Building Authority
The officer empowered under the Buildings Ordinance to approve plans, grant consent, and issue occupation permits; in practice the Building Authority delegates powers to Buildings Department officers.
Occupation Permit
Approval under section 21 of the Buildings Ordinance allowing a building or part of it to be occupied; it is granted only after the required certificates and compliance documents are lodged.
Site coverage
The area of a building projected onto the site, divided by the site area, expressed as a percentage; the permitted value depends on site classification and building type.
Plot ratio
Total gross floor area of a building divided by the site area; domestic and non-domestic caps differ and are further limited by building height bands.
Gross floor area
The sum of floor area of all storeys measured to prescribed rules, with certain plant, refuse, and specified recreational spaces excluded only where the stated conditions are met.
Site classification
Categories A, B and C assigned to a site based on the number of streets it abuts and their widths, which then sets the baseline site coverage and plot ratio.
Minor Works Control System
A statutory regime allowing specified small-scale building works to proceed under simplified requirements instead of full plan approval, using prescribed plans and qualified contractors.
Consent to commence
Approval under section 14 of the Buildings Ordinance permitting building works to start; consent lapses if work does not begin within the period stated in the consent.
Means of escape
The continuous protected route from any point in a building to a place of safety, made up of exit doors, protected corridors, staircases, and a final exit.
Travel distance
The measured length of the escape route from the most remote point on a floor to the nearest exit; permitted length varies with occupancy risk and sprinkler provision.
Exit width
The total required width of exits serving a floor, calculated from occupant capacity using the prescribed width per person for the occupancy type.
Refuge floor
A protected storey in a high-rise building providing temporary safe accommodation for occupants during evacuation, required above the height threshold in the Fire Safety Code.
Firefighting shaft
A protected enclosure containing a fireman's lift and staircase, required above prescribed height thresholds to allow firefighting operations within tall buildings.
Fire engineering approach
A performance-based justification, using validated modelling, proposed where literal code compliance is impractical; it requires documented assessment and acceptance by the Building Authority.
Practice Note for APs
A Buildings Department document, abbreviated PNAP, setting out current administrative and technical requirements that supplement the ordinances and codes for plan submissions.
Advisory letter
A Buildings Department communication, abbreviated ADV, clarifying interpretation or announcing revised requirements; it does not itself amend the regulations.
Alteration and addition works
Works that modify an existing building; they require plan submission when they affect structure, means of escape, fire safety, or the prescribed building provisions.
Demolition plan
A submission showing the sequence, temporary supports, and protective measures for removing a building, including protection of adjoining structures and the public.
Lease conditions
Title restrictions recorded against the site that may be stricter than the Buildings Ordinance; where they conflict, the more onerous requirement governs what can be built.
Practical completion
The contractual milestone at which works are complete except for minor defects; it triggers the defects liability period and shifts risk of loss to the employer.
Defects liability period
The period after practical completion during which the contractor must rectify notified defects at its own cost, ending with the maintenance certificate.
Variation instruction
A written order from the contract administrator changing the works; entitlement to extra payment depends on the contract's notice and valuation provisions.
Extension of time
An award by the contract administrator of additional contract time for delay from specified causes, protecting the contractor from liquidated damages for that period.
Retention money
A percentage withheld from interim payments as security for defects, released in stages, typically half at practical completion and the balance after the defects liability period.
Security of payment
Hong Kong legislation imposing statutory timelines for payment responses and adjudication, operating alongside the contract's own certification and payment mechanism.
Conflict of interest
A situation where an architect's personal or financial interest could affect professional judgement; it must be disclosed in writing and consent obtained before proceeding.
Continuing professional development
The annual programme of learning activities an architect must complete and record to maintain registration with the Architects Registration Board.
Declared monument
A building or structure given statutory protection under the Antiquities and Monuments Ordinance; any works affecting it require a permit from the Antiquities Authority.
Designated project
A project type listed under the Environmental Impact Assessment Ordinance that requires an approved environmental impact assessment and an environmental permit before construction.
Barrier free access
The design requirements in the Design Manual: Barrier Free Access, applied to new buildings and to alterations of prescribed scope, covering routes, ramps, and sanitary fitments.
Certifier's duty
The architect's obligation when issuing interim or completion certificates to act independently and certify only work actually executed to the required standard.
Building plans submission
The formal lodgement of general building plans and associated calculations with the Building Authority for approval before building works may proceed.