- Health and Safety at Work etc. Act 1974
- Related: Risk assessment, Construction (Design and Management) Regulations 2015
The main UK law setting out the general duties of employers, employees and others to protect people at work. It requires work to be carried out safely and without risk to health so far as is reasonably practicable.
- Construction (Design and Management) Regulations 2015
- Related: Principal contractor, Health and Safety at Work etc. Act 1974
Regulations covering construction projects, including roadworks that count as construction work. They set duties for clients, designers, principal contractors and contractors to plan, manage and monitor the work so that risks are controlled.
- New Roads and Street Works Act 1991
- Related: Highway authority, Signing, lighting and guarding operative, Reinstatement
The Act that governs works in the street, including work by utility companies. It sets requirements for signing, lighting and guarding, for reinstatement, and for working with the highway authority.
- Risk assessment
- Related: Safe system of work, Dynamic risk assessment
A careful look at what in a job could cause harm and what controls are needed to prevent it. Significant findings must be recorded, and the assessment reviewed when conditions or the work change.
- Highway authority
- Related: Statutory undertaker, New Roads and Street Works Act 1991
The council or other body responsible for maintaining and managing a highway. It sets conditions for works, coordinates activity on the road network and can require changes to how a site is set up.
- Statutory undertaker
- Related: Service drawing, New Roads and Street Works Act 1991
A utility company or similar body with legal rights to place and maintain apparatus, such as pipes and cables, in the street. It must follow street works rules whenever it works on the highway.
- Signing, lighting and guarding operative
- Related: Traffic cone, Safety zone, Advance warning sign
A trained person who sets up, checks and maintains the signs, lights and barriers needed to protect the works, road users and pedestrians. They must hold the relevant street works qualification for the task.
- Works supervisor
- Related: Signing, lighting and guarding operative, Safe system of work
The person responsible for monitoring a street works site so that the signing, lighting and guarding, and the work itself, meet the required standards and the site stays safe.
- Principal contractor
- Related: Construction (Design and Management) Regulations 2015, Traffic management plan
Under CDM, the contractor appointed to manage a construction project involving more than one contractor. They coordinate the site, control access and make sure welfare and safety arrangements are in place.
- Personal protective equipment
- Related: High-visibility clothing, Safe system of work
Clothing or equipment worn to reduce the risk of injury, such as helmets, boots, gloves and eye protection. It is a last line of defence and must be suitable, well maintained and worn as instructed.
- High-visibility clothing
- Related: Personal protective equipment, Live carriageway
Garment made from fluorescent and reflective material that makes the wearer easier to see in daylight and in headlights. Roadworkers normally need at least Class 2 or 3 depending on the site.
- Safe system of work
- Related: Risk assessment, Toolbox talk
A defined way of carrying out a task that keeps risks as low as reasonably practicable. It covers the sequence of steps, the equipment, the people involved and the controls needed.
- Toolbox talk
- Related: Safe system of work, Dynamic risk assessment
A short briefing given to the team before or during a job. It covers the task, the hazards, the controls and any changes, and gives people the chance to ask questions.
- Dynamic risk assessment
- Related: Risk assessment, Toolbox talk
A quick, ongoing check of conditions while work is in progress. It helps spot new hazards such as changing traffic, weather or site conditions so they can be dealt with before they cause harm.
- Traffic cone
- Related: Taper, Safety zone
A cone-shaped marker used to mark tapers, lanes, safety zones and closures. Cones must be the right size for the road, correctly spaced, upright and kept clean and visible.
- Advance warning sign
- Related: Taper, Temporary speed limit
A sign placed well before the works telling drivers what to expect, such as roadworks, a lane closure or a temporary speed limit. It must be visible, upright and at the correct distance for the road.
- Taper
- Related: Traffic cone, Lane closure
The angled line of cones that leads traffic from its normal lane into a new path past the works. Its length depends on the speed of the road being worked on.
- Safety zone
- Related: Traffic cone, Live carriageway
A clear space kept between the works and the moving traffic, free of people, plant and materials. It gives road users room to pass and protects the workforce if a vehicle strays.
- Stop/Go boards
- Related: Portable traffic signals, Lane closure
Hand-held signs used by trained operatives to control traffic through a single lane. One face shows STOP and the other GO, and the two operatives must stay in contact by radio or sight.
- Portable traffic signals
- Related: Stop/Go boards, Lane closure
Temporary battery-powered lights used to control traffic through a single lane. They must be positioned, signed and timed correctly, with a plan for power failure or signal fault.
- Pedestrian barrier
- Related: Pedestrian walkway, Safety zone
A rigid barrier that separates pedestrians from the works and from traffic. It must be continuous, stable and correctly positioned, and where required it should have a tapping rail for visually impaired people.
- Flashing amber warning light
- Related: Advance warning sign, Traffic cone
A lamp used to draw drivers' attention to the works, often mounted on cones, barriers or signs. It supports the signing and guarding but never replaces what the layout requires.
- Traffic management plan
- Related: Lane closure, Diversion route
A document describing how traffic, pedestrians and the works will be managed on a site. It covers lane closures, signing, diversion routes, timings, speed limits and emergency arrangements.
- Lane closure
- Related: Taper, Traffic management plan
Closing one or more lanes so work can be carried out safely. It needs the required approval, advance signing, a taper, cones and, where specified, warning lights and a buffer space.
- Contraflow
- Related: Lane closure, Traffic management plan
A layout where traffic is routed in the opposite direction to normal on one side of the road, usually past major works. It needs careful signing, sturdy barriers and clear lane markings.
- Diversion route
- Related: Traffic management plan, Advance warning sign
A signed alternative way for traffic to reach its destination while a road is closed or restricted. The route must suit the traffic that will use it, and its signs must be checked regularly.
- Temporary speed limit
- Related: Advance warning sign, Traffic management plan
A reduced speed limit put in place for the duration of the works and shown by speed restriction signs. It must be properly authorised, correctly signed and removed when the works end.
- Service drawing
- Related: CAT and Genny, Trial hole
A plan showing the position of pipes, cables and other buried apparatus in the street. Drawings are only a guide and must be checked on site because they can be out of date or inaccurate.
- CAT and Genny
- Related: Service drawing, Trial hole
Cable avoidance tools: a locator (CAT) and a signal generator (Genny) used together to detect buried services before digging. They cannot prove a service is absent, so careful hand-digging is still needed.
- Trial hole
- Related: CAT and Genny, Service drawing
A small excavation made carefully by hand to confirm the exact position and depth of a buried service before machine digging. It is used alongside service drawings and locators.
- Shoring
- Related: Confined space
Supporting the sides of an excavation to stop soil collapsing onto people working in it. The type and amount of support depends on the ground, the depth and the loads expected.
- Reinstatement
- Related: New Roads and Street Works Act 1991
Filling and restoring the street after works so it is left safe and in proper condition. It covers the sub-base, surface, edges and any road markings, verges or footways affected.
- Confined space
- Related: Shoring
An enclosed or partly enclosed place, such as a deep chamber or duct, where there may be a risk of lack of oxygen, poisonous gas or flooding. Entry needs special controls and normally a permit.
- Exclusion zone
- Related: Banksman, Blind spot
An area around plant or an operation where people are not allowed to stand, so they cannot be struck or crushed. It is agreed with the operator before the work starts.
- Banksman
- Related: Exclusion zone, Blind spot
A trained person who guides vehicle and plant movements, especially reversing, using agreed signals. They must stay visible to the driver and keep clear of the vehicle's path.
- Pedestrian walkway
- Related: Pedestrian barrier, Live carriageway
A signed, protected route for people on foot past the works. It must be wide enough, free of obstructions, separated from traffic where necessary, and lit and signed as required.
- Live carriageway
- Related: Safety zone, High-visibility clothing
A road that is open to moving traffic, including the lanes next to the works. Working near one requires correct signing and guarding, high-visibility clothing and constant awareness of traffic.
- Blind spot
- Related: Banksman, Exclusion zone
An area around a vehicle or machine that the operator cannot see, even using mirrors. Workers must keep out of blind spots and never assume the operator has seen them.