CMA Inter Paper 12 Management Accounting key terms
CMA Inter Paper 12 Management Accounting · Get comfortable with the vocabulary.
- Contribution margin
- Related: Break-even point, Marginal costing, Profit-volume ratio
Sales revenue minus all variable costs. It shows how much each sale adds towards covering fixed costs and then generating profit, and it is the core measure used in marginal costing and CVP analysis.
- Break-even point
- Related: Contribution margin, Margin of safety, Profit-volume ratio
The level of sales, in units or value, at which total contribution exactly equals total fixed costs, so profit is zero. It marks where the organisation moves from loss into profit.
- Margin of safety
- Related: Break-even point, Profit-volume ratio, Sensitivity analysis
The amount by which budgeted or actual sales exceed break-even sales, expressed in units, revenue or as a percentage. It measures how far sales can fall before a loss is incurred.
- Profit-volume ratio
- Related: Contribution margin, Break-even point, Margin of safety
Contribution divided by sales revenue, expressed as a percentage. It indicates the proportion of each rupee of sales available to cover fixed costs and profit, and is used to compute break-even revenue.
- Marginal costing
- Related: Absorption costing, Contribution margin, Relevant cost
A costing method in which only variable production costs are treated as product cost, while fixed costs are written off against contribution in the period incurred. It supports short-term decisions and CVP analysis.
- Absorption costing
- Related: Marginal costing, Overhead absorption rate, Reconciliation of profits
A costing method that assigns both variable and fixed production costs to units produced, so fixed overhead is carried in inventory until the goods are sold. Profit therefore depends partly on production volume.
- Overhead absorption rate
- Related: Absorption costing, Over- and under-absorption, Flexible budget
The predetermined rate used to charge fixed and variable production overhead into product cost, usually total budgeted overhead divided by a budgeted base such as labour hours or machine hours.
- Over- and under-absorption
- Related: Overhead absorption rate, Fixed overhead volume variance
The difference between overhead actually incurred and overhead absorbed into production using the predetermined rate. Over-absorption means too much was charged to products; under-absorption means too little was charged.
- Reconciliation of profits
- Related: Marginal costing, Absorption costing, Overhead absorption rate
A statement explaining the difference between marginal costing profit and absorption costing profit, usually by the change in inventory volume multiplied by the fixed overhead absorption rate per unit.
- Relevant cost
- Related: Opportunity cost, Avoidable cost, Sunk cost
A future, incremental cash flow that differs between the alternatives being considered. Costs that are sunk, committed or identical under every option are irrelevant and must be excluded from the decision.
- Opportunity cost
- Related: Relevant cost, Limiting factor, Make-or-buy decision
The contribution or benefit forgone by using a scarce resource in one way rather than in its next best alternative. It is a relevant cost even though no cash payment appears in the accounts.
- Sunk cost
- Related: Relevant cost, Committed cost
A cost already incurred by a past decision that cannot be changed by any future action. It is never relevant to a decision and should be ignored, however large it appears.
- Committed cost
- Related: Sunk cost, Discretionary cost, Fixed cost
A fixed cost arising from a past decision to acquire capacity, such as factory rent or a lease, which cannot be altered in the short term. It is generally irrelevant to short-term decisions.
- Limiting factor
- Related: Opportunity cost, Throughput accounting, Contribution margin
A scarce resource, such as machine hours, skilled labour or a key material, that restricts the volume of output or sales. Ranking products by contribution per unit of the limiting factor maximises total contribution.
- Make-or-buy decision
- Related: Relevant cost, Opportunity cost, Outsourcing
A choice between producing a component internally and purchasing it externally. Relevant costs are the avoidable internal costs compared with the purchase price, adjusted for opportunity costs of freed capacity.
- Shut-down decision
- Related: Contribution margin, Relevant cost, Avoidable cost
A short-term judgement on whether to cease an activity or segment. The activity is usually retained while it earns a positive contribution, unless closure releases capacity with a higher-value alternative use.
- Avoidable cost
- Related: Relevant cost, Shut-down decision, Committed cost
A cost that can be eliminated if an activity, product or department is discontinued. Only avoidable costs are relevant when evaluating closure, because unavoidable allocated fixed costs continue regardless.
- Standard cost
- Related: Variance analysis, Ideal standard, Attainable standard
A predetermined estimate of the cost of producing one unit, built from quantity and price standards for materials, labour and overhead. It provides the benchmark against which actual performance is measured.
- Variance analysis
- Related: Standard cost, Price variance, Operating statement
The process of comparing actual results with standard or budgeted figures, identifying the causes of differences and reporting them by responsibility. Favourable variances increase profit; adverse variances reduce it.
- Price variance
- Related: Usage variance, Standard cost, Planning variance
The difference between the standard price and the actual price paid, multiplied by the actual quantity purchased or used. It measures purchasing performance and is usually the responsibility of the purchasing manager.
- Usage variance
- Related: Price variance, Efficiency variance, Standard cost
The difference between the standard quantity allowed for actual output and the actual quantity used, valued at the standard price. It measures efficiency in consuming material or labour.
- Idle time variance
- Related: Efficiency variance, Rate variance, Standard cost
The cost of paid hours during which employees could not work because of machine breakdowns, material shortages or similar causes, valued at the standard labour rate. It is always adverse.
- Fixed overhead volume variance
- Related: Over- and under-absorption, Fixed overhead expenditure variance, Absorption costing
The difference between overhead absorbed into production at the standard rate and budgeted fixed overhead, caused by producing more or less than the budgeted volume. It is an absorption costing measure only.
- Planning variance
- Related: Operational variance, Standard cost, Variance analysis
The portion of a total variance caused by an error in, or a revision of, the original standard itself. It is separated from operational variance so managers are judged only on factors they control.
- Operational variance
- Related: Planning variance, Variance analysis
The portion of a total variance caused by actual operating performance differing from a revised, realistic standard. It reflects efficiency and price performance that managers can actually influence.
- Ideal standard
- Related: Attainable standard, Standard cost
A standard set assuming perfect efficiency, no waste, no idle time and best possible prices. It is motivating in theory but often demoralising in practice because it is rarely achievable.
- Attainable standard
- Related: Ideal standard, Standard cost
A standard that allows for normal levels of waste, idle time and machine downtime, so it can be achieved with efficient working. It is the usual basis for budgeting and performance evaluation.
- Flexible budget
- Related: Fixed budget, Variance analysis, Overhead absorption rate
A budget prepared for the actual level of activity achieved, by flexing variable costs with volume while holding fixed costs constant. It allows a fair comparison of actual cost with what should have been incurred.
- Fixed budget
- Related: Flexible budget, Budgetary control
A budget prepared for one planned level of activity only and not adjusted afterwards. Comparing it directly with actual results at a different volume produces misleading variances.
- Zero-based budgeting
- Related: Incremental budgeting, Budgetary control, Discretionary cost
A budgeting approach in which every activity must be justified from a nil base each period, rather than by adjusting last year's figure. Decision packages are ranked and funded in priority order.
- Incremental budgeting
- Related: Zero-based budgeting, Fixed budget
A budgeting approach that starts from the previous period's budget or actual cost and adjusts it for expected changes such as inflation or volume. It is quick but tends to perpetuate past inefficiencies.
- Budgetary control
- Related: Flexible budget, Responsibility accounting, Variance analysis
The process of setting budgets, communicating them, measuring actual performance against them and taking corrective action on significant deviations. It links planning with day-to-day control of responsibility centres.
- Activity based costing
- Related: Cost driver, Activity based management, Overhead absorption rate
A costing method that assigns overhead to products according to the activities they consume, using cost drivers rather than a single volume-based absorption rate. It improves accuracy where products differ in complexity.
- Cost driver
- Related: Activity based costing, Activity based management
A factor that causes the cost of an activity to change, such as number of set-ups, orders or machine hours. It provides the basis for allocating activity cost pools to products.
- Activity based management
- Related: Activity based costing, Cost driver, Value-added activity
The use of activity based cost information to improve operations, for example by eliminating non-value-added activities, redesigning processes or improving product mix and pricing decisions.
- Value-added activity
- Related: Activity based management, Throughput accounting
An activity that increases the worth of a product or service to the customer and that the customer would be willing to pay for. Non-value-added activities consume resources without adding worth.
- Net present value
- Related: Internal rate of return, Discount rate, Payback period
The sum of a project's future cash flows discounted at the cost of capital, less the initial investment. A positive NPV indicates the project should increase shareholder wealth and be accepted.
- Internal rate of return
- Related: Net present value, Discount rate
The discount rate at which a project's net present value equals zero. It is compared with the cost of capital; a project is acceptable when its IRR exceeds the required rate.
- Payback period
- Related: Net present value, Discounted payback
The time taken for cumulative cash inflows to equal the initial investment. It is simple and emphasises liquidity and risk, but ignores the time value of money and cash flows after payback.
- Discount rate
- Related: Net present value, Internal rate of return, Cost of capital
The required rate of return used to convert future cash flows into present value, reflecting the cost of capital and the risk of the project. A higher rate reduces the present value of distant cash flows.
- Cost of capital
- Related: Discount rate, Net present value
The weighted average return a company must earn on its investments to satisfy lenders and shareholders. It is the minimum acceptable return and the usual discount rate in investment appraisal.
- Residual income
- Related: Return on investment, Transfer price, Cost of capital
Divisional profit less a notional interest charge on the division's invested capital. Unlike return on investment, it encourages managers to accept projects earning above the cost of capital.
- Return on investment
- Related: Residual income, Transfer price
Divisional operating profit divided by divisional invested capital, expressed as a percentage. It is widely used but can cause managers to reject profitable projects that would lower the division's existing ratio.
- Transfer price
- Related: Residual income, Goal congruence, Dual pricing
The price at which one division of a company supplies goods or services to another. It affects divisional profit, manager motivation and goal congruence, and should ideally reflect opportunity cost.
- Goal congruence
- Related: Transfer price, Residual income, Return on investment
The alignment of individual managers' and divisions' objectives with those of the organisation as a whole, so that decisions taken locally also maximise overall corporate benefit.
- Dual pricing
- Related: Transfer price, Goal congruence
A transfer pricing arrangement in which the supplying division is credited at one price, often market price, while the receiving division is charged a lower price, such as variable cost plus a mark-up.
- Throughput accounting
- Related: Limiting factor, Value-added activity, Contribution margin
A constraint-based approach that treats only direct material as a truly variable cost and ranks products by throughput per unit of bottleneck resource, where throughput is sales revenue less material cost.
- Responsibility accounting
- Related: Budgetary control, Goal congruence, Residual income
A system that assigns revenues, costs and investment to individual managers and reports performance against controllable items, so that each responsibility centre is evaluated on what it can influence.
- Target costing
- Related: Cost-plus pricing, Life-cycle costing
A pricing-led approach in which the allowable cost is found by deducting the required profit margin from an estimated selling price set by market conditions, and the product is then designed to meet that cost.
- Cost-plus pricing
- Related: Target costing, Contribution margin
A pricing method that adds a fixed mark-up or margin to the estimated cost of a product or service. It is simple and ensures costs are covered but ignores customer demand and competitor prices.
- Sensitivity analysis
- Related: Margin of safety, Net present value
A technique that tests how a decision or project outcome changes when one key assumption, such as selling price, volume or discount rate, is varied. It identifies the variables to which results are most exposed.