ICRI CSRT Grade 1 · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Concrete Fundamentals and Deterioration Mechanisms & Surface Preparation and Removal Techniques

  • Explain how plastic shrinkage, drying shrinkage, and thermal gradients each produce a distinct cracking pattern, and sketch each pattern from memory

  • Identify the electrochemical mechanism of chloride-induced reinforcement corrosion and list the three conditions required for active corrosion

  • Classify ten written field descriptions of deterioration (scaling, spalling, delamination, efflorescence, alkali-silica reaction, freeze-thaw damage) into the correct mechanism category

  • Match carbonation, sulfate attack, and aggregate reactivity to their typical exposure conditions and visual indicators

  • Describe how a substrate survey informs the choice of removal method for at least three deterioration scenarios

Your checkpoint

A one-page deterioration-mechanism decision table (mechanism, visual signature, likely cause, implication for repair) covering at least eight mechanisms, self-quizzed to 90% accuracy

Week 2

Surface Preparation and Removal Techniques

  • Compare hydrodemolition, abrasive blasting, scarification, milling, and hand tools on removal depth control, substrate disturbance, and production rate

  • Determine when saw-cut boundaries and square-edge preparation are required before removal begins

  • Specify the correct surface profile and cleanliness standard for a given repair material and exposure condition

  • Sequence the steps for preparing and protecting reinforcing steel, including undercutting behind exposed bars

  • Identify three preparation errors that later cause disbondment or placement defects and state the inspection check that catches each

Your checkpoint

A written method statement for removing and preparing a 4 m² spalled slab soffit, including tool selection, edge treatment, steel preparation, acceptance criteria, and a pre-placement inspection checklist

Week 3

Surface Preparation and Removal Techniques & Repair Materials and Material Selection

  • Evaluate substrate moisture, roughness, and soundness requirements against a given repair material datasheet

  • Explain how bond coats and primers work and state the time window between application and placement

  • Distinguish cementitious, epoxy, and polyurethane repair mortars by shrinkage behavior, modulus, and suitable application thickness

  • Select a repair material for overhead, vertical, and horizontal placements and justify each choice on placement and curing grounds

  • Identify compatibility risks when a stiff repair material is placed against a flexible substrate

Your checkpoint

A material selection matrix for three repair scenarios (overhead patch, vertical wall, horizontal slab) listing chosen material class, preparation requirement, bond coat, and justification for each

Week 4

Repair Materials and Material Selection & Repair Methods, Placement, and Curing

  • Describe how mix water content, aggregate grading, and admixtures affect repair mortar shrinkage and strength gain

  • Explain the purpose and correct use of bonding agents, corrosion inhibitors, and shrinkage-compensating components

  • Sequence formwork erection, mixing, placement, and consolidation for a formed vertical repair

  • Apply placement limits on lift thickness and working time for trowel-applied and sprayed repair mortars

  • State the curing requirements for cementitious and polymer-modified repairs and explain what happens when curing is neglected

Your checkpoint

A timed walkthrough of a vertical formed repair from formwork to curing, written as a step list with the hold point and inspection check at each step, reviewed against the material datasheet

Week 5

Repair Methods, Placement, and Curing

  • Differentiate dry-mix and wet-mix shotcrete placement and state where each is appropriate for repair work

  • Explain how to place repair material behind exposed reinforcement without leaving voids

  • Describe crack repair by injection and by routing and sealing, and select between them by crack width and activity

  • Explain the purpose of cathodic protection, chloride extraction, and surface sealers as mitigation rather than structural repair

  • List three placement defects (voids, cold joints, sagging) and the placement control that prevents each

Your checkpoint

A one-page comparison of injection versus routing and sealing, plus a placement-defect cause-and-prevention table with at least five entries

Week 6

Quality Control, Inspection, and Testing

  • Perform and interpret a tap test and a chain drag survey, and state the acceptance criteria for delamination

  • Explain how to verify repair depth and bond using a pull-off test, including test frequency and failure modes

  • Interpret slump, air content, and compressive strength test results against specification limits

  • Describe how to record ambient and substrate temperature and when temperature limits stop placement

  • Identify the documentation required to close out a repair, including inspection records and nonconformance reports

Your checkpoint

A mock inspection report for a completed patch covering tap test results, pull-off test values, temperature records, and a pass or fail determination with reasoning

Week 7

Safety, Environmental Compliance, and Documentation & Quality Control, Inspection, and Testing

  • Identify the hazards of silica dust, cement burns, and abrasive blasting and state the control for each

  • Explain waste classification and disposal requirements for chloride-contaminated and lead-containing demolition debris

  • Describe containment and runoff control measures for surface preparation near waterways

  • List the contents of a repair specification and a pre-job safety briefing

  • Explain how inspection records support warranty claims and dispute resolution

Your checkpoint

A site safety and environmental plan for a repair project, covering hazard controls, waste handling, containment, and the documentation trail from briefing to closeout

Week 8

Concrete Fundamentals and Deterioration Mechanisms & Repair Materials and Material Selection & Surface Preparation and Removal Techniques & Repair Methods, Placement, and Curing & Quality Control, Inspection, and Testing & Safety, Environmental Compliance, and Documentation

  • Complete a full-length timed practice exam and score each domain separately

  • Review every missed question and trace it to the underlying principle rather than memorizing the answer

  • Re-drill the two weakest domains using the decision tables and matrices built in earlier weeks

  • Summarize the ten facts most likely to be tested and state each in one sentence

  • Confirm readiness by meeting a target score on a second timed attempt

Your checkpoint

A scored practice exam with a written error log identifying the cause of each miss and the corrected principle, plus a final one-page summary sheet

Milestones

Week 2: Explain surface preparation choices for three deterioration scenarios without notes and pass a 20-question self-quiz on removal methods at 80% or better

Week 4: Complete the material selection matrix and timed placement walkthrough; score 80% or better on a 30-question mixed quiz covering domains 1 through 4

Week 6: Produce the mock inspection report with correct test interpretation and pass a 20-question quiz on quality control at 80% or better

Week 8: Score 80% or better on a full-length timed practice exam with no domain below 70%, and have a completed error log and summary sheet