Permit Application Completeness
An application is complete when all required forms, plans, fees, and supporting documents are submitted; completeness review occurs before substantive plan review.
Permit Expiration
Under the IBC/IRC, a permit expires if work does not start within 180 days of issuance or if work is suspended for 180 days without an approved extension.
Certificate of Occupancy
Issued after final inspection confirms the building complies with approved plans and code; it authorizes occupancy and use of the structure.
Permit Fee Calculation
Fees are set by a local fee schedule, often based on project valuation, square footage, or fixture count, and are generally nonrefundable after review begins.
Stop-Work Order
A written directive halting construction when work is unsafe, unpermitted, or not in accordance with approved plans, remaining in effect until released by the code official.
Permit Technician Duties
Receiving applications, checking completeness, calculating fees, routing plans, tracking review status, and maintaining permit records, while referring code interpretations to the building official.
Inspection Request Process
The permit holder requests inspections from the code department, usually with advance notice, and must provide access to the work site at the scheduled time.
Police Power
The inherent authority of state and local governments to regulate private property and construction to protect public health, safety, and welfare.
Vested Rights
A property owner's right to complete development under the code in effect when a complete permit application is filed, provided the owner proceeds diligently.
Due Process in Enforcement
Before revoking a permit or imposing penalties, the government must provide adequate notice and a meaningful opportunity to be heard.
Board of Appeals
A local quasi-judicial body that hears appeals of building official decisions, interpretations, and certain variance requests within a specified filing period.
Ministerial versus Discretionary
Ministerial decisions apply fixed standards and leave little judgment; discretionary decisions involve judgment and are generally subject to appeal and due process.
Permit as License
A building permit authorizes construction but is not a property right; it can be revoked for fraud, abandonment, or failure to comply with code.
Governmental Immunity
A legal doctrine that can shield governments from certain tort claims arising from inspections or enforcement, with limits set by state law.
Rough-In Inspection
An inspection of electrical, plumbing, and mechanical systems after installation but before concealment by insulation, drywall, or concrete.
Correction Notice
A written record of code deficiencies found during inspection that specifies the required correction and typically requires a reinspection before work continues.
Notice of Violation
A formal document citing the code section violated, the corrective action required, and a deadline for compliance, with potential penalties for noncompliance.
Unsafe Structure
A building or structure that is dangerous to life or property and may be ordered repaired, vacated, or demolished by the code official after proper notice.
Right of Entry
The authority to inspect property, usually limited to reasonable times with consent; if refused, the jurisdiction may need a warrant or administrative search order.
Abatement Lien
A charge placed against a property to recover costs the government incurred for correcting a violation, such as demolition or weed removal, after notice and hearing.
Construction Documents
Drawings, specifications, calculations, and related documents that describe the proposed work and demonstrate compliance with the adopted codes.
Plan Review
The code official's review of construction documents for compliance with building, fire, accessibility, and energy codes before a permit is issued.
Deferred Submittal
A portion of the design, such as trusses or fire sprinkler systems, approved for later submission and review after the main permit is issued.
Sealed Plans
Construction drawings signed and stamped by a licensed design professional as required by state law, indicating responsibility for the design.
As-Built Drawings
Revised drawings showing the actual constructed conditions, dimensions, and changes, used for records, operations, and future renovations.
Plan Revision
A change to approved construction documents that must be submitted for review and approval before the changed work is constructed.
Nonconforming Use
A lawfully established use that no longer conforms to current zoning but may continue, subject to limits on expansion, reconstruction, or discontinuance.
Variance
Administrative relief from a dimensional zoning standard granted when strict application would cause undue hardship and the request meets legal criteria.
Conditional Use Permit
A permit allowing a use listed in the zoning ordinance only after review and with conditions to mitigate impacts on surrounding properties.
Floor Area Ratio
The ratio of a building's total floor area to the lot area, used to regulate development intensity; for example, 2.0 allows twice the lot area.
Setback
The minimum required distance between a building or structure and a property line, street, or other specified line, measured per zoning regulations.
Site Plan Review
A review process evaluating a development's layout, parking, access, drainage, landscaping, and utilities for compliance with zoning and development standards.