CSCS Mini Digger flashcards
CSCS Mini Digger · Build recall with a focused review session.
31 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Blue circular safety sign
- A mandatory sign showing a white symbol on a blue background; it tells you that a specific action must be taken in that area, such as wearing head or eye protection.
- Yellow triangular safety sign
- A warning sign, a yellow triangle with a black border and symbol, alerting you to a hazard in the area such as a deep excavation, moving plant or overhead lines.
- Spoil heap set-back distance
- Excavated spoil must be stored at least one metre back from the trench edge so that its weight does not surcharge the sides and cause the excavation to collapse.
- Excavation access ladder spacing
- Any excavation deeper than 1.2 metres needs a means of escape, typically ladders spaced so that no worker has to travel more than about 25 metres to reach one.
- CAT and Genny use
- A cable avoidance tool and signal generator locate buried services before digging. The area is scanned in a grid pattern, the line marked, then confirmed by careful hand digging.
- Overhead line minimum approach
- Treat every overhead line as live. HSE guidance GS6 sets minimum clearance distances by voltage, and barriers or goal posts mark a safe route beneath the line.
- Slewing excavator exclusion zone
- No one may stand within the machine's maximum reach plus a margin while it is slewing; the operator must keep the bucket clear of people, vehicles and structures.
- RIDDOR dangerous occurrence, plant
- The overturning or collapse of an excavator, or the failure of a lifting accessory or sling, is a reportable dangerous occurrence even when nobody is injured.
- Welfare facilities under CDM
- Schedule 2 of CDM 2015 requires sanitary conveniences, washing facilities, drinking water, changing and drying rooms, rest areas and first-aid provision to be available on site.
- HASAWA employer general duty
- Section 2 of the Health and Safety at Work etc. Act 1974 requires employers to ensure, so far as is reasonably practicable, the health, safety and welfare of their employees at work.
- PUWER 1998 core requirement
- Work equipment must be suitable for its use, maintained in a safe condition, used only by trained people, and inspected at suitable intervals with the results recorded.
- LOLER thorough examination interval
- Lifting accessories and equipment used to lift people require a thorough examination at least every six months; other lifting equipment at least every twelve months.
- RIDDOR over-seven-day injury
- An injury that keeps a worker off their normal duties for more than seven consecutive days must be reported to the enforcing authority within ten days of the incident.
- MHSWR 1999 risk assessment
- Employers must make a suitable and sufficient assessment of the risks to workers and others, record the significant findings, and appoint competent persons to assist them.
- HSG47 scope
- HSE guidance on avoiding danger from underground services; it covers planning, locating services from plans and with locators, safe digging methods and emergency action after a cable strike.
- CDM 2015 principal contractor duty
- The principal contractor must plan, manage and monitor the construction work, draw up a construction phase plan, and ensure welfare facilities are provided before work begins.
- Stabilisers on wheeled excavator
- On a wheeled machine the dozer blade or outriggers are fully lowered and the machine levelled before digging; the bucket is never used to pull the machine along.
- Travelling downhill with a bucket
- Keep the bucket low and on the downhill side, travel straight up or down the slope rather than across it, and stay within the manufacturer's rated gradient.
- Quick hitch locking pin
- The attachment must be correctly engaged and the locking pin or safety device fitted and visually checked before the machine is used, to prevent the bucket releasing unexpectedly.
- Toothless ditching bucket use
- A wider, toothless bucket is used for trimming, grading and trench work where a clean finish is needed, rather than for breaking out hard or compacted ground.
- Excavator lifting capacity
- Safe lifting capacity falls as the load is moved further out or higher. The operator reads the manufacturer's load chart for the actual radius and uses certified lifting points only.
- Slewing over the spoil heap
- Loading to the side of the machine is normal, but the bucket must never pass over site workers, vehicles or the cab; a vehicle marshal controls approach to the machine.
- Bucket curl and breakout force
- Digging force is greatest when the dipper and bucket are in line with the machine and the bucket is curled in; crowding the bucket out reduces breakout force and drags the machine forward.
- Rated gradient for tracked plant
- An excavator may only travel on slopes within the maximum gradient stated by the manufacturer, with the operator first checking ground condition, surface and machine stability.
- Site traffic segregation
- Pedestrian routes must be physically separated from plant movements, and where plant has to reverse a trained vehicle marshal must control the manoeuvre and stay visible.
- Daily walkaround pre-use check
- Before each shift the operator checks engine oil, coolant, hydraulic oil, fuel, tracks, hoses, lights, horn, seat belt and fire extinguisher, and records any defects found.
- Hydraulic injection injury
- A pinhole leak in a pressurised hose can inject fluid through the skin. Leaks are never traced with bare hands but with a piece of card or wood held clear.
- PUWER recorded inspection interval
- Excavators need a recorded inspection by a competent person at intervals set by risk assessment, commonly weekly on construction sites, and always after substantial alteration or repair.
- Defect reporting decision rule
- If a pre-use check reveals a defect affecting safe operation, the machine is taken out of service, tagged and reported to the supervisor before any further work takes place.
- Track tension and wear check
- Tracks are checked at the interval given in the manufacturer's manual; loose tracks can derail, and worn or missing track plates reduce grip, so both are recorded at inspection.
- Refuelling a mini digger
- Switch the engine off and let it cool, allow no smoking or naked flame, use a funnel and spill kit, clean up any diesel, and check hoses for leaks before restarting.