NBOPE Journeyperson Plumber study materials
NBOPE Journeyperson Plumber study resources

NBOPE Journeyperson Plumber study plan

NBOPE Journeyperson Plumber · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Drainage Systems, Fixtures, and Fittings & Venting Systems and Traps

  • Map the drainage system from a stack through the building drain to the building sewer, labeling soil, waste, and vent connections on a self-drawn single-line diagram.

  • Calculate the developed length of a drain run and convert slope requirements (1/4 in per ft vs 1/8 in per ft) into actual fall over that length.

  • Identify the function of each trap component (trap seal, crown weir, trap arm, cleanout) and state the minimum trap seal depth and trap arm length limits for common fixture sizes.

  • Classify each common fitting (sanitary tee, wye, combo, long-sweep 1/4 bend, reducing fittings) by where it may and may not be used in drainage and venting.

  • Explain the difference between a vent stack, stack vent, individual vent, and wet vent, and locate each on your diagram.

Your checkpoint

A one-page hand-drawn drainage-and-venting diagram of a two-bathroom house with every fitting, trap, and vent type labeled and slope calculations shown.

Week 2

Drainage Systems, Fixtures, and Fittings & Venting Systems and Traps

  • Size branch drains, a building drain, and a building sewer from a fixture-unit table using a worked example, showing each step.

  • Determine when a cleanout is required at the base of a stack, at horizontal drain changes, and at the building sewer, and state the required clearance.

  • Evaluate vent sizing for a given stack and fixture load, and identify conditions that require an increase in vent size.

  • Diagnose five common drainage/venting defects (S-trap, crown-vented trap arm, flat or back-graded drain, improper wet vent, missing vent) and write the code reason each fails.

  • Describe the requirements for an air admittance valve and a circuit vent well enough to decide whether each is permitted in a given scenario.

Your checkpoint

A worked sizing packet: one full building drain and sewer sizing calculation plus a 10-question self-test on traps and venting scored at 80% or better.

Week 3

Water Supply and Distribution Systems & Plumbing Mathematics, Sizing, and Fixture Units

  • Convert between fixture units, gallons per minute, and pipe sizes using a demand table, and explain how flush-tank and flushometer fixtures are counted differently.

  • Size a water service and main for a single-family dwelling from a given fixture list, documenting the demand, pressure, and developed-length inputs.

  • Calculate pressure loss from static head, friction loss, and elevation change, and determine whether residual pressure at the top fixture is adequate.

  • Compute the volume of a cylindrical and rectangular tank in gallons and use that to size a storage or expansion tank.

  • Explain the difference between a direct and an indirect water supply connection and identify where each is required.

Your checkpoint

A water supply sizing worksheet for a two-story dwelling showing fixture-unit totals, demand in gpm, selected pipe sizes for service, main, and branches, and a residual-pressure check.

Week 4

Plumbing Fixtures and Fixture Fittings & Water Heaters and Hot Water Supply

  • Match each fixture type (water closet, lavatory, bathtub, shower, sink, drinking fountain) to its required trap size, minimum flow rate, and rough-in dimensions.

  • Explain flushometer valve operation and state the minimum pressure and pipe size required to serve a flushometer water closet.

  • Compare storage-tank, tankless, and heat-pump water heaters on recovery rate, venting needs, and installation clearances, and select one for a stated load.

  • Calculate the first-hour rating needed for a household from fixture demand and peak-hour use, and compare it to a manufacturer rating.

  • Identify temperature-and-pressure relief valve requirements, including discharge pipe sizing, material, and termination.

Your checkpoint

A fixture and water heater specification sheet for one dwelling listing each fixture's trap size and rough-in, plus a selected water heater with first-hour rating calculation and T&P relief discharge details.

Week 5

Fuel Gas Piping and Appliance Connections & General Plumbing Knowledge, Tools, and Safety

  • Trace a fuel gas piping system from the meter to each appliance, labeling the shutoff valve, regulator, drip leg, and connector.

  • Size a natural gas branch line from appliance input in BTUs and the longest-run method, showing the table lookup and the pipe size chosen.

  • Distinguish natural gas from propane in terms of heating value, pressure, and orifice sizing, and state why appliances cannot be converted without a kit.

  • List the combustion air requirements for a gas appliance in a confined space and calculate the required free area for both grilles.

  • Describe pressure-testing requirements for gas piping, including test medium, pressure, duration, and who may witness it.

Your checkpoint

A gas piping layout with a completed longest-run sizing calculation for three appliances and a written combustion-air calculation for the mechanical room.

Week 6

Backflow Prevention, Cross-Connection Control, and Water Quality & Code Administration, Permits, and Inspection

  • Define cross-connection, backsiphonage, and backpressure, and give one realistic plumbing example of each.

  • Select the correct backflow preventer (air gap, atmospheric vacuum breaker, pressure vacuum breaker, double check, reduced-pressure principle assembly) for five scenarios and justify each choice.

  • Describe the testing and annual inspection requirements for a reduced-pressure principle assembly, including who may test it.

  • Outline the permit and inspection sequence for a residential repipe, from application through final inspection, and list what an inspector typically checks at rough-in.

  • Explain the responsibilities of the plumber versus the authority having jurisdiction when a code conflict or field change arises.

Your checkpoint

A backflow-device selection table covering five scenarios with justification, plus a one-page permit-and-inspection checklist for a repipe job.

Week 7

General Plumbing Knowledge, Tools, and Safety & Plumbing Mathematics, Sizing, and Fixture Units

  • Demonstrate safe handling and storage of soldering equipment, flux, and solvents, and state the fire-watch and ventilation rules for hot work.

  • Identify the correct tool for ten common tasks (press fittings, PEX expansion, cast iron cutting, copper bending) and state one safety hazard per tool.

  • Solve ten mixed plumbing math problems covering slope, volume, pressure, fixture units, and gas input, under timed conditions.

  • Convert between decimal inches and fractional inches, and between psi and feet of head, without a calculator error.

  • Explain lockout/tagout and confined-space entry basics as they apply to a plumbing service call.

Your checkpoint

A timed 10-problem math set completed with 80% or better, plus a one-page tool-and-safety reference card you wrote yourself.

Week 8

Drainage Systems, Fixtures, and Fittings & Venting Systems and Traps & Water Supply and Distribution Systems & Plumbing Fixtures and Fixture Fittings & Water Heaters and Hot Water Supply & Fuel Gas Piping and Appliance Connections & Plumbing Mathematics, Sizing, and Fixture Units & Code Administration, Permits, and Inspection & Backflow Prevention, Cross-Connection Control, and Water Quality

  • Complete two full-length timed practice exams and record the score by domain to find remaining weak areas.

  • Re-study the two lowest-scoring domains and redo the missed questions until you can explain each correct answer aloud.

  • Recite from memory the key numeric limits: trap seal depth, vent and drain slope, cleanout spacing, gas test pressure, and T&P relief settings.

  • Build a one-page formula sheet covering fixture units, slope, volume, pressure, and gas sizing, and use it on a final mixed set.

  • Confirm exam-day logistics: test format, allowed references, identification, and timing.

Your checkpoint

A score report from two timed practice exams with a written list of the five concepts you will review one last time before test day.

Milestones

Week 2: Can size a building drain and sewer from fixture units and explain every trap and vent rule without notes.

Week 4: Can produce a complete water supply sizing worksheet and select a water heater with a first-hour rating calculation, scoring 80% or better on a mixed Domain 4/6/8 quiz.

Week 6: Can select the correct backflow preventer for any scenario and describe the permit and inspection sequence for a repipe.

Week 8: Both timed practice exams completed with an overall score of 80% or better and no domain below 70%.