IA Asbestos Abatement flashcards
IA Asbestos Abatement · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Asbestos latency period
- The time between first asbestos exposure and disease diagnosis. Asbestosis and lung cancer typically appear 15-30 years later, while mesothelioma may take 20-50 years.
- Asbestos PEL and excursion limit
- OSHA construction standard sets an 8-hour time-weighted average permissible exposure limit of 0.1 fibers per cubic centimeter and a 30-minute excursion limit of 1.0 f/cc.
- Medical surveillance trigger
- Under OSHA 29 CFR 1926.1101, medical surveillance is required when a worker is exposed at or above the PEL or excursion limit for 30 or more days per year.
- ILO B-reader
- A physician specially trained and certified to classify chest radiographs for pneumoconiosis using the International Labour Organization classification system, used in asbestos medical surveillance.
- NESHAP notification threshold
- Written notice to the delegated agency is required at least 10 working days before renovation or demolition involving 260 linear feet, 160 square feet, or 35 cubic feet of RACM.
- RACM definition
- Regulated asbestos-containing material includes friable ACM, Category I nonfriable that will be crumbled or pulverized, and Category II nonfriable likely to be crumbled or pulverized.
- Class I asbestos work
- Removal of thermal system insulation or surfacing ACM/PACM. It is the highest-hazard class and requires critical barriers, negative pressure containment, and a trained supervisor.
- Class II asbestos work
- Removal of ACM other than thermal system insulation or surfacing material, such as floor tile, roofing, siding, and gaskets; controls vary by material and disturbance potential.
- Competent person
- An OSHA-designated individual who can identify asbestos hazards, has authority to take prompt corrective action, and is required on site for Class I and Class II work.
- Six regulated asbestos minerals
- Chrysotile (serpentine) and five amphiboles: amosite, crocidolite, anthophyllite, tremolite, and actinolite. Chrysotile accounts for about 95% of commercial asbestos use.
- ACM 1% threshold
- Material containing more than 1% asbestos by weight is regulated as asbestos-containing material under EPA and OSHA programs; 1% or less is not regulated ACM.
- Homogeneous area
- An area of surfacing material, thermal system insulation, or miscellaneous material that is uniform in color and texture; each homogeneous area must be sampled separately.
- Friable asbestos material
- Material that can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friability increases fiber release potential and regulatory control.
- Polarized light microscopy
- The standard bulk sample analysis method using PLM with dispersion staining to identify asbestos minerals and estimate percent asbestos; TEM or gravimetric methods may be used when PLM is inconclusive.
- Category I nonfriable
- Asphalt roofing, shingles, gaskets, and resilient floor coverings that are nonfriable but may become regulated if crumbled, pulverized, or reduced to powder.
- Regulated area signage
- Warning signs reading DANGER - ASBESTOS - CANCER AND LUNG DISEASE HAZARD - AUTHORIZED PERSONNEL ONLY must be posted at all entrances to the regulated area.
- Decontamination unit sequence
- A series of connected rooms: clean room, shower, and equipment/waste room. Workers pass clean-to-dirty on entry and dirty-to-clean on exit, showering before leaving.
- Pre-abatement inspection
- A survey identifying all ACM in and adjacent to the work area, including hidden materials, to define scope, work classification, and required controls before abatement begins.
- Negative pressure target
- Containments must maintain at least -0.02 inches of water column (about 5 Pa) relative to adjacent areas, verified with a manometer and recorded at least daily.
- Air changes per hour
- The number of times containment air is exchanged per hour; HEPA negative air machines are sized to provide at least 4 ACH, calculated as volume in cubic feet times ACH divided by 60.
- HEPA filter efficiency
- High-efficiency particulate air filters remove at least 99.97% of particles 0.3 microns in diameter; all containment exhaust must pass through HEPA filtration.
- Critical barriers
- Two layers of 6-mil polyethylene installed and sealed over all openings, surfaces, and penetrations to isolate the work area from occupied spaces.
- Amended water
- Water mixed with a surfactant (wetting agent) used to suppress fiber release during removal; ACM must be kept wet throughout abatement work.
- Glove bag use
- A sealed bag with built-in gloves used for localized removal of pipe insulation; the worker reaches through gloves to remove ACM while maintaining containment.
- Wet methods
- Techniques that keep ACM wet with amended water during removal, handling, and disposal to prevent fibers from becoming airborne; dry sweeping and compressed air are prohibited.
- Respirator assigned protection factor
- The level of protection a respirator class is expected to provide: half-mask APR up to 10× PEL, full-face APR up to 50×, PAPR up to 100×.
- Respirator fit testing
- A test verifying a tight-fitting respirator seals to the face; required before initial use and annually, with a user seal check each time the respirator is donned.
- Respirator donning sequence
- In the clean room, put on and check the respirator, then coveralls, hood, boot covers, and gloves; doffing reverses the order in the equipment room before showering.
- Waste shipment record
- A form tracking asbestos waste from generator to transporter to disposal site; the generator retains a copy for at least 2 years and follows up if not returned within 45 days.
- Asbestos waste packaging
- ACM waste must be wetted, placed in leak-tight containers such as double 6-mil poly bags or drums, labeled with the asbestos warning, and sealed before transport.
- Clearance air criteria
- Common clearance limits are 0.01 fibers per cubic centimeter by PCM or 70 structures per square millimeter by TEM; project specifications may set stricter limits.
- Aggressive air sampling
- A clearance sampling method that uses fans or blowers to disturb settled dust for at least 10 minutes before and during sampling, verifying that cleanup is complete.