HKIE Professional Assessment - Manufacturing, Industrial & Systems Discipline · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Manufacturing Processes and Production Engineering

  • Map the full manufacturing-process landscape by writing a one-page comparison of casting, forming, machining, joining and additive processes, listing for each the typical defects, tolerances and cost drivers.

  • Derive and apply the core process calculations from first principles: cutting speed, feed, depth of cut, material removal rate, shear-plane and Merchant force relations, and blanking force.

  • Analyse a metal-forming case (deep drawing or extrusion) by calculating draw ratio, reduction, and forming load, then state which limit causes failure.

  • Diagnose five classic process defects (porosity, hot tearing, undercut, weld lack-of-fusion, residual-stress cracking) and propose one corrective action for each.

  • Build a personal formula sheet for Domain 1 with units checked on every term.

Your checkpoint

A 4-page Domain 1 formula and defect-diagnosis sheet, plus three fully worked numerical problems with unit-consistent answers.

Week 2

Industrial Engineering and Operations Research

  • Formulate and solve linear-programming models by hand (graphical method) and by simplex tableau for production-mix and blending problems.

  • Solve a transportation and an assignment problem using the stepping-stone or MODI method and the Hungarian method, and interpret the dual prices.

  • Compute EOQ, reorder point, safety stock and production-run models, and explain how each input shifts the answer.

  • Apply work-study and line-balancing techniques: time study with rating and allowances, standard time, takt time, and precedence-diagram balancing.

  • Set up and read a queuing model (M/M/1 and M/M/s) for a workstation and interpret utilisation and waiting time.

Your checkpoint

A worked problem set of eight quantitative IE/OR problems with a one-line interpretation of each result.

Week 3

Manufacturing Processes and Production Engineering & Industrial Engineering and Operations Research

  • Integrate process choice with capacity and cost by building a process-selection matrix scored against volume, tolerance, material and lead time.

  • Perform a break-even and cost-volume analysis comparing two manufacturing routes and identify the indifference volume.

  • Apply forecasting methods (moving average, exponential smoothing, Holt-Winters) to a 24-period demand series and compare error metrics (MAD, MAPE, bias).

  • Aggregate a master production schedule from a forecast and a bill of materials, then explode one product two levels down.

  • Critique where process capability constrains the production plan and quantify the capacity loss.

Your checkpoint

A single integrated case study linking process route, break-even volume, forecast and MPS for one product, with a decision recommendation.

Week 4

Systems Engineering and System Integration

  • Write a stakeholder needs statement, then derive functional, performance and interface requirements with traceability identifiers.

  • Construct a functional architecture and an N-squared or design-structure-matrix view for a small industrial system, and justify the decomposition.

  • Apply the systems engineering V-model to a machine or line-integration project, mapping verification and validation activities to each level.

  • Perform interface analysis and a trade study using a weighted decision matrix with sensitivity check.

  • Draft a verification cross-reference matrix and state the acceptance criterion for each requirement.

Your checkpoint

A requirements-and-architecture package for one integrated manufacturing system: needs, 15 traceable requirements, functional architecture, trade study and verification matrix.

Week 5

Quality Management, Metrology and Reliability

  • Construct and interpret control charts (X-bar-R, individuals, p, c) and calculate control limits, then distinguish common from special cause variation.

  • Compute Cp, Cpk and Pp, Ppk for a dataset and explain why Cpk can differ from P, and what each tells a customer.

  • Design a sampling plan: choose AQL, lot size and inspection level, then compute producer's and consumer's risk using the operating-characteristic curve.

  • Calculate system reliability for series, parallel and k-out-of-n configurations, and apply the exponential and Weibull models to failure data.

  • Plan a measurement-system analysis: gauge R&R, bias, linearity and calibration traceability, and state acceptance thresholds.

Your checkpoint

A quality-and-reliability workbook with two control charts, a capability study, an OC-curve sampling plan and a gauge R&R conclusion.

Week 6

Automation, Robotics and Intelligent Manufacturing

  • Specify a pick-and-place automation cell: end-effector, sensors, actuators and controller, and justify each selection against cycle-time and payload requirements.

  • Derive forward and inverse kinematics for a simple planar or two-link arm, and compute workspace and singularities.

  • Select and size a motor and drive for an axis by calculating torque, inertia, acceleration and duty cycle.

  • Compare PLC, PAC and industrial-PC architectures and write structured ladder or function-block logic for an interlocked sequence.

  • Assess an Industry 4.0 / digital-twin proposal by identifying data sources, communication protocols, cybersecurity exposure and realistic payback.

Your checkpoint

An automation cell specification with kinematic and motor-sizing calculations, control architecture diagram and interlock logic description.

Week 7

Supply Chain, Logistics and Production Planning & Engineering Economics, Project and Risk Management

  • Classify inventory by ABC and XYZ analysis and set differentiated replenishment policies for each class.

  • Evaluate a supplier using a weighted scorecard covering quality, cost, delivery, capacity and risk, and document the sourcing recommendation.

  • Compare NPV, IRR, payback and equivalent annual cost for two equipment options, including depreciation and tax effects.

  • Build a project network, compute critical path and float, and compress the schedule by crashing the cheapest activities.

  • Run a qualitative and semi-quantitative risk assessment (probability-impact matrix, FMEA with RPN) and assign mitigation owners.

Your checkpoint

A combined supply-chain and investment appraisal report: supplier scorecard, inventory policy, NPV/IRR comparison and a risk register with FMEA.

Week 8

Safety, Health, Environment and Sustainability in Industry & Professional Practice, Ethics, Standards and Hong Kong Statutory Context

  • Apply Hong Kong statutory duties for industrial undertakings: identify employer and employee duties under the Factories and Industrial Undertakings Ordinance and the Occupational Safety and Health Ordinance, and state the role of the Labour Department.

  • Assess a workshop against key safety regulations and codes of practice covering machinery guarding, electricity, noise and confined spaces, and list non-compliances with corrective actions.

  • Conduct a risk assessment using the hierarchy of controls and calculate a noise exposure or chemical exposure result against an action level.

  • Evaluate sustainability measures by computing energy use, carbon footprint and waste-reduction options with payback.

  • Apply the HKIE professional and ethical obligations to three short scenarios (conflict of interest, safety sign-off under pressure, public-interest disclosure) and justify the correct course of action.

Your checkpoint

A safety, environmental and ethics portfolio: a compliance gap analysis with corrective actions, one exposure calculation, a sustainability option appraisal and three written ethics case responses.

Milestones

Week 2: Score at least 70% on a self-made 25-question test covering Domains 1 and 2, with every numerical answer reworked from the formula sheet.

Week 4: Complete a timed 40-question mixed mock on Domains 1-3 and write a one-page error log listing each mistake, its root cause and the corrective study action.

Week 6: Complete a timed 40-question mixed mock on Domains 4-5 plus retained Domain 1-2 items, and show measurable improvement over the week-4 error log.

Week 8: Complete two full-length timed mock papers under exam conditions, achieving at least 65% in every domain, and confirm all deliverables from weeks 1-8 are filed and reviewed.