CSCS 180° Excavator · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Health, safety and environment (operative test)

  • Define the operative responsibilities under health, safety and environment legislation relevant to plant operations

  • List the site-specific hazards associated with 180° excavator work and rank them by severity

  • Explain the purpose and content of a risk assessment and method statement for excavator tasks

  • Identify the correct personal protective equipment for machine operation and site conditions

Your checkpoint

A one-page hazard and PPE checklist covering at least 15 excavator-specific hazards, each with a control measure

Week 2

Health, safety and environment (operative test)

  • Describe safe systems of work for exclusion zones, segregation and pedestrian interface

  • Explain the procedure for reporting accidents, near misses and defects

  • State the actions to take on discovering an underground service strike

  • Interpret common site safety signage and hand signals used around plant

Your checkpoint

A written scenario response (300 words) describing correct actions for a service strike and a pedestrian near miss

Week 3

Pre-use checks, preparation and configuration of the 180° excavator

  • List the pre-start checks required on the machine and around it before operation

  • Explain the checks for fluid levels, greasing points and track condition

  • Describe how to confirm the machine is configured correctly for the task

  • Identify defects that require the machine to be taken out of service

Your checkpoint

A completed pre-use inspection checklist template with pass/fail criteria for each item

Week 4

Pre-use checks, preparation and configuration of the 180° excavator & Travelling, manoeuvring and site positioning

  • Explain the function and correct adjustment of the operator controls and seat

  • Describe the procedure for safely mounting and dismounting the machine

  • State the travel and manoeuvring rules for a 180° excavator on site

  • Explain how to position the machine for stability on varying ground

Your checkpoint

A written positioning plan for three different site scenarios, each stating ground conditions, machine stance and justification

Week 5

Travelling, manoeuvring and site positioning

  • Describe safe travel on slopes, including limitations and direction of travel

  • Explain the use of the dozer blade and outriggers during travel and work

  • State the rules for travelling with an attachment raised or lowered

  • Interpret site traffic management and designated routes for plant

Your checkpoint

A slope and travel rules summary card that could be handed to a new operator

Week 6

Excavating, lifting and placing with the 180° excavator

  • Explain the digging cycle and how to control depth and line during excavation

  • Describe how to form a trench to specification with correct batter and spoil placement

  • State the lifting limitations of the machine and the factors affecting capacity

  • Explain the procedure for a safe lift using the machine, including communication and exclusion

Your checkpoint

A step-by-step lifting procedure document covering planning, signalling, load control and emergency stop

Week 7

Excavating, lifting and placing with the 180° excavator & Shutdown, parking, securing and post-operational checks

  • Describe the procedure for placing spoil and backfilling to specification

  • Explain the shutdown sequence and the checks to complete before leaving the machine

  • State the parking requirements for stability, security and site safety

  • List the post-operational checks and defect reporting requirements

Your checkpoint

A shutdown and parking sequence checklist with at least 10 sequential steps

Week 8

Health, safety and environment (operative test) & Pre-use checks, preparation and configuration of the 180° excavator & Travelling, manoeuvring and site positioning & Excavating, lifting and placing with the 180° excavator & Shutdown, parking, securing and post-operational checks

  • Recall the key safety and environmental requirements across all domains

  • Demonstrate the full pre-use to shutdown sequence in a timed walkthrough

  • Identify and correct any gaps found in earlier weekly deliverables

  • Answer practice questions across all five domains with at least 80% accuracy

Your checkpoint

A full mock test result of 80% or above, plus a corrected list of any weak areas

Milestones

Week 2: Can explain the correct response to a service strike and a pedestrian near miss without notes

Week 4: Can list the full pre-use inspection sequence and justify machine positioning in three scenarios

Week 6: Can describe the safe lifting procedure and the machine's lifting limitations from memory

Week 8: Achieves 80% or above on a full mock test covering all five domains