Authorized Person (Architect)
- A person registered under the Architects Registration Ordinance and appointed to prepare and submit building plans and supervise building works under the Buildings Ordinance.
- Buildings Ordinance s.14
- Provision requiring plans of building works to be submitted to the Building Authority for approval before works commence; approval is a precondition to lawful construction.
- Occupation permit
- Approval issued by the Building Authority confirming a building is fit for occupation; it is distinct from practical completion certified under the building contract.
- Practical completion
- The contract milestone at which works are substantially complete, the employer takes possession, the defects liability period starts and half the retention is typically released.
- Retention money
- A percentage deducted from each interim payment and held as security for defects, released in stages per the contract, commonly half at practical completion and the balance after the maintenance period.
- Interim certificate
- The certifier's periodic valuation of work executed and materials on site, less retention and prior payments, issued at the interval stated in the contract as the basis for payment.
- Variation instruction
- A written instruction by the architect changing the works within the contract's scope; it is valued at contract rates or a fair valuation and affects both price and time.
- Extension of time
- An extension of the completion date certified by the architect after the contractor gives timely notice and substantiates a delay event listed as a ground in the contract.
- Defects liability period
- The period after practical completion during which the contractor must remedy notified defects at its own cost, typically twelve months unless the contract states otherwise.
- Final account
- The reconciled statement of the contract sum adjusted for variations, provisional sums, loss and expense and other entitlements, agreed after the defects liability period.
- Outline Zoning Plan
- The statutory plan under the Town Planning Ordinance setting land use zones and development restrictions such as plot ratio and site coverage for a site.
- Plot ratio
- The ratio of total gross floor area to site area permitted by the zoning plan or lease; it caps the developable floor area on a site.
- Site coverage
- The proportion of the site area covered by the building footprint above ground; it controls open space and is limited by the zoning plan or lease.
- Means of escape
- The protected routes, exit widths and travel distances allowing occupants to reach a place of safety, assessed against the fire safety code applicable at submission.
- BEAM Plus
- A Hong Kong green building assessment framework scoring sustainability performance across site, energy, water, materials and indoor environment, used to benchmark design quality.
- Registered Structural Engineer
- A professional registered under the Buildings Ordinance who prepares and certifies structural plans and supervises structural works, distinct from the Authorized Person.
- Unauthorised building works
- Works carried out without the required approval or consent, or contrary to approved plans; they are enforceable by the Building Authority and may require removal or validation.
- Appeal Tribunal
- The body hearing appeals against the Building Authority's refusal of plans or other specified decisions under the Buildings Ordinance, giving an alternative to litigation.
- Architects Registration Board
- The statutory body maintaining the register of architects, administering the Professional Assessment and exercising disciplinary powers including censure, suspension and removal.
- Professional Assessment
- The HKIA/ARB examination required for registration, comprising Paper 1 professional knowledge and Paper 2 case study with professional interview.
- Conflict of interest
- A personal or financial interest that could bias professional judgement; it must be disclosed in writing promptly and the architect should withdraw from the affected decision.
- Claims-made insurance
- Professional indemnity cover responding to claims notified during the policy period, regardless of when the negligent act occurred, which is why run-off cover matters.
- Run-off cover
- Professional indemnity insurance purchased after a practice ceases, covering claims notified later for work done while the practice was active.
- Continuing professional development
- Structured learning recorded annually by registered architects across technical, contractual, statutory and ethical topics, with records retained and open to audit.
- Architect as certifier
- The role in which the architect independently values work, assesses time and certifies completion, separate from acting as the employer's agent for design and instructions.
- Architect as agent
- The role in which the architect acts for the employer in administering the contract, issuing instructions and representing the employer, within the authority delegated.
- Mediation before arbitration
- A contractual step in some Hong Kong standard forms requiring the parties to attempt mediation before commencing arbitration, which affects the dispute strategy.
- Duty to inspect
- The architect must inspect works before certifying them; certifying uninspected work breaches the professional standard and exposes the architect to disciplinary and negligence claims.
- Registered Specialist Contractor
- A contractor registered for a specialised category such as drainage or foundation works, required to be appointed for those works under the Buildings Ordinance.
- Consent to commence works
- Approval under the Buildings Ordinance allowing building works to start after plan approval; commencing without it is an offence and a common case-study trap.
- Maintenance certificate
- The certificate issued after the defects liability period expires and notified defects are remedied, triggering release of the remaining retention and the final payment.
- Tender report
- The consultant's written recommendation comparing tenders on price, programme, method and resources, recording the evaluation criteria and justifying any departure from lowest price.