- Environmental Impact Assessment (EIA)
- Related: Environmental Permit, Environmental Monitoring and Audit, Mitigation Hierarchy
A statutory process that predicts the environmental consequences of a designated project before approval, documents them in an assessment report, and sets out mitigation and monitoring commitments that later become enforceable conditions.
- Environmental Permit (EP)
- Related: Environmental Impact Assessment (EIA), Environmental Monitoring and Audit
A formal authorisation issued under the environmental impact assessment ordinance that allows a designated project to be constructed and operated, subject to binding conditions on design, mitigation, monitoring and reporting.
- Designated Project
- Related: Environmental Impact Assessment (EIA), Environmental Permit
A project type listed in the environmental impact assessment ordinance schedule that must undergo statutory assessment and obtain a permit before work starts, because of its scale or potential environmental effect.
- Mitigation Hierarchy
- Related: Best Practicable Environmental Option, Residual Impact
The ordered preference for avoiding an impact at source, then minimising it, then abating or treating it, and only finally compensating for residual effects; used to justify why a chosen measure is the best available option.
- Residual Impact
- Related: Mitigation Hierarchy, Significance Threshold
The environmental effect that remains after all planned avoidance, reduction and control measures have been applied; it is the quantity compared against standards and used to judge acceptability and compensation needs.
- Significance Threshold
- Related: Residual Impact, Sensitive Receptor
A pre-agreed criterion, combining magnitude, extent, duration, reversibility and sensitivity of receptors, that decides whether a predicted impact is acceptable, needs mitigation, or is a showstopper for the project.
- Sensitive Receptor
- Related: Air Sensitive Receiver, Significance Threshold
A person, property or ecosystem that could be harmed by a pollutant or disturbance, such as a hospital, school, residential block, shellfish bed or protected habitat, and which anchors the impact assessment.
- Air Sensitive Receiver
- Related: Sensitive Receptor, Air Quality Objective
A location where people may be exposed to airborne pollution for a meaningful period, used as the compliance point for air quality predictions and for siting monitoring stations.
- Air Quality Objective
- Related: Air Sensitive Receiver, Dispersion Modelling
A legally adopted concentration limit for a pollutant over a stated averaging time, against which predicted and measured ambient levels are compared to judge compliance and needed controls.
- Dispersion Modelling
- Related: Air Quality Objective, Gaussian Plume Model
Mathematical simulation of how emitted pollutants spread and dilute in the atmosphere using source, meteorology and terrain data, producing predicted concentrations at receptors for comparison with standards.
- Gaussian Plume Model
- Related: Dispersion Modelling, Mixing Height
A steady-state dispersion calculation assuming pollutant concentration follows a normal distribution across the plume and downwind, widely used for screening industrial and vehicular emissions.
- Mixing Height
- Related: Gaussian Plume Model, Pasquill Stability Class
The depth of the atmospheric layer near the ground through which pollutants are mechanically and thermally mixed; a key input because a shallow layer concentrates emissions and raises predicted concentrations.
- Pasquill Stability Class
- Related: Mixing Height, Dispersion Modelling
A letter classification from A to F describing how strongly the atmosphere suppresses or encourages vertical mixing, derived from wind speed, solar radiation and cloud cover, and used to select dispersion coefficients.
- Best Practicable Environmental Option (BPEO)
- Related: Mitigation Hierarchy, Options Appraisal
The outcome of a structured comparison of alternatives that delivers the most benefit or least damage to the environment as a whole, at acceptable cost, in the long and short term.
- Options Appraisal
- Related: Best Practicable Environmental Option (BPEO), Design Justification
A documented comparison of feasible project alternatives against consistent technical, environmental, cost and deliverability criteria, used to show that the preferred scheme was rationally selected.
- Design Justification
- Related: Options Appraisal, Design Check
The written reasoning that links design decisions to calculated performance, standards and constraints, allowing a reviewer to check that assumptions, margins and trade-offs are defensible.
- Design Check
- Related: Design Justification, Professional Indemnity
An independent review of calculations, drawings and specifications by a competent person not responsible for the original design, confirming correctness before construction or submission.
- Environmental Monitoring and Audit (EM&A)
- Related: Environmental Permit, Action and Limit Levels
The programme of baseline, compliance and impact monitoring, plus auditing of results against predictions and permit limits, that verifies mitigation works and triggers corrective action when exceedances occur.
- Action and Limit Levels
- Related: Environmental Monitoring and Audit (EM&A), Exceedance
Pre-set monitoring thresholds: breaching an action level prompts investigation and preventive measures, while breaching a limit level requires reporting to the authority and remedial action.
- Exceedance
- Related: Action and Limit Levels, Non-conformance
A measured value outside a permit limit, standard or predicted range; it must be recorded, investigated for cause, reported and followed by corrective action within agreed timescales.
- Non-conformance
- Related: Exceedance, Corrective Action
A documented failure to meet a specified requirement, such as a permit condition, procedure or standard, which must be logged, root-cause analysed, corrected and closed out with verification.
- Corrective Action
- Related: Non-conformance, Exceedance
The step taken to eliminate the cause of a detected problem so it does not recur, distinguished from immediate containment, and tracked to closure with evidence of effectiveness.
- Environmental Management System (EMS)
- Related: Aspect and Impact Register, Continual Improvement
The structured set of responsibilities, procedures, objectives and reviews by which an organisation controls its environmental aspects, typically certified against the ISO 14001 standard.
- Aspect and Impact Register
- Related: Environmental Management System (EMS), Significance Threshold
A maintained list pairing each activity or service with the environmental aspects it creates and the resulting impacts, ranked by significance, forming the basis for operational controls and objectives.
- Continual Improvement
- Related: Environmental Management System (EMS), Corrective Action
The recurring cycle of setting objectives, measuring performance, reviewing results and adjusting controls so environmental performance strengthens over time rather than plateauing at a fixed level.
- Polluter Pays Principle
- Related: Precautionary Principle, Waste Disposal Levy
The policy that whoever causes pollution should bear the cost of preventing, controlling or remediating it, so environmental costs are reflected in the price of goods and services rather than borne by society.
- Precautionary Principle
- Related: Polluter Pays Principle, Mitigation Hierarchy
Where there are threats of serious or irreversible damage, lack of full scientific certainty shall not be used as a reason for postponing cost-effective measures to prevent environmental degradation.
- Waste Disposal Levy
- Related: Polluter Pays Principle, Construction and Demolition Waste
A charge per tonne imposed on waste sent to landfill, intended to internalise disposal costs and drive waste reduction, sorting and recycling ahead of final disposal.
- Construction and Demolition Waste
- Related: Waste Disposal Levy, Waste Management Hierarchy
Mixed material arising from building, excavation and demolition works, managed through reduction at source, on-site sorting, reuse and recycling before any landfill disposal.
- Waste Management Hierarchy
- Related: Construction and Demolition Waste, Mitigation Hierarchy
The ranked preference of avoidance, reuse, recycling and recovery before treatment and disposal, applied when selecting the most resource-efficient route for a given waste stream.
- Noise Sensitive Receiver
- Related: Construction Noise Permit, A-weighted Sound Level
A use where intruding noise causes annoyance or harm, such as dwellings, schools and hospitals, used to fix assessment points and acceptable noise criteria for the relevant time period.
- Construction Noise Permit
- Related: Noise Sensitive Receiver, A-weighted Sound Level
An authorisation allowing specified construction work during restricted hours, granted only where noise controls and limits set in the permit can be met.
- A-weighted Sound Level
- Related: Noise Sensitive Receiver, Construction Noise Permit
A sound pressure level adjusted to approximate human hearing sensitivity at moderate loudness, expressed in decibels, and the usual descriptor in environmental noise criteria and monitoring.
- Effluent Discharge Standard
- Related: Pollution Load, Environmental Permit
The set of maximum permissible concentrations and loads for pollutants in a discharge to sewer, river or sea, forming the basis for treatment design and for sampling compliance.
- Pollution Load
- Related: Effluent Discharge Standard, Assimilative Capacity
The mass of a pollutant discharged per unit time, calculated as flow multiplied by concentration, which governs the receiving water's assimilative capacity more directly than concentration alone.
- Assimilative Capacity
- Related: Pollution Load, Effluent Discharge Standard
The ability of a receiving water or air body to absorb a pollutant load without breaching its quality objectives or causing unacceptable ecological harm.
- Environmental Due Diligence
- Related: Contaminated Land, Professional Indemnity
Systematic investigation of a site or transaction for existing contamination, regulatory breaches and liabilities, so that risks and clean-up costs are known before commitment.
- Contaminated Land
- Related: Environmental Due Diligence, Remediation Verification
Land where substances present at concentrations above background pose a significant risk to human health or the environment, requiring assessment, remediation and verification before a new use.
- Remediation Verification
- Related: Contaminated Land, Non-conformance
The sampling, testing and reporting that demonstrates a clean-up has achieved its agreed targets, producing evidence accepted by the regulator before the site is released for use.
- Professional Indemnity
- Related: Design Check, Duty of Care
Insurance covering a practitioner or firm against claims of negligent advice, design error or omission, and a common contractual requirement before environmental consultancy services are engaged.
- Duty of Care
- Related: Professional Indemnity, Conflict of Interest
The obligation to exercise reasonable skill and care toward those affected by one's work, including clients, the public and the environment, and to act within one's competence.
- Conflict of Interest
- Related: Duty of Care, Whistleblowing
A situation where a personal, financial or other interest could improperly influence professional judgement; it must be disclosed and managed, or the engagement declined.
- Whistleblowing
- Related: Conflict of Interest, Code of Conduct
Reporting a genuine concern about wrongdoing, danger or cover-up to an appropriate party, protected when done in good faith through proper channels rather than public disclosure first.
- Code of Conduct
- Related: Duty of Care, Continuing Professional Development
The published rules of the professional institution governing integrity, competence, objectivity and respect, breach of which can lead to disciplinary action against a member.
- Continuing Professional Development (CPD)
- Related: Code of Conduct, Mentoring
Structured, recorded learning and reflective practice maintained throughout a career to keep technical knowledge and judgement current, and typically required for registration and membership.
- Mentoring
- Related: Continuing Professional Development (CPD), Training Record
A supported relationship in which an experienced practitioner guides a developing engineer's technical and professional growth through advice, review of work and honest feedback.
- Training Record
- Related: Mentoring, Continuing Professional Development (CPD)
A verified log of experience, tasks, responsibilities and reflections used to demonstrate the breadth and depth of development needed for professional assessment.
- Professional Judgement
- Related: Design Justification, Significance Threshold
The reasoned application of knowledge, standards and experience to uncertain or incomplete situations, with assumptions stated and decisions defensible to peers and regulators.