ICC 75 study materials
ICC 75 study resources

ICC 75 study plan

ICC 75 · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Codes and Standards

  • Map the code-development cycle from proposal through publication and explain how each stage changes what an inspector enforces

  • Distinguish prescriptive, performance, and referenced-standard provisions and classify 15 sample clauses by type

  • Build a personal index of the ten code chapters you expect to consult most often, listing the trigger question each answers

  • Define occupancy classification and construction type and explain how the two interact to set height and area limits

Your checkpoint

A one-page code navigation map: 10 chapters, the question each answers, and 15 sample clauses classified by provision type with a one-line justification each

Week 2

Codes and Standards

  • Apply the height-and-area table logic to six worked examples and show each step of the calculation

  • Trace how a referenced standard enters enforcement and state the rule for editions and amendments

  • Explain the relationship between the code, the adopted local amendments, and any state-level code in force

  • Convert three common code thresholds into plain-language decision rules an inspector can apply on site

Your checkpoint

Six solved height-and-area worksheets with step-by-step arithmetic, plus a written decision rule for how referenced standards and local amendments are applied

Week 3

Plan Review and Permitting

  • Assemble the complete submittal checklist for a commercial project from permit application through issuance

  • Sequence the plan review steps and identify which reviewer handles which discipline

  • Detect and correct five planted deficiencies in a self-authored sample plan set

  • Draft the written correction notice language for each deficiency, citing the code basis for each

Your checkpoint

A reusable submittal checklist plus five written correction notices, each with the deficiency, the code basis, and the resubmittal requirement

Week 4

Plan Review and Permitting

  • Explain the process for handling plan revisions, deferred submittals, and phased permits

  • Determine when a field change requires a revised plan and when it can be handled as an approved field modification

  • Summarize the permit types, validity periods, and expiration rules you must track

  • Practice conducting a 30-minute plan review walkthrough out loud on a self-authored plan set

Your checkpoint

A two-page permit lifecycle summary (types, validity, revision handling, deferred submittals) plus a timed 30-minute mock plan review recorded against your own checklist

Week 5

Inspection and Field Verification

  • Build the inspection sequence for a typical commercial build-out and name the hold points at which work cannot proceed

  • Distinguish approved, approved-as-noted, and denied outcomes and write the documentation for each

  • Identify the top ten field conditions that most often trigger a correction notice

  • Practice writing objective, non-argumentative inspection narratives that state the condition, the code basis, and the required action

Your checkpoint

A hold-point inspection sequence chart plus ten drafted inspection narratives covering the most common field corrections

Week 6

Inspection and Field Verification

  • Apply sampling and verification techniques for concealed work and document what was verified versus what was assumed

  • Explain the process for handling a failed inspection, a re-inspection, and a stop-work order

  • Compare field-observed conditions against approved plans and list the discrepancies that require escalation

  • Rehearse the communication script for delivering an unfavorable inspection result to a contractor

Your checkpoint

A field discrepancy log with five entries showing observed condition, approved-plan reference, escalation decision, and outcome, plus a written re-inspection and stop-work procedure

Week 7

Code Administration and Enforcement

  • Outline the enforcement ladder from verbal notice to citation and describe the trigger for each rung

  • Differentiate the roles of the code official, the board of appeals, and the courts in a dispute

  • Describe due-process requirements for notices, hearings, and appeal deadlines

  • Draft a complete notice of violation for a self-authored scenario, including the remedy and the deadline

Your checkpoint

A one-page enforcement ladder diagram with triggers, plus a complete drafted notice of violation for a self-authored scenario

Week 8

Codes and Standards & Plan Review and Permitting & Inspection and Field Verification & Code Administration and Enforcement

  • Re-sit weak-topic drills drawn from your error log for each of the four domains

  • Complete two timed mixed-domain practice sets and score each by domain

  • Consolidate every error into a single review sheet and close out each gap with a written correction

  • Rehearse the exam-day routine: timing per question, flagging, and the pass to review flagged items

Your checkpoint

A scored error log across all four domains showing a target of 80 percent or better on both timed practice sets, with every missed item corrected in writing

Milestones

Week 2: Score 80 percent or better on a self-written 30-question codes and standards quiz, and correctly solve five of six height-and-area examples unaided

Week 4: Complete a full mock plan review using your own checklist within 45 minutes and produce written correction notices that cite a code basis for at least four of five planted deficiencies

Week 6: Produce ten inspection narratives that each state condition, code basis, and required action, and pass a peer or self-review rubric at 80 percent or better

Week 8: Score 80 percent or better on both timed mixed-domain practice sets and show a closed-out error log with no uncorrected items