ICRI CSRT Grade 1 study plan
ICRI CSRT Grade 1 · Give each week a clear focus.
8 weeks · About 7 hours per week
Concrete Fundamentals and Deterioration Mechanisms & Surface Preparation and Removal Techniques
Explain how plastic shrinkage, drying shrinkage, and thermal gradients each produce a distinct cracking pattern, and sketch each pattern from memory
Identify the electrochemical mechanism of chloride-induced reinforcement corrosion and list the three conditions required for active corrosion
Classify ten written field descriptions of deterioration (scaling, spalling, delamination, efflorescence, alkali-silica reaction, freeze-thaw damage) into the correct mechanism category
Match carbonation, sulfate attack, and aggregate reactivity to their typical exposure conditions and visual indicators
Describe how a substrate survey informs the choice of removal method for at least three deterioration scenarios
Your checkpoint
A one-page deterioration-mechanism decision table (mechanism, visual signature, likely cause, implication for repair) covering at least eight mechanisms, self-quizzed to 90% accuracy
Surface Preparation and Removal Techniques
Compare hydrodemolition, abrasive blasting, scarification, milling, and hand tools on removal depth control, substrate disturbance, and production rate
Determine when saw-cut boundaries and square-edge preparation are required before removal begins
Specify the correct surface profile and cleanliness standard for a given repair material and exposure condition
Sequence the steps for preparing and protecting reinforcing steel, including undercutting behind exposed bars
Identify three preparation errors that later cause disbondment or placement defects and state the inspection check that catches each
Your checkpoint
A written method statement for removing and preparing a 4 m² spalled slab soffit, including tool selection, edge treatment, steel preparation, acceptance criteria, and a pre-placement inspection checklist
Surface Preparation and Removal Techniques & Repair Materials and Material Selection
Evaluate substrate moisture, roughness, and soundness requirements against a given repair material datasheet
Explain how bond coats and primers work and state the time window between application and placement
Distinguish cementitious, epoxy, and polyurethane repair mortars by shrinkage behavior, modulus, and suitable application thickness
Select a repair material for overhead, vertical, and horizontal placements and justify each choice on placement and curing grounds
Identify compatibility risks when a stiff repair material is placed against a flexible substrate
Your checkpoint
A material selection matrix for three repair scenarios (overhead patch, vertical wall, horizontal slab) listing chosen material class, preparation requirement, bond coat, and justification for each
Repair Materials and Material Selection & Repair Methods, Placement, and Curing
Describe how mix water content, aggregate grading, and admixtures affect repair mortar shrinkage and strength gain
Explain the purpose and correct use of bonding agents, corrosion inhibitors, and shrinkage-compensating components
Sequence formwork erection, mixing, placement, and consolidation for a formed vertical repair
Apply placement limits on lift thickness and working time for trowel-applied and sprayed repair mortars
State the curing requirements for cementitious and polymer-modified repairs and explain what happens when curing is neglected
Your checkpoint
A timed walkthrough of a vertical formed repair from formwork to curing, written as a step list with the hold point and inspection check at each step, reviewed against the material datasheet
Repair Methods, Placement, and Curing
Differentiate dry-mix and wet-mix shotcrete placement and state where each is appropriate for repair work
Explain how to place repair material behind exposed reinforcement without leaving voids
Describe crack repair by injection and by routing and sealing, and select between them by crack width and activity
Explain the purpose of cathodic protection, chloride extraction, and surface sealers as mitigation rather than structural repair
List three placement defects (voids, cold joints, sagging) and the placement control that prevents each
Your checkpoint
A one-page comparison of injection versus routing and sealing, plus a placement-defect cause-and-prevention table with at least five entries
Quality Control, Inspection, and Testing
Perform and interpret a tap test and a chain drag survey, and state the acceptance criteria for delamination
Explain how to verify repair depth and bond using a pull-off test, including test frequency and failure modes
Interpret slump, air content, and compressive strength test results against specification limits
Describe how to record ambient and substrate temperature and when temperature limits stop placement
Identify the documentation required to close out a repair, including inspection records and nonconformance reports
Your checkpoint
A mock inspection report for a completed patch covering tap test results, pull-off test values, temperature records, and a pass or fail determination with reasoning
Safety, Environmental Compliance, and Documentation & Quality Control, Inspection, and Testing
Identify the hazards of silica dust, cement burns, and abrasive blasting and state the control for each
Explain waste classification and disposal requirements for chloride-contaminated and lead-containing demolition debris
Describe containment and runoff control measures for surface preparation near waterways
List the contents of a repair specification and a pre-job safety briefing
Explain how inspection records support warranty claims and dispute resolution
Your checkpoint
A site safety and environmental plan for a repair project, covering hazard controls, waste handling, containment, and the documentation trail from briefing to closeout
Concrete Fundamentals and Deterioration Mechanisms & Repair Materials and Material Selection & Surface Preparation and Removal Techniques & Repair Methods, Placement, and Curing & Quality Control, Inspection, and Testing & Safety, Environmental Compliance, and Documentation
Complete a full-length timed practice exam and score each domain separately
Review every missed question and trace it to the underlying principle rather than memorizing the answer
Re-drill the two weakest domains using the decision tables and matrices built in earlier weeks
Summarize the ten facts most likely to be tested and state each in one sentence
Confirm readiness by meeting a target score on a second timed attempt
Your checkpoint
A scored practice exam with a written error log identifying the cause of each miss and the corrected principle, plus a final one-page summary sheet
Milestones
Week 2: Explain surface preparation choices for three deterioration scenarios without notes and pass a 20-question self-quiz on removal methods at 80% or better
Week 4: Complete the material selection matrix and timed placement walkthrough; score 80% or better on a 30-question mixed quiz covering domains 1 through 4
Week 6: Produce the mock inspection report with correct test interpretation and pass a 20-question quiz on quality control at 80% or better
Week 8: Score 80% or better on a full-length timed practice exam with no domain below 70%, and have a completed error log and summary sheet