- Risk assessment hierarchy
- A statutory approach that requires hazards to be eliminated first, then risks reduced, then residual risks controlled, with the process documented before shot firing begins.
- Notifiable incident
- An event such as a misfire, theft, loss of explosives, injury or uncontrolled explosion that must be reported to the regulator, often police too, within a set deadline.
- Competence
- The combination of training, qualification and relevant experience that authorises a person to carry out a specific shot firing task safely and lawfully.
- Blast plan
- A site-specific, signed-off document setting out hole layout, explosive types and quantities, timing, stemming and exclusion zone, forming the operational expression of legal duties.
- ANFO
- A blasting agent made from ammonium nitrate prills and fuel oil; inexpensive and low in water resistance, needing a strong primer and confinement to detonate reliably.
- Velocity of detonation
- The speed at which the detonation shock front travels through an explosive column, a key property determining energy delivery, fragmentation and suitability for the rock.
- Emulsion explosive
- A water-resistant explosive with adjustable density and energy, produced by sensitising an oxidiser-fuel emulsion, suitable for wet holes and varied ground conditions.
- Magazine segregation
- The practice of storing detonators separately from bulk explosives and detonating cord, with stock reconciliation and protection from impact, heat, moisture and unauthorised access.
- Electronic detonator
- A programmable detonator tested individually through a logger or blasting machine, giving very tight timing accuracy and recording continuity and fault codes.
- Shock tube system
- A non-electric initiation system immune to stray currents and radio frequency, but requiring protection from kinking, cutting, abrasion and hot work.
- Circuit continuity test
- A pre-firing check of an electric detonator circuit confirming resistance and continuity, carried out with the area isolated and personnel clear of the charge.
- Detonating cord rating
- The explosive content of detonating cord expressed in grains per foot or grams per metre, indicating its capacity to initiate downlines and trunklines.
- Powder factor
- The mass of explosive used per unit volume of rock broken, a core design parameter used to compare blast designs and reconcile results with the plan.
- Burden
- The distance from a charged hole to the nearest free face; too large a burden overconfines the charge, risking misfires and flyrock.
- Stemming
- Inert, angular, non-combustible material placed above the explosive column, generally at least the burden in length, to confine gases and reduce flyrock and airblast.
- Spacing to burden ratio
- The relationship between hole spacing and burden in a blast pattern, commonly around 1.0 to 1.5 for bench blasting, adjusted for fragmentation and wall control.
- Subdrill
- The length a blast hole is drilled below the intended floor level, ensuring the full bench is broken to grade without leaving a hard toe.
- Pre-split blasting
- A technique using closely spaced, lightly charged holes fired before the main blast to create a fracture plane that protects the final wall from damage.
- Exclusion zone
- The cleared radius around a blast, sized from the design and site conditions to protect against flyrock, fumes and airblast, confirmed clear before firing.
- All-clear signal
- The audible signal given by the shot firer after inspection confirms no misfires or undetonated explosives remain, permitting re-entry to the blast area.
- Misfire
- A condition where the full round has not detonated after the expected delay; the area is treated as live and re-entry is delayed per procedure.
- Misfire procedure
- The sequence of isolating the firing circuit, maintaining the exclusion zone, waiting the prescribed time, then investigating and re-blasting or recovering under supervision.
- Post-blast inspection
- The shot firer's examination of the muckpile for undetonated explosives, cut-offs and misfires before the all-clear is given and work resumes.
- Blast fume hazard
- Carbon monoxide and oxides of nitrogen produced by detonation, which can persist in confined or low-wind conditions and require ventilation and delay before re-entry.
- Peak particle velocity
- The measured ground vibration amplitude at a receptor, used with site-specific limits to assess whether a blast is acceptable to nearby structures.
- Scaled distance
- Distance divided by the square root of the maximum charge per delay, used to compare blasts against site-specific vibration and airblast criteria.
- Airblast overpressure
- The airborne pressure wave from a blast, reduced by good stemming, avoiding exposed detonating cord and firing in favourable wind and weather conditions.
- Flyrock control
- Management of rock throw by ensuring adequate burden and stemming, correct delay sequencing, no overcharging and clearing the zone to the design radius.
- Blast record
- A document capturing date, location, shot firer, design, hole data, explosive and detonator quantities, delays and results, retained for the statutory period.
- Explosives reconciliation
- The chain-of-custody accounting of explosives from receipt through issue to use or return, checked against stock to detect loss or discrepancy.
- Pre-blast briefing
- Communication with site personnel, neighbours and authorities covering the blast time, warning signals, exclusion zone and emergency arrangements before firing.
- Shift handover record
- A documented transfer of information between shot firers or shifts, including live rounds, misfires and magazine status, to maintain continuity of safety controls.