I-CAR ProLevel Refinish study materials
I-CAR ProLevel Refinish study resources

I-CAR ProLevel Refinish study plan

I-CAR ProLevel Refinish · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Surface Preparation and Substrate Identification & Application Techniques and Coating Defect Prevention

  • Classify each substrate type (steel, aluminum, galvanized, plastic, SMC, OEM e-coat, prior refinish) and state the correct preparation sequence for each without notes

  • Map the full prep workflow from wash through final sand grit, listing the grit progression and why each step exists

  • Identify the three contamination classes (silicone/oil, moisture, dust/particulate) and name the removal method and failure symptom for each

  • Build a one-page decision tree for plastic part prep covering adhesion promoter versus no promoter by plastic family

  • Explain how surface prep errors surface later as defects such as peeling, solvent pop, and fish eyes

Your checkpoint

A written substrate-to-prep matrix covering at least 8 substrate types, self-scored at 90% or better against a checklist you build from the domain objectives

Week 2

Application Techniques and Coating Defect Prevention & Surface Preparation and Substrate Identification

  • Diagram each coating layer (primer, sealer, base, mid-coat, clear) and state the film-build target and dry-film tolerance for each

  • List the flash-time and recoat-window rules for the products in your shop and describe what happens when each is violated

  • Diagnose at least 10 named defects (solvent pop, runs, sags, mottling, die-back, orange peel, blisters, lifting, hazing, pinholing) by cause, prevention, and repair

  • Sequence a panel repair plan that avoids trapping solvents and respects recoat windows across three coats

  • Practice spray-gun distance, angle, and overlap on a test panel and record the pattern width and overlap percentage that produced a uniform film

Your checkpoint

A defect troubleshooting table with 10+ defects, each with cause, prevention, and repair, plus a photographed test panel showing an even, defect-free clear coat

Week 3

Color Matching, Mixing, and Tinting & Surface Preparation and Substrate Identification

  • Explain the three dimensions of color (hue, value, chroma) and demonstrate reading them on a color chip under controlled lighting

  • Perform a variant check procedure: locate the OEM color code, confirm the variant, and spray an outdoor spray-out card for comparison

  • Mix base coat to a stated ratio using a mixing bank or scale and verify the ratio math for a partial batch

  • Tint a mismatched batch toward the spray-out using the correct tint direction and record each tint addition

  • Identify the effect pigments (metallic, pearl, mica, tri-coat) and describe the spray technique each one demands

Your checkpoint

Three spray-out cards for one OEM color matched to a variant within an acceptable visual and spectrophotometer reading, with a tint log documenting each addition

Week 4

Refinish Safety, Health, and Environmental Compliance & Refinish Materials, Product Selection, and Documentation

  • Assemble the PPE required for isocyanate-containing clears, solvents, and sanding dust and state the cartridge or supplied-air requirement for each task

  • Explain the difference between a cartridge respirator and supplied-air and identify which tasks require supplied air

  • Outline the VOC and hazardous-waste handling rules that govern gun cleaning, solvent storage, and waste stream segregation

  • Read a product data sheet and safety data sheet and extract mix ratio, pot life, VOC content, and required PPE

  • Describe the documentation trail required for a repair: color code, product batch, mix ratio, and cure conditions

Your checkpoint

A completed mock job file for one repair containing the SDS/PDS extracts, PPE selection, waste disposal plan, and a written record of color code, batch numbers, and mix ratios

Week 5

Spray Equipment Setup, Operation, and Maintenance & Application Techniques and Coating Defect Prevention

  • Disassemble, clean, and reassemble a gravity-feed HVLP gun and identify each component and its failure mode

  • Set fluid tip, air cap, and inlet pressure for a primer, base, and clear application and record the settings

  • Diagnose spray pattern faults (split, crescent, heavy center, spitting) from the pattern shape and state the fix

  • Demonstrate proper gun cleaning and storage so the next session starts with a clean, correctly assembled gun

  • Apply a full wet coat and a tack coat on a test panel and compare film build, texture, and coverage

Your checkpoint

A gun setup and maintenance log for three products with recorded pressures, tip sizes, pattern test results, and a maintenance schedule

Week 6

Color Matching, Mixing, and Tinting & Application Techniques and Coating Defect Prevention

  • Blend a base coat into an adjacent panel so the transition is invisible under both shop and daylight lighting

  • Perform a panel repair from prep through clear on a scrap panel and self-evaluate against a defect checklist

  • Adjust for temperature and humidity by selecting the correct reducer and hardener speed and justify the choice

  • Correct a mottled or blotchy metallic repair and document the technique used to recover it

  • Compare a repair against a control panel under color-corrected light and record any remaining mismatch

Your checkpoint

One completed panel repair with before/after photos, a defect self-evaluation sheet, and a written justification of reducer and hardener selection

Week 7

Refinish Materials, Product Selection, and Documentation & Refinish Safety, Health, and Environmental Compliance

  • Select the correct primer, sealer, base, and clear system for three different substrate and job scenarios and justify each pick

  • Verify a product is compatible with the substrate and the existing finish before application and state what happens when it is not

  • Complete a full documentation packet for a repair including product selection rationale, VOC compliance, and waste handling

  • Explain warranty and OEM approval considerations that affect which products may be used on a given vehicle

  • Audit your own shop practices against the safety and environmental rules you studied and list any gaps

Your checkpoint

A product selection and documentation packet for three scenarios, each with product choice, compatibility check, VOC compliance note, and safety plan

Week 8

Surface Preparation and Substrate Identification & Color Matching, Mixing, and Tinting & Spray Equipment Setup, Operation, and Maintenance & Application Techniques and Coating Defect Prevention & Refinish Materials, Product Selection, and Documentation & Refinish Safety, Health, and Environmental Compliance

  • Complete a timed 60-question practice set across all six domains and score 85% or better

  • Review every missed question and write the underlying rule or procedure it tested

  • Re-run a full repair from prep through clear under time pressure and hit the defect-free standard

  • Recite the safety, PPE, and waste-handling rules from memory without notes

  • Build a one-page quick-reference sheet covering substrate prep, mix ratios, gun settings, and defect causes

Your checkpoint

A scored practice set of 60 questions at 85% or better plus a one-page final reference sheet and a written list of remaining weak areas with a remediation plan

Milestones

Week 2: Score 80% or better on a self-made 25-question quiz covering substrate identification, prep sequence, and defect causes; the defect table must cover 10 or more defects

Week 4: Explain aloud, without notes, the PPE and supplied-air requirements for isocyanate clear and the waste-handling rules for gun cleaning; the mock job file must be complete on all required documentation fields

Week 6: Complete a panel repair with no more than one minor defect and an invisible blend under daylight inspection; reducer and hardener choices must be justified in writing

Week 8: Score 85% or better on a timed 60-question mixed-domain practice set and complete a full timed repair that meets the defect-free standard