ICC 64 · Give each week a clear focus.
8 weeks · About 7 hours per week
General Building Code Knowledge & Fire and Life Safety Requirements
Map the structure of the International Code Council code family and state which volume governs building, fire, and referenced standards
Define occupancy classification categories and match five sample building descriptions to the correct group and subgroup
Explain how the code establishes minimum fire and life safety requirements through occupancy-based thresholds rather than one-size-fits-all rules
Build a personal index of the ten code chapters most frequently tested and note the type of question each supports
Solve 30 mixed recall questions covering code scope, occupancy groups, and fire safety fundamentals, logging every miss with the governing concept
Your checkpoint
A one-page occupancy decision tree plus a 30-question error log with a written correction note for each miss
Fire and Life Safety Requirements & Building Planning and Occupancy Classification
Distinguish the three elements of the means of egress and apply occupant load factors to calculate required egress width for three sample occupancies
Compare required number of exits, travel distance, and common path limits across at least four occupancy groups
Identify when fire resistance rated construction, separations, and opening protectives are triggered by occupancy and height
Trace how a building's occupancy classification drives its allowable height and area rather than treating them as independent topics
Complete 40 practice questions on egress and fire resistance, rewriting each missed item as a rule statement in your own words
Your checkpoint
A worked egress calculation sheet for three occupancies showing occupant load, exit count, and width, with all arithmetic shown
Building Planning and Occupancy Classification & Structural and Nonstructural Provisions
Apply the height and area allowance tables to determine permitted building size for a given construction type and frontage condition
Classify the five construction types by their structural fire resistance and describe what each permits in height and area
Explain how incidental uses, mixed occupancies, and accessory occupancies are treated differently under the code
Describe the nonstructural provisions covering interior finishes, flame spread, and smoke developed ratings and where each applies
Answer 40 questions on construction type and height and area, recording the specific table or section logic behind each correct answer
Your checkpoint
A comparison grid of the five construction types showing permitted height, area, and typical structural materials, with a short note on frontage increase calculation
Structural and Nonstructural Provisions & General Building Code Knowledge
Summarize the structural loading provisions for dead, live, wind, seismic, and snow loads and identify which referenced standard governs each
Explain how the code delegates detailed structural design to referenced standards and what the adopting jurisdiction still enforces
Describe the requirements for structural observation, special inspection, and testing of concrete and structural steel
List the accessibility provisions that intersect with structural and nonstructural work, including accessible routes and clear floor space
Complete 40 questions spanning structural loads, inspections, and accessibility, and rank your confidence per subtopic
Your checkpoint
A two-page structural and nonstructural summary sheet organized by load type and inspection trigger, with confidence ratings per subtopic
Administration, Enforcement, and Inspection Procedures & Fire and Life Safety Requirements
Outline the permit application, plan review, and issuance sequence and state what documents and information each step requires
Describe the inspection stages a typical commercial project passes through and what the inspector verifies at each
Explain the certificate of occupancy process, including conditions, temporary certificates, and change of use implications
Identify the enforcement tools available for violations and how stop work orders and notices of correction differ
Answer 40 questions on administration and enforcement, writing the procedural sequence from memory before checking your answer
Your checkpoint
A one-page permit-to-occupancy process flow with the inspection hold points marked and the enforcement action tied to each failure mode
General Building Code Knowledge & Fire and Life Safety Requirements & Administration, Enforcement, and Inspection Procedures
Revisit every domain with a timed 50-question mixed set and record per-domain accuracy
Diagnose your three weakest subtopics and write a targeted rule card for each with the code logic, not just the answer
Practice reading code-style language so you can identify the operative condition in a long question stem within 30 seconds
Review fire protection systems requirements including sprinkler thresholds, standpipes, and fire alarm activation logic
Reconcile your error log from weeks 1 through 5 and confirm no repeated mistake pattern remains unresolved
Your checkpoint
A scored 50-question diagnostic with per-domain accuracy percentages and three rule cards for the weakest subtopics
Building Planning and Occupancy Classification & Structural and Nonstructural Provisions & Administration, Enforcement, and Inspection Procedures
Complete two full-length timed practice exams under exam conditions and record timing per question
Analyze every wrong answer to classify the cause as knowledge gap, misread stem, or calculation error
Drill the calculation types that appear most often, including occupant load, egress width, and height and area allowances
Review administration scenarios where the correct answer depends on sequencing or jurisdiction authority rather than a numeric threshold
Reduce average time per question while holding or improving accuracy on the second full-length attempt
Your checkpoint
Two completed timed exams with a cause-of-error analysis table and a documented time-per-question trend
General Building Code Knowledge & Building Planning and Occupancy Classification & Fire and Life Safety Requirements & Structural and Nonstructural Provisions & Administration, Enforcement, and Inspection Procedures
Consolidate all rule cards and summary sheets into a single review packet organized by domain
Re-drill only the missed items from weeks 6 and 7 until each is answered correctly twice in a row
Take one final timed exam and confirm every domain meets your target accuracy threshold
Write a pre-exam checklist covering code volumes allowed, calculator use, time allocation, and question-skipping strategy
Complete a final pass of the occupancy decision tree and construction type grid to confirm recall without notes
Your checkpoint
A consolidated review packet plus a final timed exam scorecard showing accuracy by domain against your target threshold
Milestones
Week 2: You can assign an occupancy group and calculate occupant load and egress width for an unfamiliar building description without consulting notes
Week 4: You can state the permitted height and area for a given construction type and explain which variable drives the limit, scoring at least 70 percent on the week 3 and 4 practice sets
Week 6: Mixed-set accuracy reaches at least 70 percent overall with no single domain below 60 percent
Week 7: Both full-length timed exams are completed within the time limit, and second-attempt accuracy exceeds the first by at least five percentage points
Week 8: Final timed exam shows at least 75 percent accuracy in every domain and all previously missed items are cleared on a repeat attempt