CSCS Site Dumper study materials
CSCS Site Dumper study resources

CSCS Site Dumper cheat sheet

CSCS Site Dumper · Keep the key ideas within reach.

Quick reference

Health, safety and environment test knowledge

  • Under the Health and Safety at Work etc. Act 1974, employers must ensure, so far as is reasonably practicable, the health, safety and welfare of employees; employees must take reasonable care of themselves and others affected by their acts or omissions.

  • The Management of Health and Safety at Work Regulations 1999 require a suitable and sufficient risk assessment, a named competent person, and cooperation between dutyholders sharing a workplace.

  • RIDDOR reporting thresholds: a fatality, a specified injury, an over-seven-day incapacitation, or a dangerous occurrence must be reported to the HSE; over-three-day injuries are recorded in the accident book only.

  • The hierarchy of control runs: eliminate, substitute, engineering controls, administrative controls, then PPE as the last resort; PPE alone is never a sufficient control for a significant risk.

  • Safety sign shapes carry fixed meaning: red circle with slash = prohibition, blue circle = mandatory action, yellow triangle = warning, green rectangle = safe condition or escape route.

  • The CDM Regulations 2015 place duties on clients, principal designers, principal contractors and contractors; a construction phase plan is required before work starts on notifiable projects.

  • A near miss is an unplanned event that did not cause harm but could have; reporting it allows the cause to be corrected before a repeat produces an injury.

  • Environmental duties on site: prevent silty water entering drains, bund fuel and oil stores, segregate waste under the waste hierarchy, and stop dust and noise at source.

Quick reference

Site dumper operation and plant-specific competence

  • Pre-use checks before every shift: engine oil, coolant, fuel, hydraulic fluid, tyre condition and pressure, brake and steering function, horn, lights, seat belt, ROPS/FOPS structure and fluid leaks.

  • A site dumper is a rigid-frame, rear- or front-tipping carrier with a high centre of gravity; the loaded skip must be kept low, and travelling with the skip raised is the main cause of overturn.

  • Never carry passengers unless a second seat is fitted and the machine is rated for it; a person in the skip is a fatal crush risk on tipping.

  • Travel with the skip trailing and the heaviest load low and centrally placed; on gradients keep the load uphill, descend in the lowest gear, and avoid turning across a slope.

  • The operator must be trained, competent and authorised for that machine type; a card is evidence of training, not a substitute for familiarisation on the specific dumper.

  • Reversing is the highest-risk manoeuvre: use mirrors, a banksman where visibility is restricted, and stop immediately if you lose sight of the signaller.

  • Before tipping, confirm the ground is level and firm, the area behind is clear, and the edge is protected by a stop block or earth berm; tip into the wind where dust is a hazard.

  • Park with the skip lowered, controls in neutral, parking brake applied, keys removed, and on a gradient chock the wheels; refuel only with the engine off and no ignition sources nearby.