CMA Inter Paper 9: OMSM flashcards
CMA Inter Paper 9: OMSM · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Operations Management Definition
- The management of the transformation process that converts inputs such as materials, labour and information into goods and services, covering design, planning, control and improvement decisions.
- Order Qualifier vs Winner
- An order qualifier is the minimum standard a firm must meet to be considered by a buyer; an order winner is the criterion that actually secures the purchase.
- Process Types by Volume
- Job shop, batch, mass/line and continuous process. As volume rises, variety falls and the process becomes more standardised, capital intensive and efficient.
- Service Characteristics
- Services differ from goods through intangibility, inseparability of production and consumption, perishability, and customer participation in the delivery process.
- Exponential Smoothing Formula
- New forecast equals alpha times latest actual demand plus one minus alpha times previous forecast. A higher alpha makes the forecast more responsive to recent demand.
- Economic Order Quantity Formula
- EOQ equals the square root of two times annual demand times ordering cost, divided by annual holding cost per unit. It minimises total ordering plus holding cost.
- Reorder Point
- The inventory level at which a new order is placed: demand rate multiplied by lead time, plus safety stock held against demand or lead-time uncertainty.
- MRP Net Requirement
- Net requirement equals gross requirement plus safety stock minus projected on-hand inventory minus scheduled receipts. It drives planned order releases in MRP.
- Aggregate Planning Strategies
- Level capacity keeps output constant and absorbs demand variation through inventory or backlogs; chase demand varies output to match demand; mixed plans blend both.
- SPT Scheduling Rule
- Shortest Processing Time sequences jobs by ascending duration. It usually minimises average flow time and average waiting time but can delay long jobs.
- Single vs Multifactor Productivity
- Single-factor productivity divides output by one input such as labour hours; multifactor productivity divides output by a cost-weighted bundle of inputs.
- Total Factor Productivity
- Total output divided by total inputs, usually measured in value terms so that dissimilar inputs such as labour, materials and capital can be aggregated.
- Productivity Change Formula
- Percentage change in productivity equals new productivity minus old productivity, divided by old productivity, multiplied by one hundred.
- Productivity vs Production
- Production measures output volume only; productivity relates output to the inputs consumed, so output can rise while productivity falls if inputs rise faster.
- Cost of Quality Categories
- Prevention and appraisal costs are conformance costs; internal and external failure costs are non-conformance costs, with external failure usually the costliest.
- Seven Wastes TIMWOOD
- Transportation, inventory, motion, waiting, overproduction, overprocessing and defects. Overproduction is often considered the worst waste because it creates others.
- Process Capability Cpk
- Cpk measures how well a process fits within specification limits while accounting for centring; a value below one indicates the process produces defects.
- Six Sigma DMAIC
- Define, Measure, Analyse, Improve and Control: a structured methodology for improving existing processes toward a target of 3.4 defects per million opportunities.
- Kaizen and 5S
- Kaizen is continuous incremental improvement by the workforce; 5S (sort, set in order, shine, standardise, sustain) organises and standardises the workplace as its foundation.
- PERT Expected Time
- Expected activity time equals optimistic plus four times most likely plus pessimistic, divided by six; variance uses the pessimistic-optimistic range squared over thirty-six.
- Critical Path Meaning
- The longest sequence of dependent activities through a project network. It determines minimum project duration and its activities have zero total float.
- Earned Value Variances
- Cost variance equals earned value minus actual cost; schedule variance equals earned value minus planned value. Positive values indicate favourable performance.
- Cost Performance Index
- CPI equals earned value divided by actual cost. A CPI below one means cost overrun; estimate at completion equals budget at completion divided by CPI.
- Bullwhip Effect
- Upstream demand variability amplifies as orders move up the supply chain, caused by forecasting, batching, price promotions and shortage gaming, raising inventory costs.
- Mintzberg 5 Ps
- Strategy viewed as plan (intended course), ploy (competitive manoeuvre), pattern (consistent behaviour), position (place in environment) and perspective (shared mindset).
- Vision Mission Objectives
- Vision describes the desired future state; mission states present purpose and scope; objectives are measurable, time-bound targets that translate mission into action.
- Porter Five Forces
- Industry attractiveness depends on rivalry, buyer power, supplier power, threat of new entrants and threat of substitutes; strong forces compress industry profitability.
- VRIO Framework
- A resource yields sustained advantage only if it is valuable, rare, costly to imitate and supported by the organisation's structure and processes.
- Porter Value Chain
- Primary activities are inbound logistics, operations, outbound logistics, marketing and sales, and service; support activities include procurement, technology, HR and infrastructure.
- Porter Generic Strategies
- Cost leadership, differentiation and focus. Firms failing to achieve one clear generic strategy are stuck in the middle and earn below-average returns.
- Ansoff Growth Matrix
- Four growth options by product and market novelty: market penetration, market development, product development and diversification, with rising risk in that order.
- Suitability Acceptability Feasibility
- SAFe tests a strategy: suitability asks whether it addresses the strategic situation, acceptability covers risk and return, feasibility covers resources and competences.