Mixed-Use Building with Basement Storage in Flood Zone

ICC 64 · Put your knowledge to work in context.

All case studies

Mixed-Use Building with Basement Storage in Flood Zone

A developer submits plans for a three-story mixed-use building with a basement. The first floor is mercantile (M) with 8,000 sq ft, the second floor is business (B) with 6,000 sq ft, and the third floor contains four apartments (R-2). The building is Type III-B construction and sprinklered. The site is in a Special Flood Hazard Area (Zone AE) with a base flood elevation of 12 feet above datum. The basement is proposed for storage for the mercantile tenant, with an occupant load of 10. The basement is 2,000 sq ft and has one exit stairway. The developer wants to know if the basement storage is allowed and what code requirements apply. The building official must evaluate occupancy classification, flood-resistant construction, and egress. The basement floor is at 8 feet above datum, below the base flood elevation. The developer argues that because the basement is only storage, floodproofing is not needed. The official must determine compliance.

1. Classify the building's occupancy and determine whether the basement storage is permitted under the mercantile occupancy.

Read the worked answer

The building is a mixed-occupancy building with M, B, and R-2 occupancies. The basement storage is incidental to the mercantile occupancy and may be classified as an accessory storage area under IBC Section 508.2, provided it does not exceed the allowable area and is not a hazardous occupancy. Because the basement is a story, it must be included in the building height and area calculations. The storage area with an occupant load of 10 is low-hazard and may be permitted under the M occupancy if it is separated by a fire barrier as required for incidental uses. The building official should verify that the basement does not create a separate occupancy classification that would require additional separation. The storage is allowed in concept, but the official must evaluate egress and flood provisions before approval.

2. What flood-resistant construction requirements apply to the basement storage and the building?

Read the worked answer

Because the site is in Zone AE with a base flood elevation of 12 feet, the building must comply with flood-resistant construction requirements. The basement floor at 8 feet is below the base flood elevation, so it cannot be used for storage unless it is dry floodproofed to prevent floodwater entry and structural damage. The developer’s argument that storage does not need floodproofing is incorrect; the code requires all portions of the building below the base flood elevation to be protected. For a mixed-use building with residential occupancies on the third floor, the residential portion must be elevated above the base flood elevation. The basement storage may be allowed only if it is dry floodproofed with flood vents, impermeable walls, and a floodproofing certificate prepared by a registered design professional. The building official should require an elevation certificate and floodproofing design before issuing a permit.

3. What egress requirements apply to the basement storage, and should the official require a second exit?

Read the worked answer

For an occupant load of 10, one exit is generally permitted under IBC Table 1006.3.2 if the exit is a door or stairway of at least 36 inches clear width and the travel distance to the exit is within the maximum allowed. The building is sprinklered, so the common path of egress travel may be up to 100 feet. However, the single exit stairway must be enclosed with 1-hour fire-resistance-rated construction and must lead directly to the exterior without passing through the floor above. The official should verify that the stairway discharges to a public way and that the basement storage does not contain hazardous materials that would require a second exit. If the storage is used for combustible materials or exceeds the incidental use limits, a second exit may be required. The official should require a code analysis to confirm that one exit is adequate for the proposed use.