IBM Sterling B2B Integrator (C8060-218) study materials
IBM Sterling B2B Integrator (C8060-218) study resources

IBM Sterling B2B Integrator (C8060-218) study plan

IBM Sterling B2B Integrator (C8060-218) · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Business Process Modeling and the Graphical Process Modeler & Architecture and Installation

  • Map the Sterling B2B Integrator runtime components (ASI, perimeter server, business process engine, adapters, database) and explain how a business process flows from trigger to completion

  • Install or trace a reference installation: identify the database schema, file system layout, and key configuration properties files

  • Build a first business process in the Graphical Process Modeler using a start node, a sequence, and at least one service, then validate and deploy it

  • Explain the difference between a business process, a service, and an adapter in the engine's execution model

  • Describe how the perimeter server isolates inbound traffic and which adapter classes depend on it

Your checkpoint

A one-page architecture diagram plus a working deployed business process that logs a message and exits cleanly

Week 2

Business Process Modeling and the Graphical Process Modeler & Trading Partner Configuration and Partner Onboarding

  • Model a multi-branch business process using choice nodes, onFault handlers, and exception handling

  • Use process data variables, XPath assignment, and document extraction services to pass data between nodes

  • Create a trading partner profile and a partner group in the Partner Manager, then attach a delivery channel

  • Configure a partner-specific business process override and verify which process runs for that partner

  • Deploy a business process that routes a document to one of two partner groups based on a field value

Your checkpoint

A branching business process with fault handling that routes documents to two partner groups and produces a run log proving both paths executed

Week 3

Trading Partner Configuration and Partner Onboarding & Translation, Enveloping, and Data Formats (EDI, XML, Flat File)

  • Define EDI envelopes (ISA/GS/ST) and explain how control numbers, qualifiers, and test indicators affect processing

  • Configure an EDI translation map from a standard transaction set to an internal XML format and back

  • Build a partner onboarding checklist covering profiles, channels, maps, and certificates

  • Trace how a document moves from inbound EDI through translation, business process, and outbound enveloping

  • Configure acknowledgment generation and identify when functional acknowledgments are expected

Your checkpoint

An end-to-end inbound EDI-to-XML translation for one transaction set with a documented partner onboarding checklist

Week 4

Translation, Enveloping, and Data Formats (EDI, XML, Flat File) & Communication Adapters (FTP, SFTP, AS2, HTTP, MQ, File System)

  • Translate a flat file or positional file into XML using a custom map and validate the output against a schema

  • Configure an FTP or SFTP client adapter with polling, retry, and error handling settings

  • Configure an AS2 delivery channel with signing, encryption, and MDN receipt handling

  • Compare HTTP, MQ, and file system adapters on delivery guarantees and failure modes

  • Document which adapter settings control timeouts and how they surface in the process run

Your checkpoint

A test harness that sends one file through SFTP and one message through AS2, with captured success and forced-failure logs

Week 5

Communication Adapters (FTP, SFTP, AS2, HTTP, MQ, File System) & Security, Certificates, and User/Role Administration

  • Configure a server-side certificate and a partner certificate, then explain the trust chain used for AS2 and TLS

  • Set up user accounts, groups, and permission roles following least privilege

  • Explain how keystores, trusted roots, and certificate expiration affect active channels

  • Troubleshoot a failed signature verification by inspecting certificate aliases and partner profile settings

  • Describe how authentication and authorization decisions are logged for audit

Your checkpoint

A security configuration sheet listing certificate aliases, roles, and permissions with a verified successful signed AS2 exchange

Week 6

Business Process Scheduling, Monitoring, and Troubleshooting & Business Process Modeling and the Graphical Process Modeler

  • Schedule a business process using a time-based trigger and confirm the schedule fires as configured

  • Use the process monitoring views to locate a stalled or failed process instance and identify the failing node

  • Interpret process status codes, fault messages, and adapter-level error logs

  • Enable and read debug logging for a single business process without flooding system logs

  • Apply a repeatable troubleshooting sequence from symptom to root cause on a simulated failure

Your checkpoint

A troubleshooting runbook with three documented failure scenarios, root causes, and resolution steps, each reproduced once

Week 7

Business Process Scheduling, Monitoring, and Troubleshooting & System Administration, Performance, and Maintenance

  • Perform routine maintenance tasks: purge old process data, archive documents, and verify database growth trends

  • Tune performance by adjusting process thread pools, adapter polling intervals, and document storage settings

  • Back up configuration and certificate stores, then restore one item into a test environment

  • Identify which system properties require a restart and which take effect dynamically

  • Diagnose a slow business process using timing data and thread utilization

Your checkpoint

A maintenance checklist with executed purge, backup, and restore steps plus before-and-after performance measurements

Week 8

Architecture and Installation & Business Process Modeling and the Graphical Process Modeler & Trading Partner Configuration and Partner Onboarding & Translation, Enveloping, and Data Formats (EDI, XML, Flat File) & Communication Adapters (FTP, SFTP, AS2, HTTP, MQ, File System) & Security, Certificates, and User/Role Administration & Business Process Scheduling, Monitoring, and Troubleshooting & System Administration, Performance, and Maintenance

  • Re-derive the architecture, modeling, partner, translation, adapter, security, monitoring, and administration objectives from memory and score each domain

  • Re-run two hands-on labs from earlier weeks without notes to confirm retention

  • Review every missed practice item and write the underlying rule it tested

  • Complete one timed full-length practice set under exam conditions and analyze results by domain

  • Build a final one-page cheat sheet of settings, node types, and troubleshooting commands

Your checkpoint

A scored full-length practice attempt with a per-domain gap analysis and a prioritized list of remaining weak areas

Milestones

Week 2: Can build, validate, and deploy a branching business process with fault handling and partner routing without reference material

Week 4: Can complete an inbound EDI-to-XML translation and an outbound delivery over SFTP or AS2 end to end

Week 6: Can locate a failed process instance, identify the failing node, and explain the root cause from logs alone

Week 8: Scores at least 80 percent on a timed full-length practice set with no domain below 70 percent