ICC 75 study plan
ICC 75 · Give each week a clear focus.
8 weeks · About 7 hours per week
Codes and Standards
Map the code-development cycle from proposal through publication and explain how each stage changes what an inspector enforces
Distinguish prescriptive, performance, and referenced-standard provisions and classify 15 sample clauses by type
Build a personal index of the ten code chapters you expect to consult most often, listing the trigger question each answers
Define occupancy classification and construction type and explain how the two interact to set height and area limits
Your checkpoint
A one-page code navigation map: 10 chapters, the question each answers, and 15 sample clauses classified by provision type with a one-line justification each
Codes and Standards
Apply the height-and-area table logic to six worked examples and show each step of the calculation
Trace how a referenced standard enters enforcement and state the rule for editions and amendments
Explain the relationship between the code, the adopted local amendments, and any state-level code in force
Convert three common code thresholds into plain-language decision rules an inspector can apply on site
Your checkpoint
Six solved height-and-area worksheets with step-by-step arithmetic, plus a written decision rule for how referenced standards and local amendments are applied
Plan Review and Permitting
Assemble the complete submittal checklist for a commercial project from permit application through issuance
Sequence the plan review steps and identify which reviewer handles which discipline
Detect and correct five planted deficiencies in a self-authored sample plan set
Draft the written correction notice language for each deficiency, citing the code basis for each
Your checkpoint
A reusable submittal checklist plus five written correction notices, each with the deficiency, the code basis, and the resubmittal requirement
Plan Review and Permitting
Explain the process for handling plan revisions, deferred submittals, and phased permits
Determine when a field change requires a revised plan and when it can be handled as an approved field modification
Summarize the permit types, validity periods, and expiration rules you must track
Practice conducting a 30-minute plan review walkthrough out loud on a self-authored plan set
Your checkpoint
A two-page permit lifecycle summary (types, validity, revision handling, deferred submittals) plus a timed 30-minute mock plan review recorded against your own checklist
Inspection and Field Verification
Build the inspection sequence for a typical commercial build-out and name the hold points at which work cannot proceed
Distinguish approved, approved-as-noted, and denied outcomes and write the documentation for each
Identify the top ten field conditions that most often trigger a correction notice
Practice writing objective, non-argumentative inspection narratives that state the condition, the code basis, and the required action
Your checkpoint
A hold-point inspection sequence chart plus ten drafted inspection narratives covering the most common field corrections
Inspection and Field Verification
Apply sampling and verification techniques for concealed work and document what was verified versus what was assumed
Explain the process for handling a failed inspection, a re-inspection, and a stop-work order
Compare field-observed conditions against approved plans and list the discrepancies that require escalation
Rehearse the communication script for delivering an unfavorable inspection result to a contractor
Your checkpoint
A field discrepancy log with five entries showing observed condition, approved-plan reference, escalation decision, and outcome, plus a written re-inspection and stop-work procedure
Code Administration and Enforcement
Outline the enforcement ladder from verbal notice to citation and describe the trigger for each rung
Differentiate the roles of the code official, the board of appeals, and the courts in a dispute
Describe due-process requirements for notices, hearings, and appeal deadlines
Draft a complete notice of violation for a self-authored scenario, including the remedy and the deadline
Your checkpoint
A one-page enforcement ladder diagram with triggers, plus a complete drafted notice of violation for a self-authored scenario
Codes and Standards & Plan Review and Permitting & Inspection and Field Verification & Code Administration and Enforcement
Re-sit weak-topic drills drawn from your error log for each of the four domains
Complete two timed mixed-domain practice sets and score each by domain
Consolidate every error into a single review sheet and close out each gap with a written correction
Rehearse the exam-day routine: timing per question, flagging, and the pass to review flagged items
Your checkpoint
A scored error log across all four domains showing a target of 80 percent or better on both timed practice sets, with every missed item corrected in writing
Milestones
Week 2: Score 80 percent or better on a self-written 30-question codes and standards quiz, and correctly solve five of six height-and-area examples unaided
Week 4: Complete a full mock plan review using your own checklist within 45 minutes and produce written correction notices that cite a code basis for at least four of five planted deficiencies
Week 6: Produce ten inspection narratives that each state condition, code basis, and required action, and pass a peer or self-review rubric at 80 percent or better
Week 8: Score 80 percent or better on both timed mixed-domain practice sets and show a closed-out error log with no uncorrected items