Financial Policy and Corporate Strategy
Financial policy sets the firm's target capital structure, dividend policy, and investment hurdle rate; strategy sets product-market scope. Policy must fund strategy without breaching debt covenants.
WACC = (E/V)·Ke + (D/V)·Kd·(1−t). Use marginal (target-weight) costs, not book values, for investment appraisal.
Value creation test: ROIC > WACC creates economic profit; growth adds value only when the spread is positive. Economic Profit = Invested Capital × (ROIC − WACC).
Pecking order: internal funds first, then debt, then equity, reflecting asymmetric information and issue costs.
Dividend irrelevance (Modigliani–Miller) holds only in perfect markets; with taxes and flotation costs, payout policy affects value through clientele and signalling effects.
Sustainable growth rate g = ROE × retention ratio b, where b = 1 − dividend payout. Growth above g requires external equity or higher leverage.
Agency costs of free cash flow: high payout or debt discipline reduces managerial slack; Jensen's control hypothesis favours debt for mature cash-generative firms.
Strategy frameworks: Porter's five forces for industry attractiveness, value chain for cost/ differentiation positioning, BCG matrix for portfolio resource allocation.
Risk Management
Risk types: market (price, FX, interest rate), credit (default, migration), liquidity (funding vs. asset), operational, and strategic. Each requires a distinct measurement approach.
VaR at confidence c: the loss L such that P(loss > L) = 1 − c. Parametric VaR = z·σ·√h for a single position; portfolio VaR needs the covariance matrix.
Expected Shortfall (CVaR) = average loss beyond VaR; it is sub-additive and coherent, unlike VaR, which can violate sub-additivity.
Duration-based interest rate exposure: ΔP ≈ −D·P·Δy/(1+y) plus convexity term ½·C·P·(Δy)².
Credit risk: Expected Loss = PD × LGD × EAD. Unexpected loss drives economic capital; RWA under Basel uses IRB or standardised approaches.
Operational risk capital under Basel: Basic Indicator (15% of gross income), Standardised (business-line betas), or Advanced Measurement Approach.
Hedging decision rule: hedge when reduction in expected financial distress and agency costs exceeds hedging cost and lost upside; natural hedges (matching currency/ duration) precede derivatives.
Stress testing complements VaR by specifying scenario shocks (rate +200bp, FX −20%) and recomputing P&L, capturing tail and liquidity effects VaR misses.
Security Analysis and Valuation
Dividend discount model: P0 = D1/(Ke − g); Gordon growth requires g < Ke and stable payout. Two-stage or H-model handles transition growth.
Free cash flow to firm: FCFF = EBIT(1−t) + D&A − Capex − ΔNWC. Enterprise value = Σ FCFF/(1+WACC)^t + terminal value.
Free cash flow to equity: FCFE = FCFF − interest(1−t) + net borrowing. Discount at Ke to get equity value directly.
Terminal value (Gordon) = FCFF_{n+1}/(WACC − g); the terminal growth rate must not exceed long-run nominal GDP growth.
Relative valuation: P/E, EV/EBITDA, P/B, P/S. Choose multiples matching the value driver (earnings growth, margin, ROE); adjust for leverage when comparing EV multiples.
CAPM: Ke = Rf + β(Rm − Rf). Unlever β with Hamada: βL = βU[1 + (1−t)D/E] before relevering to target structure.
Bond valuation: price = Σ coupon/(1+y)^t + face/(1+y)^n. YTM solves price = PV; duration and convexity measure price sensitivity.
Residual income model: V0 = B0 + Σ (ROE − Ke)·B_{t−1}/(1+Ke)^t. Useful when FCF is negative or unstable.
Portfolio Management
Portfolio expected return = Σ w_i·E(R_i). Portfolio variance = wᵀΣw; diversification reduces variance but not systematic risk.
Two-asset variance: σp² = w1²σ1² + w2²σ2² + 2w1w2ρσ1σ2. Minimum-variance weights depend on ρ and individual σ.
Efficient frontier: locus of maximum return for each risk level. The tangency portfolio with the risk-free asset is the optimal risky portfolio (Sharpe-maximising).
Sharpe ratio = (Rp − Rf)/σp. Treynor = (Rp − Rf)/βp. Jensen's alpha = Rp − [Rf + β(Rm − Rf)].
CAPM equilibrium: all investors hold the market portfolio; expected excess return is proportional to beta. Fama-French adds size (SMB) and value (HML) factors.
Performance attribution decomposes active return into asset allocation, security selection, and interaction effects.
Bond portfolio duration = weighted average of individual durations; immunisation matches duration and convexity of assets and liabilities.
Rebalancing rule: calendar (periodic) vs. threshold (band) rebalancing. Threshold rebalancing controls tracking error and transaction costs better in trending markets.
Securitisation and Derivatives
Securitisation: pool assets (mortgages, receivables) into an SPV, issue tranched securities. True sale and bankruptcy remoteness isolate pool from originator credit.
Credit tranching: senior, mezzanine, equity. Losses absorb bottom-up; subordination and overcollateralisation provide credit enhancement.
Prepayment risk: PSA model scales CPR; extension risk when rates rise, contraction risk when rates fall. Pass-through securities carry both.
Forward price: F = S0·e^{(r−q)T} for a dividend yield q; for FX, F = S0·e^{(r_d − r_f)T}.
Black-Scholes: C = S·N(d1) − K·e^{−rT}·N(d2), d1 = [ln(S/K) + (r + σ²/2)T]/(σ√T), d2 = d1 − σ√T.
Put-call parity (European): C − P = S − K·e^{−rT}. Violation permits arbitrage via synthetic positions.
Greeks: delta (hedge ratio), gamma (delta curvature), vega (volatility sensitivity), theta (time decay), rho (rate sensitivity). Delta-neutral hedges need gamma monitoring.
Interest rate swap: exchange fixed for floating; value = PV of fixed leg − PV of floating leg. Swap fixed rate sets both legs to par at inception.
Foreign Exchange Exposure and Risk Management
Transaction exposure: known foreign-currency cash flows. Translation exposure: accounting restatement of foreign subsidiary balance sheets. Economic exposure: long-run effect of rate changes on competitive position.
PPP: absolute S = P_d/P_f; relative version predicts exchange rate change ≈ inflation differential. Fisher effect links nominal rates to expected inflation.
International Fisher effect: interest rate differential equals expected spot change; combined with PPP gives forward premium ≈ interest differential.
Covered interest parity: F/S = (1 + r_d)/(1 + r_f). Deviation creates covered arbitrage; transaction costs and capital controls explain persistent small deviations.
Hedging tools: forward contract (locks rate, no premium), money market hedge (borrow/invest + spot), currency futures (standardised, margined), options (premium, upside retained), currency swap.
Option hedge decision: compare forward rate to expected future spot; hedge with options when the currency exposure is contingent (e.g., bidding for a foreign contract).
Translation methods: current rate (all assets/liabilities at closing rate), temporal (monetary at current, non-monetary at historical). Choice affects reported gains/losses.
Leading and lagging: accelerate receivables/ delay payables in weakening currency; netting and matching reduce gross exposure across subsidiaries.
International Financial Management
International capital budgeting: discount foreign-currency cash flows at the foreign WACC, then translate at the spot rate; or translate at forward rates and discount at home WACC. Results match under parity.
Adjusted present value for foreign projects: APV = base-case NPV + PV of financing side effects (subsidised loans, tax shields, concessionary debt).
Political risk mitigation: investment insurance (MIGA), joint ventures with local partners, local debt financing, structured exit options, and bilateral investment treaties.
Cost of capital internationally: add country risk premium to Ke; relever beta to local market. Segmented vs. integrated market affects whether global or local beta applies.
Foreign tax credit and transfer pricing: double taxation relief through credit or exemption; arm's-length pricing avoids transfer-pricing penalties.
International cash management: multilateral netting, centralised pooling, leading/lagging, and target cash balances per currency to minimise transaction and opportunity costs.
Cross-border leasing and project finance: non-recourse SPV, debt-service coverage ratio (DSCR) covenants, and political risk guarantees from export credit agencies.
Eurocurrency markets: deposits/loans outside the currency's home country; LIBOR/SOFR transition moved benchmarks to risk-free overnight rates.
Mergers, Acquisitions and Corporate Restructuring
Synergy value = V_AB − (V_A + V_B). Acquisition premium = offer price − target pre-announcement price. Acquirer gain = synergy − premium.
Payment method: cash transfers all synergy to target (fixed price); stock sharing dilutes acquirer EPS and shares risk; mixed consideration balances control and risk.
EPS impact: accretion if target P/E < acquirer P/E in an all-stock deal (before synergies); dilution if target P/E is higher.
Exchange ratio in stock deal = offer price per target share / acquirer share price. Post-merger EPS = combined earnings / combined shares.
Defence tactics: poison pills, staggered boards, golden parachutes, white knights, pac-man defence, greenmail. Hostile bids often succeed when premium exceeds defence cost.
Valuation approaches: DCF, comparable companies, comparable transactions, LBO analysis, and sum-of-the-parts for conglomerates.
Divestitures and spin-offs: carve-out (IPO of subsidiary stake), spin-off (pro-rata distribution, tax-free if conditions met), split-off (shareholder choice), tracking stock.
Leveraged buyout: high debt, management equity, exit via IPO or sale. Returns driven by deleveraging, EBITDA growth, and multiple expansion.
Startup Finance and Private Equity / Venture Capital
Venture capital method: exit value × ownership = terminal value; discount at target IRR (30–60% for early stage) to get post-money; pre-money = post-money − investment.
Pre-money and post-money: post-money = pre-money + investment. Founder dilution = investment / post-money.
Ownership target = investment / post-money valuation. Convertible notes convert at discount or valuation cap; SAFEs have no interest or maturity.
VC term sheet terms: liquidation preference (1x non-participating vs. participating), anti-dilution (full ratchet vs. broad-based weighted average), board seats, pro-rata rights, vesting.
Private equity fund structure: LP/GP, 2/20 fee model (management fee 1.5–2%, carried interest 20%), hurdle rate 8%, catch-up clause, 10-year fund life with extensions.
J-curve: early negative returns from fees and unrealised investments, then gains as exits occur. IRR overstates early-stage returns; use TVPI, DPI, and PME.
Stage financing: seed, Series A/B/C, growth, mezzanine, buyout. Each round prices risk and dilutes founders; milestone-based tranching reduces agency risk.
Exit routes: IPO, trade sale, secondary sale, buyback, write-off. Expected exit value and exit multiple drive VC valuation sensitivity.
Business Valuation
Three approaches: income (DCF, capitalised earnings), market (multiples, transaction comps), and asset-based (book, replacement, liquidation). Use triangulation.
DCF steps: forecast FCFF, compute WACC, discount, add terminal value, subtract net debt, divide by shares. Terminal value typically 50–75% of total value.
WACC with target weights: WACC = (E/V)·Ke + (D/V)·Kd·(1−t). Use market values and target capital structure.
Multiples selection: EV/EBITDA for capital-intensive, P/E for financial firms, P/B for banks, EV/Sales for high-growth/low-margin. Apply to forward, not trailing, metrics where possible.
Control premium and marketability discount: controlling interests command premiums (20–40%); minority stakes in private firms face DLOM (20–30%).
Normalised earnings: adjust for owner compensation, non-recurring items, related-party transactions, and one-time gains.
Asset-based valuation: adjusted book value restates assets to fair value; liquidation value assumes forced sale; replacement cost estimates new-build cost.
Valuation date and premise: going concern vs. liquidation; fair value vs. investment value vs. market value. Document assumptions and sensitivity ranges.
Financial Policy and Corporate Strategy
Financial policy sets the firm's target capital structure, dividend policy, and investment hurdle rate; strategy sets product-market scope. Policy must fund strategy without breaching debt covenants.
WACC = (E/V)·Ke + (D/V)·Kd·(1−t). Use marginal (target-weight) costs, not book values, for investment appraisal.
Value creation test: ROIC > WACC creates economic profit; growth adds value only when the spread is positive. Economic Profit = Invested Capital × (ROIC − WACC).
Pecking order: internal funds first, then debt, then equity, reflecting asymmetric information and issue costs.
Dividend irrelevance (Modigliani–Miller) holds only in perfect markets; with taxes and flotation costs, payout policy affects value through clientele and signalling effects.
Sustainable growth rate g = ROE × retention ratio b, where b = 1 − dividend payout. Growth above g requires external equity or higher leverage.
Agency costs of free cash flow: high payout or debt discipline reduces managerial slack; Jensen's control hypothesis favours debt for mature cash-generative firms.
Strategy frameworks: Porter's five forces for industry attractiveness, value chain for cost/differentiation positioning, BCG matrix for portfolio resource allocation.
Risk Management
Risk types: market (price, FX, interest rate), credit (default, migration), liquidity (funding vs. asset), operational, and strategic. Each requires a distinct measurement approach.
VaR at confidence c: the loss L such that P(loss > L) = 1 − c. Parametric VaR = z·σ·√h for a single position; portfolio VaR needs the covariance matrix.
Expected Shortfall (CVaR) = average loss beyond VaR; it is sub-additive and coherent, unlike VaR, which can violate sub-additivity.
Duration-based interest rate exposure: ΔP ≈ −D·P·Δy/(1+y) plus convexity term ½·C·P·(Δy)².
Credit risk: Expected Loss = PD × LGD × EAD. Unexpected loss drives economic capital; RWA under Basel uses IRB or standardised approaches.
Operational risk capital under Basel: Basic Indicator (15% of gross income), Standardised (business-line betas), or Advanced Measurement Approach.
Hedging decision rule: hedge when reduction in expected financial distress and agency costs exceeds hedging cost and lost upside; natural hedges (matching currency/duration) precede derivatives.
Stress testing complements VaR by specifying scenario shocks (rate +200bp, FX −20%) and recomputing P&L, capturing tail and liquidity effects VaR misses.
Security Analysis and Valuation
Dividend discount model: P0 = D1/(Ke − g); Gordon growth requires g < Ke and stable payout. Two-stage or H-model handles transition growth.
Free cash flow to firm: FCFF = EBIT(1−t) + D&A − Capex − ΔNWC. Enterprise value = Σ FCFF/(1+WACC)^t + terminal value.
Free cash flow to equity: FCFE = FCFF − interest(1−t) + net borrowing. Discount at Ke to get equity value directly.
Terminal value (Gordon) = FCFF_{n+1}/(WACC − g); the terminal growth rate must not exceed long-run nominal GDP growth.
Relative valuation: P/E, EV/EBITDA, P/B, P/S. Choose multiples matching the value driver (earnings growth, margin, ROE); adjust for leverage when comparing EV multiples.
CAPM: Ke = Rf + β(Rm − Rf). Unlever β with Hamada: βL = βU[1 + (1−t)D/E] before relevering to target structure.
Bond valuation: price = Σ coupon/(1+y)^t + face/(1+y)^n. YTM solves price = PV; duration and convexity measure price sensitivity.
Residual income model: V0 = B0 + Σ (ROE − Ke)·B_{t−1}/(1+Ke)^t. Useful when FCF is negative or unstable.
Portfolio Management
Portfolio expected return = Σ w_i·E(R_i). Portfolio variance = wᵀΣw; diversification reduces variance but not systematic risk.
Two-asset variance: σp² = w1²σ1² + w2²σ2² + 2w1w2ρσ1σ2. Minimum-variance weights depend on ρ and individual σ.
Efficient frontier: locus of maximum return for each risk level. The tangency portfolio with the risk-free asset is the optimal risky portfolio (Sharpe-maximising).
Sharpe ratio = (Rp − Rf)/σp. Treynor = (Rp − Rf)/βp. Jensen's alpha = Rp − [Rf + β(Rm − Rf)].
CAPM equilibrium: all investors hold the market portfolio; expected excess return is proportional to beta. Fama-French adds size (SMB) and value (HML) factors.
Performance attribution decomposes active return into asset allocation, security selection, and interaction effects.
Bond portfolio duration = weighted average of individual durations; immunisation matches duration and convexity of assets and liabilities.
Rebalancing rule: calendar (periodic) vs. threshold (band) rebalancing. Threshold rebalancing controls tracking error and transaction costs better in trending markets.
Securitisation and Derivatives
Securitisation: pool assets (mortgages, receivables) into an SPV, issue tranched securities. True sale and bankruptcy remoteness isolate pool from originator credit.
Credit tranching: senior, mezzanine, equity. Losses absorb bottom-up; subordination and overcollateralisation provide credit enhancement.
Prepayment risk: PSA model scales CPR; extension risk when rates rise, contraction risk when rates fall. Pass-through securities carry both.
Forward price: F = S0·e^{(r−q)T} for a dividend yield q; for FX, F = S0·e^{(r_d − r_f)T}.
Black-Scholes: C = S·N(d1) − K·e^{−rT}·N(d2), d1 = [ln(S/K) + (r + σ²/2)T]/(σ√T), d2 = d1 − σ√T.
Put-call parity (European): C − P = S − K·e^{−rT}. Violation permits arbitrage via synthetic positions.
Greeks: delta (hedge ratio), gamma (delta curvature), vega (volatility sensitivity), theta (time decay), rho (rate sensitivity). Delta-neutral hedges need gamma monitoring.
Interest rate swap: exchange fixed for floating; value = PV of fixed leg − PV of floating leg. Swap fixed rate sets both legs to par at inception.
Foreign Exchange Exposure and Risk Management
Transaction exposure: known foreign-currency cash flows. Translation exposure: accounting restatement of foreign subsidiary balance sheets. Economic exposure: long-run effect of rate changes on competitive position.
PPP: absolute S = P_d/P_f; relative version predicts exchange rate change ≈ inflation differential. Fisher effect links nominal rates to expected inflation.
International Fisher effect: interest rate differential equals expected spot change; combined with PPP gives forward premium ≈ interest differential.
Covered interest parity: F/S = (1 + r_d)/(1 + r_f). Deviation creates covered arbitrage; transaction costs and capital controls explain persistent small deviations.
Hedging tools: forward contract (locks rate, no premium), money market hedge (borrow/invest + spot), currency futures (standardised, margined), options (premium, upside retained), currency swap.
Option hedge decision: compare forward rate to expected future spot; hedge with options when the currency exposure is contingent (e.g., bidding for a foreign contract).
Translation methods: current rate (all assets/liabilities at closing rate), temporal (monetary at current, non-monetary at historical). Choice affects reported gains/losses.
Leading and lagging: accelerate receivables/delay payables in weakening currency; netting and matching reduce gross exposure across subsidiaries.
International Financial Management
International capital budgeting: discount foreign-currency cash flows at the foreign WACC, then translate at the spot rate; or translate at forward rates and discount at home WACC. Results match under parity.
Adjusted present value for foreign projects: APV = base-case NPV + PV of financing side effects (subsidised loans, tax shields, concessionary debt).
Political risk mitigation: investment insurance (MIGA), joint ventures with local partners, local debt financing, structured exit options, and bilateral investment treaties.
Cost of capital internationally: add country risk premium to Ke; relever beta to local market. Segmented vs. integrated market affects whether global or local beta applies.
Foreign tax credit and transfer pricing: double taxation relief through credit or exemption; arm's-length pricing avoids transfer-pricing penalties.
International cash management: multilateral netting, centralised pooling, leading/lagging, and target cash balances per currency to minimise transaction and opportunity costs.
Cross-border leasing and project finance: non-recourse SPV, debt-service coverage ratio (DSCR) covenants, and political risk guarantees from export credit agencies.
Eurocurrency markets: deposits/loans outside the currency's home country; LIBOR/SOFR transition moved benchmarks to risk-free overnight rates.
Mergers, Acquisitions and Corporate Restructuring
Synergy value = V_AB − (V_A + V_B). Acquisition premium = offer price − target pre-announcement price. Acquirer gain = synergy − premium.
Payment method: cash transfers all synergy to target (fixed price); stock sharing dilutes acquirer EPS and shares risk; mixed consideration balances control and risk.
EPS impact: accretion if target P/E < acquirer P/E in an all-stock deal (before synergies); dilution if target P/E is higher.
Exchange ratio in stock deal = offer price per target share / acquirer share price. Post-merger EPS = combined earnings / combined shares.
Defence tactics: poison pills, staggered boards, golden parachutes, white knights, pac-man defence, greenmail. Hostile bids often succeed when premium exceeds defence cost.
Valuation approaches: DCF, comparable companies, comparable transactions, LBO analysis, and sum-of-the-parts for conglomerates.
Divestitures and spin-offs: carve-out (IPO of subsidiary stake), spin-off (pro-rata distribution, tax-free if conditions met), split-off (shareholder choice), tracking stock.
Leveraged buyout: high debt, management equity, exit via IPO or sale. Returns driven by deleveraging, EBITDA growth, and multiple expansion.
Startup Finance and Private Equity / Venture Capital
Venture capital method: exit value × ownership = terminal value; discount at target IRR (30–60% for early stage) to get post-money; pre-money = post-money − investment.
Pre-money and post-money: post-money = pre-money + investment. Founder dilution = investment / post-money.
Ownership target = investment / post-money valuation. Convertible notes convert at discount or valuation cap; SAFEs have no interest or maturity.
VC term sheet terms: liquidation preference (1x non-participating vs. participating), anti-dilution (full ratchet vs. broad-based weighted average), board seats, pro-rata rights, vesting.
Private equity fund structure: LP/GP, 2/20 fee model (management fee 1.5–2%, carried interest 20%), hurdle rate 8%, catch-up clause, 10-year fund life with extensions.
J-curve: early negative returns from fees and unrealised investments, then gains as exits occur. IRR overstates early-stage returns; use TVPI, DPI, and PME.
Stage financing: seed, Series A/B/C, growth, mezzanine, buyout. Each round prices risk and dilutes founders; milestone-based tranching reduces agency risk.
Exit routes: IPO, trade sale, secondary sale, buyback, write-off. Expected exit value and exit multiple drive VC valuation sensitivity.
Business Valuation
Three approaches: income (DCF, capitalised earnings), market (multiples, transaction comps), and asset-based (book, replacement, liquidation). Use triangulation.
DCF steps: forecast FCFF, compute WACC, discount, add terminal value, subtract net debt, divide by shares. Terminal value typically 50–75% of total value.
WACC with target weights: WACC = (E/V)·Ke + (D/V)·Kd·(1−t). Use market values and target capital structure.
Multiples selection: EV/EBITDA for capital-intensive, P/E for financial firms, P/B for banks, EV/Sales for high-growth/low-margin. Apply to forward, not trailing, metrics where possible.
Control premium and marketability discount: controlling interests command premiums (20–40%); minority stakes in private firms face DLOM (20–30%).
Normalised earnings: adjust for owner compensation, non-recurring items, related-party transactions, and one-time gains.
Asset-based valuation: adjusted book value restates assets to fair value; liquidation value assumes forced sale; replacement cost estimates new-build cost.
Valuation date and premise: going concern vs. liquidation; fair value vs. investment value vs. market value. Document assumptions and sensitivity ranges.