Huawei HCIA-Storage study materials
Huawei HCIA-Storage study resources

Huawei HCIA-Storage cheat sheet

Huawei HCIA-Storage · Keep the key ideas within reach.

Quick reference

ICT Infrastructure

  • RAID 5 tolerates one drive failure; usable capacity = (N-1) × smallest drive capacity; minimum 3 drives.

  • RAID 6 tolerates two simultaneous drive failures; usable capacity = (N-2) × smallest drive capacity; minimum 4 drives.

  • RAID 10 (1+0) combines mirroring and striping: usable capacity = 50% of raw; tolerates one failure per mirrored pair; minimum 4 drives.

  • RAID 0 provides striping with no redundancy; usable capacity = 100% of raw; a single drive failure loses the entire array.

  • Fibre Channel (FC) SAN uses lossless, in-order delivery with buffer-to-buffer credits; iSCSI encapsulates SCSI over TCP/IP and is lossy, relying on TCP retransmission.

  • SAS and NL-SAS drives are dual-ported for HA; SATA drives are single-ported and unsuitable for multi-initiator HA storage.

  • SSD wear leveling and garbage collection cause write amplification; over-provisioning (typically 7–28%) preserves endurance and steady-state performance.

  • Erasure coding with k data and m parity fragments tolerates m fragment losses; storage overhead = (k+m)/k; reconstruction requires any k fragments.

  • Storage tiering places hot data on SSD and cold data on HDD; tiering granularity is typically a sub-LUN extent or chunk rather than a whole LUN.

Quick reference

Basic Software & Hardware

  • A storage controller (engine) contains CPU, cache, and host/disk interfaces; dual-controller configurations provide active-active HA with transparent failover.

  • Write-back cache acknowledges writes before they reach disk; protected by a battery or supercapacitor (BBU) to prevent data loss on power failure.

  • Write-through cache writes to disk before acknowledging; lower risk but higher write latency than write-back.

  • Cache mirroring between two controllers ensures a write cached on one controller is also held on the peer, allowing takeover without data loss.

  • Multipathing (e.g., Huawei UltraPath) presents multiple physical paths to a LUN as one logical path; ALUA defines active/optimized and active/non-optimized target port states.

  • LUN masking maps a LUN to specific host initiators (WWN or IQN); without masking, a host may see and corrupt LUNs it does not own.

  • Thin provisioning allocates physical capacity on demand; over-subscription ratio = total provisioned capacity / physical capacity; monitor for out-of-space risk.

  • A snapshot preserves a point-in-time image; copy-on-write snapshots store only changed blocks, while full copies duplicate all data and consume full capacity.

  • Huawei OceanStor DeviceManager is the GUI for configuration, alarms, and performance monitoring; SmartKit provides host-side inspection and upgrade tools.

Quick reference

Cloud Platform & Cloud Services

  • Huawei FusionSphere comprises FusionCompute (virtualization), FusionManager (management), and FusionStorage (distributed storage).

  • FusionCompute components: VRM (management), CNA (compute node agent), and UVP (hypervisor kernel); VRM manages clusters and CNA runs VMs.

  • FusionStorage uses a fully distributed architecture with DHT (distributed hash table) for data placement and no dedicated metadata node.

  • In FusionStorage, a VBS (virtual block store) handles I/O on compute nodes and OSDs (object storage devices) store data on disks; a VBS can access any OSD.

  • Huawei public cloud services include ECS (Elastic Cloud Server), EVS (Elastic Volume Service), OBS (Object Storage Service), and VPC (Virtual Private Cloud).

  • EVS volumes are block storage attached to ECS; OBS provides object storage with buckets and is accessed via REST/S3-compatible APIs.

  • Cloud service models: IaaS provides infrastructure, PaaS provides runtime and middleware, SaaS provides applications; the customer's management responsibility decreases from IaaS to SaaS.

  • A VPC isolates cloud network resources; subnets, security groups (stateful), and ACLs (stateless) control traffic; EIP provides public IP access to cloud resources.

  • Huawei backup and DR services include VBS (Volume Backup Service) for cloud disk backup and CSBS for cloud server backup; both support policy-based scheduling.

Quick reference

Project Management

  • Project life cycle phases: initiation, planning, execution, monitoring and control, and closure; each phase produces deliverables and a phase gate review.

  • Triple constraint: scope, time, and cost are interdependent; a change in one requires adjustment in the others to maintain quality.

  • WBS (work breakdown structure) decomposes deliverables into work packages; the lowest level should be estimable and assignable.

  • Critical path is the longest duration path through the network diagram; it determines minimum project duration and has zero total float.

  • Earned value formulas: CV = EV − AC; SV = EV − PV; CPI = EV/AC; SPI = EV/PV; EAC = BAC/CPI (typical variance).

  • Risk response strategies: avoid, transfer, mitigate, accept for threats; exploit, share, enhance, accept for opportunities.

  • A RAID or storage migration project should include a rollback plan, a maintenance window, and a tested backup before cutover.

  • Change control: any scope change requires a formal change request, impact analysis, approval by the change control board, and updates to baseline documents.

  • Stakeholder register records interest, influence, and engagement strategy; high power/high interest stakeholders require active management.